INSTALLATION REQUIRMENTS
1-1
Ins
ta
lla
tion
1. INSTALLATION
PROCEDURE
1.1 INSTALLATION REQUIRMENTS
1.1.1 ENVIRONMENT
Use this machine at optimum temperature and moisture.
1.1.2 MACHINE LEVEL
Front to back within
±
5 mm (0.2") of level
Right to left
±
5 mm (0.2") of level
1.1.3 MINIMUM SPACE REQUIRMENTS
Right clearance
: Over 95.4 mm (3.82")
Left clearance
: Over 33.8 mm (1.35")
Back side clearance
: Over 166.6 mm (6.66")
Top clearance
: Over 530 mm (21.2")
1.1.4 POWER REQUIRMENTS
!
CAUTION
1. Make sure the plug is firmly inserted in the outlet
2. Avoid multi-wiring.
3. Be sure to ground the machine.
Input Voltage: AC 100V-240V, 1.2 A, 50 to 60Hz
Do not put objects on the power cord.
100
80
60
40
20
10
20
30
40
M
oist
ure [%]
Temperature [ºC]
32.5ºC 20%
32.5ºC 80%
30ºC 80%
10ºC 80%
15ºC 20%
10ºC 20%
30ºC 20%
15ºC 80%
: Optimum temperature and moisture range