background image

Assemble Front Wall and Gable

5.1

The door frame is 65¼” high from the base. To avoid adjusting the placement after assembly, 

prepare door frame using the exact measurements listed in these steps. 

B-2
S-2C

4

2

Connector

QTY

Connector

QTY

S-2A
S-2B

16

16

Fit B-2 connector onto profile and position so bottom 

of connector measures 8” from bottom of profile. 

Secure each with two bolts.  

Prepare two F-3 profiles. 

Slide three set screws 

into bolt track and 

position as shown.

QTY

Profile

2

F-3

F-1

F-6

2

2

56”

15

 

⅞”

Prepare two F-6 profiles. Slide set screws into both bolt tracks on mitered end of profile and 

one bolt track on the other end. The single set screw will sit on the inside when installed. Hand 

tighten each set screw to hold in place.

F-6

F-6

5.2A

5.2B

5.1A

5.1B

Prepare two F-1 wall profiles. Slide set screws into same bolt track, one on each end of profile. 

Position profile so set screw near base is on the inside when installed. Hand tighten each set 

screw to hold in place.

F-1

F-1

23”

F-3

F-3

8”

(203mm)

8”

(203mm)

F-3

F-3

B-3

B-3

WARNING: The cut edge of  F-3 profile is 

sharp. Use extreme caution when handling.

WWW.RSIWW.COM

21 of 46

NOTE: Have the hex shaped indent facing up. Screw in until it is flush with bottom of nut so 

it slides easily into bolt tracks. After inserting into bolt track, screw in until it holds in place.

Make certain the pieces are in the correct positions before assembling. 

Carefully follow the order of assembly to ensure an easy installation.

Wear proper safety gear including work shoes, gloves and goggles.

Prepare needed set screws as shown in step 1.1A

Содержание Monticello 8x20

Страница 1: ...MonticelloTM 65 Fleetwood Drive Rockaway NJ 07866 Customer Service 877 373 3078 Email customerservice risww com Made in the USA WARRANTY 10 YEAR 8 x 20 Greenhouse Assembly Instructions 071812...

Страница 2: ...y maintain the greenhouse Please read these instructions completely before you begin Thank you for purchasing your MonticelloTM 8x20 Greenhouse The Monticello line is proudly made in the USA by a lead...

Страница 3: ...small children Keep children and pets away from the assembly area until the work is completed Always wear work shoes gloves and safety goggles when working Some of the parts have sharp edges and burs...

Страница 4: ...to ensure it is level at every point If you are not building on a wood deck we recommend constructing a wood platform so you can properly secure the greenhouse You must assure your foundation is squar...

Страница 5: ...epare for each step according to instructions in this manual If any parts are missing or damaged contact Riverstone Customer Service before beginning assembly Customer Service 877 373 3078 or email cu...

Страница 6: ...G Use extreme caution when handling panels with cut edges The corners are sharp QTY Brace B 9 4 Step 8 24 x 65 QTY Assembled Doors and Vents D 2L Step 10 1 D 2R Step 10 1 Step 9 V 2 4 24 x 24 D 2R D 2...

Страница 7: ...10 6 of 46 WWW RSIWW COM QTY Included Tools T 1 Steps 8 9 10 11 Steps 1 2 3 4 5 6 7 8 10 1 T 3 Steps 2 3 4 1 T 4 Step 8 4 T 2 1 Wrench Phillips Screwdriver 23 Spacer 5 Bungee Cord 4 QTY Vent Opener V...

Страница 8: ...rk shoes gloves and goggles QTY Profile 4 P 1A 4 P 1B 3 P 2A 3 P 2B The base is made up of four P 1A four P 1B three P 2A and three P 2B profiles Arrange profiles in a rectangle as shown Position P 2A...

Страница 9: ...show the set screw placement IMPORTANT When assembling base make certain the profiles are straight and flush against each other Secure profiles together and ensure corners are square The diagonal meas...

Страница 10: ...r size is not shown proportionally in this drawing Make certain corners line up and are flush Adjust position of set screws in inner bolt track to fit holes in B 8 connector Secure with four bolts Rep...

Страница 11: ...t slides easily into bolt tracks After inserting into bolt track screw in until it holds in place Make certain the pieces are in the correct positions before assembling Carefully follow the order of a...

