SP2-xxx Drum
B286/B289 5-66
SM
2925 Transfer Current Timing
DFU
These SP’s adjust the transfer current timing.
1 ON
Adjusts the timing for power on.
[0 to 16/6/0.2 mm]
2 Leading Edge
Adjusts the timing for switching from the leading edge to
the center.
[0 to 30/8/1 mm]
3 Trailing Edge
Adjusts the timing for switching from the center to the
trailing edge.
[-30 to 0/0/1 mm]
2926
Used Toner Overflow Detect
The used toner bottle motor operates a cam. This cam strikes the side of the
used toner collection bottle, to create a vibration that levels the used toner inside
the bottle.
1 Used Tnr M (Sensor Detection)
Sets the length of time that the used toner bottle motor operates. The motor
starts 10 sec. after the main power switch is switched on and if the fusing
temperature is less than 50°C (122
o
F).
[0 to 30/20/5]
Note
: Ten seconds after the machine is switched on, if the machine detects that
the toner collection bottle is full, the used toner bottle motor does not operate.
2 Used Tnr M (TE Recovery)
Sets the length of time that the used toner bottle motor operates after TE (toner
end).
[0 to 80/30/5 sec.]
Содержание B286
Страница 1: ...B286 B289 SERVICE MANUAL 003165MIU...
Страница 2: ......
Страница 3: ...B286 B289 SERVICE MANUAL...
Страница 4: ......
Страница 5: ...B286 B289 SERVICE MANUAL 003165MIU...
Страница 6: ......
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 27: ......
Страница 29: ......
Страница 34: ......
Страница 35: ...INSTALLATION...
Страница 36: ......
Страница 117: ...PREVENTIVE MAINTENANCE...
Страница 118: ......
Страница 127: ...REPLACEMENT AND ADJUSTMENT...
Страница 128: ......
Страница 186: ...Boards B286 B289 3 58 SM 9 Remove the shield cover A x12 10 Remove A MCU x4 x1 B IPU x4...
Страница 198: ...Others B286 B289 3 70 SM 4 Remove the cooling fan D x 1 x 3...
Страница 216: ......
Страница 217: ...TROUBLESHOOTING...
Страница 218: ......
Страница 269: ...SERVICE TABLES...
Страница 270: ......
Страница 507: ...DETAILS...
Страница 508: ......
Страница 511: ...Overview SM 6 3 B286 B289 Details 6 1 2 MECHANICAL COMPONENT LAYOUT...
Страница 513: ...Overview SM 6 5 B286 B289 Details 6 1 3 DRIVE LAYOUT 1 Scanner Motor 2 Drum Motor 3 Main Motor 4 Fusing Motor...
Страница 526: ...Image Processing B286 B289 6 18 SM Text Mode...
Страница 529: ...Image Processing SM 6 21 B286 B289 Details Patched Original Mode...
Страница 530: ...Image Processing B286 B289 6 22 SM Generation Mode...
Страница 552: ...Development B286 B289 6 44 SM Toner End Recovery Flow Chart...
Страница 553: ...Paper Feed and Registration SM 6 45 B286 B289 Details 6 7 PAPER FEED AND REGISTRATION 6 7 1 OVERVIEW Layout Diagrams...
Страница 585: ...Fusing Unit SM 6 77 B286 B289 Details In the table below PR is the Pressure Roller and HR is the Hot Roller...
Страница 613: ...SPECIFICATIONS...
Страница 614: ......