10.3.3
Disposal of the old tank and installation of a new tank
1.
The release unit (Fig. 53 ) is labelled as "RELEASED" as it is a pyrotechnic
element.
2.
Dispose of the old tank in a proper and professional manner.
The fastening material is not included in the scope of delivery of the new
tank to be installed. Keep the fastening material if the new tank is not installed
directly after the removal of the old tank.
3.
L
WARNING! Danger of a faulty release!
Ensure that the blocking switch is set to "Agent disconnect [blocked]" before
installing a new tank.
4.
Install the new tank in the reverse order.
5.
Perform inspections and maintenance as per
maintenance and repairs by the Authorized Distributor” on page 63
.
10.4
Firmware update
A new Firmware update can be copied to the system using the Maintenance Pro-
Chapter 9 „Maintenance program” on page 55
.
Fig. 53: Release unit
Repairs
Operating Instructions / DET-AC III Slave / 916007 / 05-2016 / en_US
74
Содержание 7338.321
Страница 82: ...Appendix Appendix Operating Instructions DET AC III Slave 916007 05 2016 en_US 82 ...
Страница 84: ...Operating Instructions DET AC III Slave 916007 05 2016 en_US 84 ...
Страница 85: ......
Страница 86: ...Ì916007 Î ...