Страница 12: ...EWS ARE FROM OUTSIDE IMPORTANT The panels expand and contract depending on the temperature To ensure proper placement use the 23 inch spacer included with the tools 2 2A 2 2B 2 2C Begin at front right...

Страница 13: ...profiles by sliding four set screws into bottom bolt track Hand tighten each end set screw to hold in place Prepare three G 2 gutter profile with six set screws and one G 2 gutter profile with five se...

Страница 14: ...w is centered Fit B 5 connector onto gutter and hold in place using the two end bolts Loosen set screws on side profiles and slide down Fit wide part of B 3 connector onto set screw slide up into plac...

Страница 15: ...e two F 10 profiles Slide set screws into both bolt tracks on each end of two F 10 profiles Hand tighten each set screw to hold in place F 6 F 6 F 10 F 10 NOTE Set screw in center bolt channel is used...

Страница 16: ...base and corner profile placing side marked UV Resitant facing outside B 3 S 2C 4 2 Connector QTY W 1 1 Panel QTY 24 x 57 B 3 S 2C 6 3 Connector QTY W 1 3 Panel QTY 24 x 57 NOTE Panels will not fit c...

Страница 17: ...rs Fit B 1 connector to profiles as shown S 2C 9 Connector QTY B 1 3 Working from inside right corner place F 6 profile with mitered end next to corner and angled edge facing up onto corner W 1 panel...

Страница 18: ...in place Make certain the pieces are in the correct positions before assembling Carefully follow the order of assembly to ensure an easy installation Wear proper safety gear including work shoes glov...

Страница 19: ...ner Remove plastic film from both sides of one W 1 panel Fit panel into channel in base and corner profile placing side marked UV Resistant facing outside B 3 S 2C 22 11 Connector QTY W 1 10 Panel QTY...

Страница 20: ...ter Seams are centered to bolt tracks in F 1 profiles S 2A S 2B 2 2 Prepare two G 1 gutter profiles by sliding four set screws into bottom bolt track Hand tighten each end set screw to hold in place P...

Страница 21: ...rt of B 3 connector onto set screw slide up into place fitting gutter set screw at other end Tighten set screws and secure with bolts B 3 S 2C 42 11 Connector QTY B 5 5 Connector QTY B 3 B 3 B 5 F 7 G...

Страница 22: ...d Hand tighten each set screw to hold in place F 6 F 6 5 2A 5 2B 5 1A 5 1B Prepare two F 1 wall profiles Slide set screws into same bolt track one on each end of profile Position profile so set screw...

Страница 23: ...panel into channel in F 1 profile and slide F 1 profile against spacer to ensure proper placement IMPORTANT The panels expand and contract depending on the temperature To ensure proper placement use t...

Страница 24: ...nside front right corner install F 1 profile next to W 1 panel Place 23 inch spacer on base next to F 7 corner profile and slide F 1 profile against spacer to ensure proper placement F 1 W 1 F 7 F 6 G...

Страница 25: ...le to F 5 profile and adjust set screws to fit B 2 connector Secure with three bolts Turn profiles over and place on flat surface Slide two set screws into bolt tracks of F 4 and F 5 profiles Repeat s...

Страница 26: ...s placing side marked UV Resistant facing outside NOTE VIEWS FROM INSIDE NOTE VIEWS FROM INSIDE W 5 2 Panel QTY 24 x 21 B 2 B 2 F 5 Secure with two bolts Ensure height to base is 65 S 2C 2 Connector Q...

Страница 27: ...cure with bolts Repeat on other side Check inside corners to ensure B 7 connector is still in proper position If it needs adjusting repeat steps 5 8 and 5 9C through 5 9D until each corner is set S 2C...

Страница 28: ...aution when handling F 7 F 7 Prepare two F 7 corner profiles Slide set screws into the same bolt track one on each end of profile Tighten each set screw to hold in place WWW RSIWW COM 27 of 46 NOTE Ha...

Страница 29: ...nnector 6 4A 6 4B Secure each B 1 connector with four bolts F 6 F 10 F 10 F 3 F 3 F 1 F 1 F 1 F 2 Work from outside to add B 1 connectors in the same position Loosen set screws on profiles and adjust...

