60
CONFIGURATION OF THE MAIN BLOCK DIAGRAMS
3.5.1
Electrical power connections Block
diagram 2
MANAGING CONNECTIONS
PB
PI
PC (PS)
MO2
L
N
L
N
L
L
N
L
N
101 102 103 104 105 106 107 108 109 110 111 112 113 114 115
L
N
L
N
MANAGING
PB
PI
PC
PC
Thermal module circulator
PB
Storage cylinder circulator
PI
System circulator (high temperature zone)
DEPENDING CONNECTIONS
PC (PS)
PB
PI
(ACS)
MO2
L
N
L
N
L
L
N
L
N
101 102 103 104 105 106 107 108 109 110 111 112 113 114 115
L
N
L
N
DEPENDING
PC
P2
V2
PC
Thermal module circulator
P2
Zone 2 circulator (low temperature)
V2
Mixer valve zone 2 (104: opening - 105: N - 106: closing)
ACCESSORY CONNECTIONS FOR ADDITIONAL ZONE
SAFETY
THERMOSTAT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
ROOM
THERMOSTAT
FLOW
SENSOR
P3
V3
V3
BUS
MIX VALVE
PUMP
L
L L
N
N L
N
P3
P3
Zone 3 circulator (low temperature) (12-13-14)
V3
Mixer valve zone 3 (9-10 closing; 10-11 opening)
3.5.2
Sensor connections Block diagram 2
MANAGING CONNECTIONS
BUS 2
BUS 1
PWM
SE
SB
SS
Modbus
MANAGING
MO1
0-10V TA
1
2
3
4
9 10 11 12 13 14 15 16 17 18
5 6 7 8
SS
SE
SB
SS
Primary sensor
SB
Boiler sensor
SE
Outdoor sensor
DEPENDING CONNECTIONS
9
Connections to be made on the first depending module
only.
S2
BUS 2
BUS 1
PWM
SE
SB
Modbus
DEPENDING
0-10V TA
1
2
3
4
9 10 11 12 13 14 15 16 17 18
5 6 7 8
SC
MO1
SC
SC
Secondary sensor
S2
Zone 2 sensor
ACCESSORY CONNECTIONS FOR ADDITIONAL ZONE
SAFETY
THERMOSTAT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
ROOM
THERMOSTAT
FLOW
SENSOR
S3
BUS
MIX VALVE
PUMP
L
L L
N
N L
N
S3
S3
Zone 3 sensor
Содержание Condexa PRO 100
Страница 32: ...32 INSTALLATION 7 Position the GAS manifold 8 Secure the GAS manifold to the frame 7 7 8...
Страница 33: ...33 INSTALLATION 9 Position the manifold closing plugs from the required side 9 22mm 51mm...
Страница 36: ...36 INSTALLATION 7 Position the GAS manifold 8 Secure the GAS manifold to the frame 8 8 7...
Страница 37: ...37 INSTALLATION 9 Position the manifold closing plugs from the required side 9 22mm 51mm...
Страница 83: ...83 COMMISSIONING AND MAINTENANCE...