COMMISSIONING: CO AND COMBUSTION RATIO CHECK

 

 

 

 

 

 

 

 

 

 

SET BOILER TO MAXIMUM RATE 

In accordance with, section 7.3, set boiler to operate at maximum rate (full load condition). Allow sufficient time for combustion to 
stabilise. , insert analyser probe into air inlet sampling point. 

      

 

    

 

 

 

               

 

  

 

Is O2 

20.6% 

and CO2 < 0.2%? 

Verify flue integrity 

Analyser readings indicate 

that combustion products 

and inlet air are mixing. 

Further investigation of the 

flue is therefore required. 

Check that flue components 

are correctly assembled, 

fixed and supported as per 

boiler/flue instructions. 

Check that flue and flue 
terminal are not obstructed. 

Is O2 ≥20.6%

 

and CO2 < 0.2%? 

 

CHECK CO AND 

COMBUSTION RATIO 

AT MAXIMUM RATE

With boiler still set at 
maximum rate, insert 

analyser probe into flue 
gas sampling point. 

Allow readings to 
stabilise before 

di

 

 

Is CO less than 

350ppm AND 

CO/CO

ratio less 

than 0.004? 

YES 

N

YES 

NO 

Check all seals 

around the appliance 
burner, internal flue 
seals, door and case 

seals. Rectify where 
necessary. 

Is CO less 

than 350ppm 

AND 

CO/CO

ratio 

less than 
0.004? 

CHECK CO AND COMBUSTION 

RATIO AT MINIMUM RATE 

With boiler set at minimum rate, 

insert analyser probe into flue 

gas sampling point. Allow 

readings  to stabilise before 

recording. 

 

NO 

Turn off appliance and 

call Vokera’s technical 

helpline for advice. 

The appliance must not 

be commissioned until 

problems are identified 

and resolved. 

Turn off appliance and call 

Vokera’s technical helpline 

for advice. 

The appliance must not be 

commissioned until 

problems are identified and 

resolved. If commissioning 

cannot be fully completed, 

the appliance must be 

disconnected from the gas 

supply in accordance with 

the GSIUR. 

NOTE: Check and record CO and 
combustion ratio at both 
maximum AND minimum rate 
before contacting the Vokera 

   

SET BOILER TO 

MINIMUM RATE

In accordance with 

section 7.3, set 
boiler to operate at 
minimum rate (to 

minimum load 
condition).  Allow 

sufficient time for 
combustion to 
stabilise. 
 

YES 

Is CO < 350ppm 

and CO/CO

ratio 

less

 

than 0.004 ?

 

NO 

Boiler is operating satisfactorily

No further actions required.

Ensure test points are capped, boiler case is correctly replaced and all other commissioning procedures are completed. 
Complete Benchmark Checklist, recording CO and combustion ratio readings as required. 

NOTE 

The air/gas ratio valve is factory-set and must not be 
adjusted during commissioning unless this action is 
recommended, following contact with the Vokera 
technical help line. If any such adjustment is 
recommended and further checking of the boiler is 
required, the engineer must be competent to carry out 
this work and to use the flue gas analyser accordingly. 
If the boiler requires conversion to operate with a 
different gas family (e.g., conversion from natural gas 
to LPG) separate guidance will be provided by the 
Vokera technical help line and must be followed. 

NO 

BEFORE CO AND COMBUSTION RATIO CHECK

The installation instructions should have been followed, gas 

type verified and gas supply pressure/rate checked as required 

prior to commissioning. 
As part of the installation process, 

ESPECIALLY WHERE A 

FLUE HAS BEEN FITTED BY PERSONS OTHER THAN THE 
BOILER INSTALLER
, visually check the integrity of the whole 

flue system to confirm that all components are correctly 
assembled, fixed and supported. Check that the maximum flue 

lengths have not been exceeded and all guidance has been 
followed (e.g. Technical Bulletin 008).

 

The flue gas analyser should be of the correct type, as specified 
by BS 7967. 

Before use, the flue gas analyser should have been maintained 
and calibrated as specified by the manufacturer. The installer 

must have the relevant competence for use of the analyser. 
Check and zero the analyser 

IN FRESH AIR, as per analyser 

manufacturer’s instructions. 