Страница 30: ...outside 6 6A 6 6B 6 6C From outside fit F 7 profiles into each side of back Arrange the profile so channel lines up with tops of panels and the set screws on each end are visible Begin with either ri...

Страница 31: ...5 connectors using a total of eighteen set screws and four long hex bolts Arrange profile so bolt track is facing up Slide set screws into bolt track on each end of profile as shown S 2A S 2B 18 S 5A...

Страница 32: ...e ensure all pieces are still flush and secure roof ridge to front Loosen set screws and adjust position to fit holes in C 2 connector Secure with three bolts Make sure end of roof ridge is flush to p...

Страница 33: ...Slide one set screw into bolt track on each end of profile Tighten to hold in place F 1 F 1 F 1 F 1 F 1 F 1 F 1 F 1 F 1 F 1 195 8 498mm F 1 F 1 F 1 F 1 F 1 F 1 F 1 WWW RSIWW COM 32 of 46 NOTE Have the...

Страница 34: ...require slight force to install Do not use excessive force or you may move profiles out of position When you are having dificulty sliding the panels use dish soap with water on the edges as a lubrican...

Страница 35: ...m back right corner remove plastic film from both sides of one W 1 panel With side marked UV Resistant facing outside fit top end of panel into channel in R 1 roof ridge near corner Push panel into ro...

Страница 36: ...ntil the other end rests on gutter ledge and then slide towards F 1 profile at back Hold two profiles together in place at ridge using one B 4 connector Line up center hole with long hex bolt in roof...

Страница 37: ...ide B 4 S 2C 6 3 Connector QTY W 1 2 Panel QTY 24 x 57 W 1 W 1 NOTE VIEWS FROM INSIDE NOTE VIEWS FROM INSIDE NOTE VIEW FROM OUTSIDE Remove next bungee cord and continue working from back to install se...

Страница 38: ...til the other end rests on gutter ledge and then slide towards F 1 profile at back Repeat to install W 1 panel on left 8 6D W 1 W 1 NOTE VIEW FROM OUTSIDE Hold two profiles together at ridge using one...

Страница 39: ...l next two W 1 panels and F 1 profiles NOTE VIEW FROM OUTSIDE Remove plastic film from both sides of one W 1 panel With side marked UV Resistant facing outside install the next panel on the right at t...

Страница 40: ...ght angle sliding all the way into profile Fit other end into opposite profile If necessary apply slight pressure to bend panel and snap into place W 1 F 1 F 1 F 7 W 1 W 2 NOTE VIEW FROM OUTSIDE W 2 4...

Страница 41: ...nd G 2 gutter profiles to hold roof panels in place Working from outside begin at front corner Position G 4 trim plate over gutter and use handle of screw driver to tap into place Use two G 4 and thre...

Страница 42: ...s in end of cylinder line up with holes in arm A Push arms apart if necessary Secure with a threaded stud on each side Turn adjusting screw clockwise until arms are aproximately 6 apart Repeat steps 9...

Страница 43: ...n attach the other arm of opener to top of inside W 2 profile Screw two S 1 screws through panel and into gripping channel on other side to secure Do not over tighten as it may damage the vent Repeat...

Страница 44: ...ile D 1L 1 D 1R 1 37 B 2 F 5 F 4 NOTE VIEW FROM OUTSIDE NOTE ALL VIEWS FROM OUTSIDE NOTE ALL VIEWS FROM OUTSIDE D 1R D 1L D 1L F 5 F 7 D 1R F 7 F 5 IMPORTANT Position D 1L and D 1R door tracks with li...

Страница 45: ...Y 44 of 46 WWW RSIWW COM B 3 D 5 B 3 B 3 D 4 D 4 D 1L D 1R F 1 P 1B P 1A F 1 Working from the outside apply the D 4 door sealant tape to the outside of F 1 profiles that make up the door frame This ta...

Страница 46: ...d Doors QTY From the inside place the D 5 door guide bracket into the channel in the base profile lining holes in bracket with holes in bottom door Use two S 3 screws to secure Repeat to install one b...

Страница 47: ...2A 11 2B A 2 10 Bracket QTY A 1 10 Ground Anchor QTY S 2C 20 S 4 89 Connector QTY S 4 Attach each anchor bracket with two set screws in the inside bolt channels in base profile Secure each with two b...

Отзывы: