22
INSTALLATION
Assembly of the cascade frame B2B - BACK TO BACK. Components included in code 20131664
1
2
3
9
Follow the installation stages indicated. Introduce but do not tighten the screws so any necessary adjustments can be still be
made. Once installation of the entire frame has been completed, only then can the screws be fully tightened.
Содержание Condexa PRO 100
Страница 32: ...32 INSTALLATION 7 Position the GAS manifold 8 Secure the GAS manifold to the frame 7 7 8...
Страница 33: ...33 INSTALLATION 9 Position the manifold closing plugs from the required side 9 22mm 51mm...
Страница 36: ...36 INSTALLATION 7 Position the GAS manifold 8 Secure the GAS manifold to the frame 8 8 7...
Страница 37: ...37 INSTALLATION 9 Position the manifold closing plugs from the required side 9 22mm 51mm...
Страница 83: ...83 COMMISSIONING AND MAINTENANCE...