It is preferable for maintenance to take place on a fixed workspace which was
designed for this purpose and has a 100 to 240 V connection.
L
WARNING
Danger of injury from faulty release!
A faulty release of the system may cause severe injuries and property damage.
● Block all networked systems using the blocking switch (Fig. 42 /arrow) (switch
the blocking switch to "Agent disconnect [blocked]" (Fig. 42 /
Ⅱ
)) prior to per-
forming maintenance work.
L
WARNING
High voltage!
An imminent risk of death or severe physical injury due to electric shock.
● All tasks at the open system may only be performed by electricians with appro-
priate training.
NOTICE
Property damage from alarm release!
The alarm can/should be released during maintenance tasks.
● Shut down/bypass all downstream controllers (e.g. transmission or shutdown)
prior to performing any maintenance tasks.
Annual Inspection/Maintenance (Authorized Distributor)
Visual inspection, full maintenance (e.g. check and clean the discharge nozzle
where applicable) and function test.
The event memory must be checked for failures
In the course of maintenance, the system is checked fully and, where applicable, put
back into target state. Non-compliance with these intervals can cause failures and
false alarms and consequently to faulty extinguishing.
During maintenance, the total weight of the system must be reported.
Fig. 42: Blocking switch
Repairs
Operating Instructions / DET-AC III Slave / 916007 / 05-2016 / en_US
65
Содержание 7338.321
Страница 82: ...Appendix Appendix Operating Instructions DET AC III Slave 916007 05 2016 en_US 82 ...
Страница 84: ...Operating Instructions DET AC III Slave 916007 05 2016 en_US 84 ...
Страница 85: ......
Страница 86: ...Ì916007 Î ...