YES 

YES 

Содержание Vokera Compact 25A

Страница 1: ...USER Vok ra is a licensed member of the Benchmark scheme which aims to improve the standards of installation and commissioning of domestic hot water systems in the UK Compact A High efficiency combi b...

Страница 2: ...E CO2 AND ADJUSTING THE GAS VALVE 31 Commissioning checklist 32 Benchmark 33 35 1 THINGS YOU SHOULD KNOW 1 1 1 GAS APPLIANCES 1 1 2 ELECTRICAL SUPPLY 1 1 3 GUARANTEE REGISTRATION CARD 1 1 4 APPLIANCE...

Страница 3: ...been designed to meet and exceed the very latest standards in gas central heating technol ogy and if cared for will give years of reliable use and efficiency Please therefore take some time to read t...

Страница 4: ...for standard central heating The automatic temperature control function SARA is set within the blank bullet points The display shows the temperature values Pressure gauge shows the current pressure o...

Страница 5: ...the boiler are turned on Turn the mode selector switch to the ON position When there is a request for heating or hot water via the time clock or pro grammer the boiler will begin an ignition sequence...

Страница 6: ...l not exceed the maximum Filling the siphon before using the appliance and the use of a safety cut off device inside the siphon prevent exhaust gases from being released into the environment Repeat du...

Страница 7: ...your boiler has been installed with the Vok ra mechanical clock it can be used and adjusted as follows Setting the time The time of day can be set by grasping the outer edge of the black dial and tur...

Страница 8: ...EU Low voltage directive 2014 35 EU Directive 2009 125 EC Ecodesign for energy using appliances Regulation EU 2017 1369 Energy labeling Delegated Regulation EU No 811 2013 Delegated Regulation EU No 8...

Страница 9: ...boiler will perform a three minute anti cycle timer delay When the request for heat has been satisfied the appliance pump and fan may continue to operate to dissipate any residual heat within the appl...

Страница 10: ...itres Maximum system volume 74 litres Pre charge pressure 1 bar 2 6 Dimensions Height mm 715 Width mm 405 Depth mm 250 Dry weight kg 29 29 29 2 7 Clearances Sides 12mm Top 150mm from casing or 25mm ab...

Страница 11: ...art load elmin 10 4 12 8 13 1 W In Stand by mode PSB 2 4 2 0 2 4 W Other parameters Stand by heat loss Pstby 40 0 35 0 35 0 W Pilot flame energy consumption Pign W Annual energy consumption QHE 53 63...

Страница 12: ...lcony level 300 mm J From a surface or boundary facing the terminal 600 mm K From a terminal facing a terminal 1200 mm L From an opening in the car port into the building 1200 mm M Vertically from a t...

Страница 13: ...POINT A method for initial filling of the system and replacing water lost during servicing etc directly from the mains supply is provided see fig 9 This method of filling complies with the current Wa...

Страница 14: ...efittedinaccordancewiththeInstituteofGasEngineers publication IGE UP 7 Guide for Gas Installations in Timber Frame Buildings 3 10 WATER TREATMENT Vokera recommend that water treatment be carried out i...

Страница 15: ...uthority regulations 3A 6 7 LOW PRESSURE SEALED SYSTEM An alternative method of filling the system would be from an independent make up vessel or tank mounted in a position at least 1 metre above the...

Страница 16: ...em ordownloadtheinstructionsfromtheVokera website The appliance flue outlet elbow can be rotated through 360 on its vertical axis In addition the flue may be extended from the outlet elbow in the hori...

Страница 17: ...ting an extension to the required length you must ensure that the excess is cut from the plain end of the extension see fig 12 15 Remove any burrs and check that all seals are located properly You mus...

Страница 18: ...the appropriate brackets if when an extension is cut to a shorter length ensure that the excess length is cut from the plain end of the extension and that any burrs or rough edges are removed allseal...

Страница 19: ...nal waste water pipework in accordance with BS6798 BS6798 provides comprehensive instruction and advice on all permissible condensate disposal methods notwithstanding this it is essential that the fol...

Страница 20: ...l forwards and down Locate the terminal block cover fig 26 NOTE The appliance is supplied with a plug play controls lead that enables quick and easy connection to various Vok ra controls refer to Sect...

Страница 21: ...static heads Adjust radiator return valves and any branch circuit return valves until the individual return temperatures are correct and are approximately equal 5 11 1 REGULATING THE DHW FLOW RATE The...

