background image

Vokèra Warranty Terms and Conditions 

Vokèra Ltd offer customers the comfort of a parts and labour warranty repair service subject to the following terms 

and conditions.
Vokèra Ltd only obligation under the guarantee shall be to repair or replace the faulty appliance at Vokèra Ltd 

discretion. This will be carried out where a fault arises from defects within the appliance, caused by either material 

or workmanship of the manufacturer.
1.  The boiler must have been installed and commissioned within 12 months of manufacture by a registered Gas 

Safe (RGII ROI) installer in accordance with the guidelines in the installation and servicing booklet provided 

with the boiler.

2.  This guarantee does not protect malfunction or damage arising from incorrect installation, commissioning or 

maintenance procedures, as laid out in the installation handbook, inefficient flue system, poor or incorrect 

electricity, wrong gas supply or pressure, tampering by inexperienced persons and any other cause not directly 

due to manufacture.

3.  Vokèra Ltd cannot accept responsibility for any costs arising from repair or maintenance carried out by any third 

party.

4.  The “Benchmark” commissioning sheet must be completed by the installer and left with the boiler for reference 

purpose.

5.  The warranty will commence from the date of installation. Without proof of purchase ie an invoice or completed 

“Benchmark” commissioning sheet, the warranty will commence from the date of manufacture as detailed on 

the appliance data plate.

6.  To qualify for the full term of warranty, the boiler must be serviced once annually by a Gas Safe Registered 

Engineer (RGII ROI). Proof of annual service in accordance with the manufacturer’s instructions must 

be provided (e.g. Benchmark Service Record). If this condition is not met the period of warranty will 

extend to only 12 months from date of installation.

By registering your appliance, you will be helping us provide you with the best after sales service in the unlikely 

event that your boiler requires attention during the guarantee period. 

Register online: www.vokera.co.uk (UK) or www.vokera.ie (ROI) 

If the boiler suffers a mechanical or an electrical breakdown or you require an annual service, please contact our  

Customer Care Centre on: 

UK: 01274 866100
ROI: 056 7755057 
Our normal working hours, excluding Bank holidays are: 
8.15am - 5.00pm Monday to Friday
8.00am - 12.00pm Saturday (UK only) 

We will arrange for an engineer or appointed agent, to inspect and repair, or where in our sole opinion repair is not 

economic, arrange to replace the boiler. 

7.  Health & Safety:

a.  Engineers will only attend to boiler products where it is considered by the engineer that the installation does not 

pose a risk to health and safety.

b.  A permanently fixed access ladder must service installations in lofts or attics. Adequate lighting and permanently 

fixed flooring must also be available.

c.  Cupboard installations must provide minimum working clearances as detailed in the installation instructions. 

Vokèra will not accept responsibility for the removal of cupboards, kitchen units or trims in order to gain access 

for repairs.

8.  Warranty does not apply:

a.  If the boiler is removed from its place of installation without our prior consent.

b.  To any defect, damage or breakdown caused by inadequate servicing of the boiler or by deliberate action, 

accident, misuse or third party interference including modification or an attempted repair which does not fully 

comply with industry standards.

c.  To any defect, damage or breakdown caused by the design, installation and maintenance of the central heating 

system.

d.  To de-scaling or other work required as a result of hard water scale deposits or from damage caused by 

aggressive water or sludge resulting from corrosion. Indications that such work may be required include a noisy 

boiler, cold spots on radiators, sludge in pipes and poor circulation of the central heating system.

e.  If the claim/contact procedure set out in section 6 is not adhered to.

f.  To any other costs or expenses caused by or arising as a result of the breakdown of a Vokèra Boiler.

g.  To any costs incurred during delays in fixing reported faults.

9.  We reserve the right to a charge a callout fee where:

a.  There is no completed “Benchmark” commissioning sheet or equivalent control document present.

b.  There is incomplete or no service record(s) for each and every year the boiler has been installed.

c.  A fault cannot be found.

d.  The breakdown or fault has been caused by an event, which is excluded from the warranty – see section 8.

e.  Failure to cancel an agreed appointment prior to our engineers visit.

f.  The boiler is outside the period of warranty or the conditions of the warranty have not been met.
10. If we fit replacement parts or replace a boiler it will not extend the period of the warranty. All replaced parts or 

boilers will become the property of Vokèra Ltd.

11.  The warranty applies only where a Vokèra boiler has been installed in a domestic dwelling in the United Kingdom, 

Northern Ireland or Republic of Ireland, to provide heat and/or hot water to the central heating system.

12. Vokèra Ltd warranty is offered in addition to the rights provided to a consumer by law. Details of these rights 

can be obtained from a Trading Standards Authority or a Citizen Advice Bureaux.

