CORAYVAC
®
I
NSTALLATION
O
PERATION
AND
S
ERVICE
M
ANUAL
6 of 54
3.2 Clearance Data
NOTE:
1. All dimensions are from the s
u
rfaces of all t
u
bes, co
u
plings, tees, elbo
w
s and crosses.
2. Clearances B, C and D can be red
u
ced by 50% after 7.5 m (25') of t
u
bing do
w
nstream
from
w
here the b
u
rner and b
u
rner t
u
be connect.
3. All meas
u
rements are in Millimeters.
CLEARANCES TO COMBUSTIBLES
Figure 3:
STANDARD REFLECTOR
Model
A
B
C
D
CRT-10
150
510
1220
510
CRT-15
150
510
1220
510
CRT-20
150
510
1220
510
CRT-25
150
920
1530
920
CRT-30
150
920
1530
920
B
C
D
A
Figure 4:
ONE SIDE REFLECTOR
Model
A
B
C
D
CRT-10
150
305
1430
510
CRT-15
150
305
1430
510
CRT-20
150
305
1430
510
CRT-25
150
305
1530
1070
CRT-30
150
305
1530
1070
A
B
C
D
Figure 5:
TWO SIDE REFLECTORS
Model
A
B
C
D
CRT-10
150
305
1430
305
CRT-15
150
305
1430
305
CRT-20
150
305
1430
305
CRT-25
150
305
1530
305
CRT-30
150
305
1530
305
A
B
C
D
Содержание CoRayVac CRT-10
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 53: ...SECTION 14 TROUBLESHOOTING 47 of 54 14 1 Troubleshooting Flow Chart ...
Страница 61: ......