Страница 22: ...g electrodes insulation panelling etc avoid direct contact with any cleaning appliance e g brushes aspira tors blowers etc This component does not need any maintenance please do not remove it from its...

Страница 23: ...cal plug and leads from the gas valve slacken and unscrew gas valve inlet and outlet connections Please note the sealing washers Q must be discarded and replaced with new sealing washers Unscrew gas p...

Страница 24: ...nd or DHW non return cartridge T1 Ensure all seals are in good condition taking care to ensure they are replaced correctly Replace in the reverse order ensuring the cartridge is facing the correct way...

Страница 25: ...ch B2 Using a small screwdriver gently ease the flow restrictor C2 from its seating Replace in the reverse order Ensure all seals are in good condition taking care to ensure they are replaced correctl...

Страница 26: ...increases the gas rate to 75 for a period of 15 minutes The speed of the fan and therefore the output of the boiler is determined by the temperature of the water sensed by the flow temperature sensor...

Страница 27: ...isplay shows ACO and the boiler operates at maximum heating Insert the flue gas analyser probe into the flue gas test point see fig 41 Operate the boiler in combustion analysis mode see 7 3 1 and comp...

Страница 28: ...min output Min 25 CO function max temp C 90 CO re light temp C 78 CO function time 15 min Flow NTC max temp C 90 High limit thermostat C 105 Flue NTC max temp C 125 Maximum differential C 35 IGNITION...

Страница 29: ...ctor switch to the ON position press the CO button once the display will then scroll through the fan speeds along with the relevant icon 7 10 2 THERMOREGULATION To set the temperature regulation curve...

Страница 30: ...nge JP7 removed T45 Maximum set point for low T range JP7 inserted Fig 48 1 12 CN11 1 4 CN10 1 7 CN9 CN6 CN5 CN12 1 CN4 1 3 CN3 1 2 CN2 1 6 CN1 1 FA1 FA2 orange F S 1 JP1 JP2 JP3 JP4 JP5 JP6 JP7 JP8 C...

Страница 31: ...xternal time control The kit is comprised of the following lower cover mechanical clock wiring harness instructions Isolate the appliance from the electrical supply remove the boiler casing see 4 7 1...

Страница 32: ...AMP black red blue brown 4 4 Connector clock AKL05 GAR CN8 FUNCTIONAL DIAGRAM Fig 51 NOTE L N E connection is advisable AKL05GAR Main PCB with vis medium integrated P1 Selector switch and heating pot...

Страница 33: ...THE CO2 AND ADJUSTING THE GAS VALVE refer to the Section 7 3 Fig 52 BS 5440 PARTS 1 2 FLUES VENTILATION REQUIREMENTS BS 5449 PART 1 FORCED CIRCULATION OF HOT WATER SYSTEMS BS 5482 PART 1 DOMESTIC BUTA...

Страница 34: ...TO MINIMUM RATE In accordance with section 7 3 set boiler to operate at minimum rate to minimum load condition Allow sufficient time for combustion to stabilise YES Is CO 350ppm and CO CO2 ratio less...

Страница 35: ...ommissioning checklist completed in full To instigate the boiler guarantee the boiler needs to be registered with the manufacturer within one month of the installation To maintain the boiler guarantee...

Страница 36: ...terlock Provided ALL SYSTEMS The system has been flushed and cleaned in accordance with BS7593 and boiler manufacturer s instructions Yes What system cleaner was used What inhibitor was used Quantity...

Страница 37: ...gister No Record At max rate CO ppm AND CO At min rate Where Possible CO ppm AND CO Comments Signature SERVICE 04 Date Engineer name Company name Telephone No Gas safe register No Record At max rate C...

Страница 38: ...structions must be provided e g Benchmark Service Record If this condition is not met the period of warranty will extend to only 12 months from date of installation By registering your appliance you w...

Страница 39: ...from a Trading Standards Authority or a Citizen Advice Bureaux Your Personal Details Vok ra takes care of your personal details in order to protect your privacy Below we detail how we use any data you...

Страница 40: ...1HG enquiries vokera co uk www vokera co uk www vokera ie Sales General Enquires T 0344 391 0999 F 0344 391 0998 Vok ra Ireland West Court Callan Co Kilkenny T 056 7755057 F 056 7755060 Vok ra Limited...

Отзывы: