65
CONFIGURATION OF THE MAIN BLOCK DIAGRAMS
3.9.1
Electrical power connections Block
diagram 4
MANAGING CONNECTIONS
PB
(ACS)
PC (PS)
MO2
L
N
L
N
L
L
N
L
N
101 102 103 104 105 106 107 108 109 110 111 112 113 114 115
L
N
L
N
MANAGING
PI
PI
PB
PS
V1
V1
Two-way valve (101-102 closing; 103-102 opening)
PB
Storage cylinder circulator
PI
System circulator (high temperature zone)
PS
System circulator
DEPENDING CONNECTIONS
PB
PC (PS)
PI
(ACS)
MO2
L
N
L
N
L
L
N
L
N
101 102 103 104 105 106 107 108 109 110 111 112 113 114 115
L
N
L
N
DEPENDING
V1
P2
V2
V1
Two-way valve (101-102 closing; 103-102 opening)
V2
Mixer valve zone 2 (104: opening - 105: N - 106: closing)
P2
Zone 2 circulator (low temperature)
ACCESSORY CONNECTIONS FOR ADDITIONAL ZONE
SAFETY
THERMOSTAT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
ROOM
THERMOSTAT
FLOW
SENSOR
P3
V3
V3
BUS
MIX VALVE
PUMP
L
L L
N
N L
N
P3
P3
Zone 3 circulator (low temperature) (12-13-14)
V3
Mixer valve zone 3 (9-10 closing; 10-11 opening)
9
Some electric connections of the power jig have a double
function. The hot water tank circulator PB must be connect-
ed to the terminals 106-107 of the thermal module config-
ured as the Managing module. The two-way valve V1 of each
thermal module must be connected to terminals 101-102-103
for both the Managing module and the Depending module.
3.9.2
Sensor connections Block diagram 4
MANAGING CONNECTIONS
BUS 2
BUS 1
PWM
SE
SB
SS
Modbus
MANAGING
MO1
0-10V TA
1
2
3
4
9 10 11 12 13 14 15 16 17 18
5 6 7 8
SS
SE
SB
SS
Primary sensor
SB
Boiler sensor
SE
Outdoor sensor
DEPENDING CONNECTIONS
9
Connections to be made on the first depending module
only.
S2
BUS 2
BUS 1
PWM
SE
SB
Modbus
DEPENDING
0-10V TA
1
2
3
4
9 10 11 12 13 14 15 16 17 18
5 6 7 8
SC
MO1
SC
SC
Secondary sensor
S2
Zone 2 sensor
ACCESSORY CONNECTIONS FOR ADDITIONAL ZONE
SAFETY
THERMOSTAT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
ROOM
THERMOSTAT
FLOW
SENSOR
S3
BUS
MIX VALVE
PUMP
L
L L
N
N L
N
S3
S3
Zone 3 sensor
Содержание Condexa PRO 100
Страница 32: ...32 INSTALLATION 7 Position the GAS manifold 8 Secure the GAS manifold to the frame 7 7 8...
Страница 33: ...33 INSTALLATION 9 Position the manifold closing plugs from the required side 9 22mm 51mm...
Страница 36: ...36 INSTALLATION 7 Position the GAS manifold 8 Secure the GAS manifold to the frame 8 8 7...
Страница 37: ...37 INSTALLATION 9 Position the manifold closing plugs from the required side 9 22mm 51mm...
Страница 83: ...83 COMMISSIONING AND MAINTENANCE...