INSTALLATION
CASCADE CONFIGURATION B2B (BACK TO BACK)
Assembly of the FLUE SYSTEM DN 160 - DN 200 - DN 250. Components included in code 20131266 - cod. 20132381 - cod. 20131218
1
Carefully cut the bends following the measurements indicated. This allows the flue gas outlet duct to slope by at least 3°
L1
L1
back
L2
L2
back
L3
L3
back
L4
L4
back
L5
L5
back
3°
1
L1
L1
back
L2
L2
back
L3
L3
back
L4
L4
back
L5
L5
back
L1
L1 back
L2
L2 back
L3
L3 back
L4
L4 back
L5
L5 back
172
197
236
275
315
mm
9
A DN80/DN110 adapter is required ONLY FOR Con-
dexa PRO 57 P e Condexa PRO 70 P MODELS with
flue gas outlet DN80. This adapter is to be in-
stalled on the flue outlet and subsequently the
cutting lengths must be reduced by 60mm.
9
ONLY FOR Condexa PRO 135 MODELS, no more than
8 modules.
Содержание Condexa PRO 100
Страница 32: ...32 INSTALLATION 7 Position the GAS manifold 8 Secure the GAS manifold to the frame 7 7 8...
Страница 33: ...33 INSTALLATION 9 Position the manifold closing plugs from the required side 9 22mm 51mm...
Страница 36: ...36 INSTALLATION 7 Position the GAS manifold 8 Secure the GAS manifold to the frame 8 8 7...
Страница 37: ...37 INSTALLATION 9 Position the manifold closing plugs from the required side 9 22mm 51mm...
Страница 83: ...83 COMMISSIONING AND MAINTENANCE...