
MAINTENANCE
TURBO 120 08/12
Maintenance Section 5-20
© 2012 Alamo Group Inc.
MAINTENANCE
BLADE TIMING AND ROTATION
Blades on multi-spindle mowers overlap cutting paths to ensure a complete cut across the width of the mower
and to compensate for blade tip wear. If a gearbox has been repaired, a blade carrier or side driveline has been
removed, or other maintenance performed which altered the factory set blade carrier timing, the blades must
be re-timed to ensure they will not collide while rotating.
(Mnt-R-0102)
BLADE TIMING PROCEDURE
1.
Raise the mower to minimum height to allow sufficient clearance between the mower deck and ground to
visually inspect blade carriers.
2.
Completely shut down the tractor and secure the tractor in position by placing the tractor in park and
setting the parking brake. Securely block the mower at this height.
3.
On a side gearbox, remove connecting coupler.
4.
Manually rotate carriers until blades are positioned at near 90 degree angle from one another. See Fig.
Mnt-R-0102
5.
Replace connecting coupler.
6.
Manually spin carriers a complete rotation to ensure blades do not collide with one another.
Содержание Turbo 120
Страница 2: ......
Страница 10: ......
Страница 11: ...Safety Section 1 1 2012 Alamo Group Inc SAFETY SECTION...
Страница 30: ...SAFETY TURBO 120 08 12 Safety Section 1 20 2012 Alamo Group Inc SAFETY Decal Description...
Страница 31: ...SAFETY TURBO 120 08 12 Safety Section 1 21 2012 Alamo Group Inc SAFETY...
Страница 32: ...SAFETY TURBO 120 08 12 Safety Section 1 22 2012 Alamo Group Inc SAFETY...
Страница 33: ...SAFETY TURBO 120 08 12 Safety Section 1 23 2012 Alamo Group Inc SAFETY...
Страница 34: ...SAFETY TURBO 120 08 12 Safety Section 1 24 2012 Alamo Group Inc SAFETY...
Страница 35: ...SAFETY TURBO 120 08 12 Safety Section 1 25 2012 Alamo Group Inc SAFETY...
Страница 36: ...SAFETY TURBO 120 08 12 Safety Section 1 26 2012 Alamo Group Inc SAFETY...
Страница 37: ...SAFETY TURBO 120 08 12 Safety Section 1 27 2012 Alamo Group Inc SAFETY...
Страница 38: ...SAFETY TURBO 120 08 12 Safety Section 1 28 2012 Alamo Group Inc SAFETY...
Страница 40: ......
Страница 41: ......
Страница 67: ......
Страница 93: ...Introduction Section 2 1 2012 Alamo Group Inc INTRODUCTION SECTION...
Страница 98: ......
Страница 99: ...Assembly Section 3 1 2012 Alamo Group Inc ASSEMBLY SECTION...
Страница 111: ...Operation Section 4 1 2012 Alamo Group Inc OPERATION SECTION...
Страница 160: ......
Страница 161: ...Maintenance Section 5 1 2012 Alamo Group Inc MAINTENANCE SECTION...
Страница 164: ...MAINTENANCE TURBO 120 08 12 Maintenance Section 5 4 2012 Alamo Group Inc MAINTENANCE...
Страница 165: ...MAINTENANCE TURBO 120 08 12 Maintenance Section 5 5 2012 Alamo Group Inc MAINTENANCE...
Страница 166: ...MAINTENANCE TURBO 120 08 12 Maintenance Section 5 6 2012 Alamo Group Inc MAINTENANCE...
Страница 167: ...MAINTENANCE TURBO 120 08 12 Maintenance Section 5 7 2012 Alamo Group Inc MAINTENANCE...
Страница 183: ...MAINTENANCE TURBO 120 08 12 Maintenance Section 5 23 2012 Alamo Group Inc MAINTENANCE...
Страница 193: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 24 2012 Alamo Group Inc SEGURIDAD...
Страница 194: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 23 2012 Alamo Group Inc SEGURIDAD...
Страница 195: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 22 2012 Alamo Group Inc SEGURIDAD...
Страница 196: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 21 2012 Alamo Group Inc SEGURIDAD...
Страница 197: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 20 2012 Alamo Group Inc SEGURIDAD...
Страница 198: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 19 2012 Alamo Group Inc SEGURIDAD...
Страница 199: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 18 2012 Alamo Group Inc SEGURIDAD...
Страница 200: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 17 2012 Alamo Group Inc SEGURIDAD...
Страница 201: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 16 2012 Alamo Group Inc SEGURIDAD...
Страница 202: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 15 2012 Alamo Group Inc SEGURIDAD Descripci n de Calcoman a...
Страница 216: ...Secci n de Seguridad 1 1 2012 Alamo Group Inc SECCI N DE SEGURIDAD...
Страница 217: ......