Main Machine Installation (B286)
B286/B289 1-14
SM
into the holes.
18. Lift each plate and let it fall, to make sure that they move smoothly on the hinges.
19. Reattach the manual feed table.
20. Reattach the left and right covers.
!
The flat-head screw must be attached at the rear side of each cover.
21. Close the upper unit.
Leveling the Main Machine and Attaching Leg Covers
1. Open the toner hopper cover [1].
2. Set a level [2] on the plate [3] of the development unit.
3. Set the shoes
, , , under the main machine.
Содержание B286
Страница 1: ...B286 B289 SERVICE MANUAL 003165MIU...
Страница 2: ......
Страница 3: ...B286 B289 SERVICE MANUAL...
Страница 4: ......
Страница 5: ...B286 B289 SERVICE MANUAL 003165MIU...
Страница 6: ......
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 27: ......
Страница 29: ......
Страница 34: ......
Страница 35: ...INSTALLATION...
Страница 36: ......
Страница 117: ...PREVENTIVE MAINTENANCE...
Страница 118: ......
Страница 127: ...REPLACEMENT AND ADJUSTMENT...
Страница 128: ......
Страница 186: ...Boards B286 B289 3 58 SM 9 Remove the shield cover A x12 10 Remove A MCU x4 x1 B IPU x4...
Страница 198: ...Others B286 B289 3 70 SM 4 Remove the cooling fan D x 1 x 3...
Страница 216: ......
Страница 217: ...TROUBLESHOOTING...
Страница 218: ......
Страница 269: ...SERVICE TABLES...
Страница 270: ......
Страница 507: ...DETAILS...
Страница 508: ......
Страница 511: ...Overview SM 6 3 B286 B289 Details 6 1 2 MECHANICAL COMPONENT LAYOUT...
Страница 513: ...Overview SM 6 5 B286 B289 Details 6 1 3 DRIVE LAYOUT 1 Scanner Motor 2 Drum Motor 3 Main Motor 4 Fusing Motor...
Страница 526: ...Image Processing B286 B289 6 18 SM Text Mode...
Страница 529: ...Image Processing SM 6 21 B286 B289 Details Patched Original Mode...
Страница 530: ...Image Processing B286 B289 6 22 SM Generation Mode...
Страница 552: ...Development B286 B289 6 44 SM Toner End Recovery Flow Chart...
Страница 553: ...Paper Feed and Registration SM 6 45 B286 B289 Details 6 7 PAPER FEED AND REGISTRATION 6 7 1 OVERVIEW Layout Diagrams...
Страница 585: ...Fusing Unit SM 6 77 B286 B289 Details In the table below PR is the Pressure Roller and HR is the Hot Roller...
Страница 613: ...SPECIFICATIONS...
Страница 614: ......