59
CONFIGURATION OF THE MAIN BLOCK DIAGRAMS
3.4
System parameters Block diagram 1
9
See the section "Putting into service and maintenance" for
a detailed description on parameter operation
Essential parameters to be configured for the block diagram 1:
Managing
Depending
S1
OFF
OFF
Dip-switch
1 to ON
2-10 to ON
Par.73
Stand-alone
Dependent
Par.147
no. of depending
modules installed
/
Par.7
greater than/equal to 10°C greater than/equal
to 10°C
Par.97
1
1 (*)
(*)
Par.97 = 9 (Zone control with Depending module)
Specific parameters to be configured for the block diagram 1:
Managing
Depending
Par.79
adjust according to
requirements
/
Par.80
adjust according to
requirements
/
Par.81
adjust according to
requirements
/
Par.86
adjust according to
requirements
/
Par.87
adjust according to
requirements
/
3.5
Block diagram 2
Circuit with thermal modules with their own circulator, connected in cascade. Using the secondary sensor.
EAF
EAF
PB
PI
P2
V2
S2
SS
SC
P
PR
SE
P3
V3
M
S3
UAC
SB
M
ZM
MANAGING
DEPENDING
DEPENDING
PC
PC
PC
PC
Thermal module circulator
PB
Storage cylinder circulator
PR
DHW circulation pump
PI
System circulator (high temperature zone)
P2
Zone 2 circulator (low temperature)
P3
Zone 3 circulator (low temperature)
S2
Zone 2 sensor
S3
Zone 3 sensor
SB
Boiler sensor
SE
Outdoor sensor
SS
Primary sensor
SC
Secondary sensor
V2
Mixer valve zone 2
V3
Mixer valve zone 3
ZM
Electronic device for zone management (accessory)
EAF
Domestic cold water inlet
UAC
Domestic hot water outlet
Содержание Condexa PRO 100
Страница 32: ...32 INSTALLATION 7 Position the GAS manifold 8 Secure the GAS manifold to the frame 7 7 8...
Страница 33: ...33 INSTALLATION 9 Position the manifold closing plugs from the required side 9 22mm 51mm...
Страница 36: ...36 INSTALLATION 7 Position the GAS manifold 8 Secure the GAS manifold to the frame 8 8 7...
Страница 37: ...37 INSTALLATION 9 Position the manifold closing plugs from the required side 9 22mm 51mm...
Страница 83: ...83 COMMISSIONING AND MAINTENANCE...