Your Personal Details 

Vokèra takes care of your personal details in order to protect your privacy. Below we detail how we use any data 

you provide us with and how we manage that data to protect it. 
Personal data is collected by us confidentially and in accordance with data protection law regulations. Vokèra is 

registered as a data controller with the Information Commissioner’s Office. 
Your personal data is only stored if you volunteer to provide it, for example, to request information, submit a service 

visit, or to register a product for purposes of warranties and surveys etc. Vokèra will only use your personal data 

to satisfy the request you have made, and will not disclose information to third parties without your prior consent.
Any personal data stored by Vokèra is protected to ensure unauthorised persons cannot access or disclose the 

data. Vokèra uses security measures to protect the data we collect, in order to prevent manipulation, loss and 

destruction. No user information provided is stored anywhere on the internet that can be accessed by the public. 
Vokèra may like to inform you of products and services that you could be interested in, and request your opinion 

of our services. Participation is voluntary and you can request not to receive such communications at any time or 

request your details to be updated by emailing: 

[email protected]

Contact Us:- Customer Care Centre
Tel: 01274 866100 (UK), 056 7755057 (ROI) 

UK: 

Vokèra Ltd, Customer Care, Stubs Beck Lane, West 26 Business Park, Whitehall Road, Cleckheaton, BD19 4TT 

ROI: 

Vokèra Ltd, Customer Care, West Court, Callen, Co Kilkenny, Ireland , R95 PW40 

Email: [email protected] (UK), [email protected] (ROI)

Guarantor – Vokèra Ltd, Borderlake House, Unit 7 Riverside Ind Est, London Colney, Herts AL2 1HG 

Содержание Vokera Compact 25A

Страница 1: ...USER Vok ra is a licensed member of the Benchmark scheme which aims to improve the standards of installation and commissioning of domestic hot water systems in the UK Compact A High efficiency combi b...

Страница 2: ...E CO2 AND ADJUSTING THE GAS VALVE 31 Commissioning checklist 32 Benchmark 33 35 1 THINGS YOU SHOULD KNOW 1 1 1 GAS APPLIANCES 1 1 2 ELECTRICAL SUPPLY 1 1 3 GUARANTEE REGISTRATION CARD 1 1 4 APPLIANCE...

Страница 3: ...been designed to meet and exceed the very latest standards in gas central heating technol ogy and if cared for will give years of reliable use and efficiency Please therefore take some time to read t...

Страница 4: ...for standard central heating The automatic temperature control function SARA is set within the blank bullet points The display shows the temperature values Pressure gauge shows the current pressure o...

Страница 5: ...the boiler are turned on Turn the mode selector switch to the ON position When there is a request for heating or hot water via the time clock or pro grammer the boiler will begin an ignition sequence...

Страница 6: ...l not exceed the maximum Filling the siphon before using the appliance and the use of a safety cut off device inside the siphon prevent exhaust gases from being released into the environment Repeat du...

Страница 7: ...your boiler has been installed with the Vok ra mechanical clock it can be used and adjusted as follows Setting the time The time of day can be set by grasping the outer edge of the black dial and tur...

Страница 8: ...EU Low voltage directive 2014 35 EU Directive 2009 125 EC Ecodesign for energy using appliances Regulation EU 2017 1369 Energy labeling Delegated Regulation EU No 811 2013 Delegated Regulation EU No 8...

Страница 9: ...boiler will perform a three minute anti cycle timer delay When the request for heat has been satisfied the appliance pump and fan may continue to operate to dissipate any residual heat within the appl...

Страница 10: ...itres Maximum system volume 74 litres Pre charge pressure 1 bar 2 6 Dimensions Height mm 715 Width mm 405 Depth mm 250 Dry weight kg 29 29 29 2 7 Clearances Sides 12mm Top 150mm from casing or 25mm ab...

Страница 11: ...art load elmin 10 4 12 8 13 1 W In Stand by mode PSB 2 4 2 0 2 4 W Other parameters Stand by heat loss Pstby 40 0 35 0 35 0 W Pilot flame energy consumption Pign W Annual energy consumption QHE 53 63...

Страница 12: ...lcony level 300 mm J From a surface or boundary facing the terminal 600 mm K From a terminal facing a terminal 1200 mm L From an opening in the car port into the building 1200 mm M Vertically from a t...

Страница 13: ...POINT A method for initial filling of the system and replacing water lost during servicing etc directly from the mains supply is provided see fig 9 This method of filling complies with the current Wa...

Страница 14: ...efittedinaccordancewiththeInstituteofGasEngineers publication IGE UP 7 Guide for Gas Installations in Timber Frame Buildings 3 10 WATER TREATMENT Vokera recommend that water treatment be carried out i...

Страница 15: ...uthority regulations 3A 6 7 LOW PRESSURE SEALED SYSTEM An alternative method of filling the system would be from an independent make up vessel or tank mounted in a position at least 1 metre above the...

Страница 16: ...em ordownloadtheinstructionsfromtheVokera website The appliance flue outlet elbow can be rotated through 360 on its vertical axis In addition the flue may be extended from the outlet elbow in the hori...

Страница 17: ...ting an extension to the required length you must ensure that the excess is cut from the plain end of the extension see fig 12 15 Remove any burrs and check that all seals are located properly You mus...

