1 Introduction
MANUAL TME400-VCF · EN04 · 2019 March 26th
14
1.2.8.
Scope of delivery
The scope of delivery can differ depending on the optional orders. The following is
"normally” included in the scope of delivery:
Part
Quan-
tity
TME400-VC (or TME400-VCF) turbine meter with integrated elec-
tronic volume corrector
1
1 Lubricating oil bottle
Op-
tional
Lubricating instructions
1
Manual
1
Test log
1
Calibration certificate
1
Material test certificate
1
Strength test certificate 3.1.
Op-
tional
1.2.9.
Disposal of packaging material
Dispose of the material in an environmentally friendly manner in accordance with na-
tional standards and directives.
1.2.10. Storage
Avoid extended periods of storage. After storage, inspect the device for damage and
test for correct function. Contact the RMG service department to arrange for inspec-
tion of the device after a storage period of longer than one year. For this purpose, re-
turn the device to RMG.
Note
Storage must take place in a dry and protected room.
It must be ensured that all open pipes are sealed.
Содержание TME400-VC
Страница 6: ......
Страница 47: ...2 Installation MANUAL TME400 VCF EN04 2019 March 26th 41 Ex version...
Страница 48: ...2 Installation MANUAL TME400 VCF EN04 2019 March 26th 42 Ex version with current module...
Страница 49: ...2 Installation MANUAL TME400 VCF EN04 2019 March 26th 43 Non Ex version...
Страница 109: ...APPENDIX MANUAL TME400 VCF EN04 2019 March 26th 103 D Seal diagrams Will be added as soon as available...
Страница 111: ...MANUAL TME400 VCF EN04 2019 March 26th 105...