Страница 18: ...the appropriate brackets if when an extension is cut to a shorter length ensure that the excess length is cut from the plain end of the extension and that any burrs or rough edges are removed allseal...

Страница 19: ...nal waste water pipework in accordance with BS6798 BS6798 provides comprehensive instruction and advice on all permissible condensate disposal methods notwithstanding this it is essential that the fol...

Страница 20: ...l forwards and down Locate the terminal block cover fig 26 NOTE The appliance is supplied with a plug play controls lead that enables quick and easy connection to various Vok ra controls refer to Sect...

Страница 21: ...static heads Adjust radiator return valves and any branch circuit return valves until the individual return temperatures are correct and are approximately equal 5 11 1 REGULATING THE DHW FLOW RATE The...

Страница 22: ...g electrodes insulation panelling etc avoid direct contact with any cleaning appliance e g brushes aspira tors blowers etc This component does not need any maintenance please do not remove it from its...

Страница 23: ...cal plug and leads from the gas valve slacken and unscrew gas valve inlet and outlet connections Please note the sealing washers Q must be discarded and replaced with new sealing washers Unscrew gas p...

Страница 24: ...nd or DHW non return cartridge T1 Ensure all seals are in good condition taking care to ensure they are replaced correctly Replace in the reverse order ensuring the cartridge is facing the correct way...

Страница 25: ...ch B2 Using a small screwdriver gently ease the flow restrictor C2 from its seating Replace in the reverse order Ensure all seals are in good condition taking care to ensure they are replaced correctl...

Страница 26: ...increases the gas rate to 75 for a period of 15 minutes The speed of the fan and therefore the output of the boiler is determined by the temperature of the water sensed by the flow temperature sensor...

Страница 27: ...isplay shows ACO and the boiler operates at maximum heating Insert the flue gas analyser probe into the flue gas test point see fig 41 Operate the boiler in combustion analysis mode see 7 3 1 and comp...

Страница 28: ...min output Min 25 CO function max temp C 90 CO re light temp C 78 CO function time 15 min Flow NTC max temp C 90 High limit thermostat C 105 Flue NTC max temp C 125 Maximum differential C 35 IGNITION...

Страница 29: ...ctor switch to the ON position press the CO button once the display will then scroll through the fan speeds along with the relevant icon 7 10 2 THERMOREGULATION To set the temperature regulation curve...

Страница 30: ...nge JP7 removed T45 Maximum set point for low T range JP7 inserted Fig 48 1 12 CN11 1 4 CN10 1 7 CN9 CN6 CN5 CN12 1 CN4 1 3 CN3 1 2 CN2 1 6 CN1 1 FA1 FA2 orange F S 1 JP1 JP2 JP3 JP4 JP5 JP6 JP7 JP8 C...

Страница 31: ...xternal time control The kit is comprised of the following lower cover mechanical clock wiring harness instructions Isolate the appliance from the electrical supply remove the boiler casing see 4 7 1...

Страница 32: ...AMP black red blue brown 4 4 Connector clock AKL05 GAR CN8 FUNCTIONAL DIAGRAM Fig 51 NOTE L N E connection is advisable AKL05GAR Main PCB with vis medium integrated P1 Selector switch and heating pot...

Страница 33: ...THE CO2 AND ADJUSTING THE GAS VALVE refer to the Section 7 3 Fig 52 BS 5440 PARTS 1 2 FLUES VENTILATION REQUIREMENTS BS 5449 PART 1 FORCED CIRCULATION OF HOT WATER SYSTEMS BS 5482 PART 1 DOMESTIC BUTA...

Страница 34: ...TO MINIMUM RATE In accordance with section 7 3 set boiler to operate at minimum rate to minimum load condition Allow sufficient time for combustion to stabilise YES Is CO 350ppm and CO CO2 ratio less...

Страница 35: ...ommissioning checklist completed in full To instigate the boiler guarantee the boiler needs to be registered with the manufacturer within one month of the installation To maintain the boiler guarantee...

Страница 36: ...terlock Provided ALL SYSTEMS The system has been flushed and cleaned in accordance with BS7593 and boiler manufacturer s instructions Yes What system cleaner was used What inhibitor was used Quantity...

Страница 37: ...gister No Record At max rate CO ppm AND CO At min rate Where Possible CO ppm AND CO Comments Signature SERVICE 04 Date Engineer name Company name Telephone No Gas safe register No Record At max rate C...

Страница 38: ...structions must be provided e g Benchmark Service Record If this condition is not met the period of warranty will extend to only 12 months from date of installation By registering your appliance you w...

Страница 39: ...from a Trading Standards Authority or a Citizen Advice Bureaux Your Personal Details Vok ra takes care of your personal details in order to protect your privacy Below we detail how we use any data you...

Страница 40: ...1HG enquiries vokera co uk www vokera co uk www vokera ie Sales General Enquires T 0344 391 0999 F 0344 391 0998 Vok ra Ireland West Court Callan Co Kilkenny T 056 7755057 F 056 7755060 Vok ra Limited...

Отзывы: