
OPERATION
TURBO 120 08/12
Operation Section 4-18
© 2012 Alamo Group Inc,
OPERA
T
ION
Shorten the driveline profiles as follows:
•
Remove the driveline from the tractor.
•
Position the mower (Lift and Semi-Mount Type -
Raise and lower/ Pull Type - Turn sharply) to
the point with the shortest distance between
the tractor PTO shaft and cutter gearbox. Shut
down the tractor and securely block the mower
in this position.
•
Pull driveline apart and reattach yoke to PTO
shaft.
•
Hold driveline sections parallel to one another
and measure back 1” from yoke of each shaft
and place mark on opposite section. Cut this
length off with a saw.
•
Round off all sharp edges and debur.
•
Thoroughly grease then reinstall the driveline.
•
Recheck for proper operation.
Engagement Check Procedure
•
With the driveline attached, position the mower to the point where the telescoping driveline is at its
maximum extension. Completely shut down the tractor and secure in position.
•
Mark the inner driveline shield 1/8” from the end of the outer shield.
•
Disconnect the driveline from the tractor and separate the two driveline halves.
•
Measure the distance from the mark to the end of the inner profile. This length is the amount the driveline
profiles were engaged.
•
If the engaged length is less than 12” for a CV driveline and less than 6” for a non-CV driveline, the shaft is
considered too short and should be replaced with a longer shaft. Consult an authorized dealer to
purchase the required driveline length.
NOTE: When raising the mower, at least 1” clearance must be maintained between the driveline and the
mower deck. If necessary, place an upper lift stop on the 3-point hitch control lever to limit the height the
mower can be raised.
OPS-R-0005-G
Содержание Turbo 120
Страница 2: ......
Страница 10: ......
Страница 11: ...Safety Section 1 1 2012 Alamo Group Inc SAFETY SECTION...
Страница 30: ...SAFETY TURBO 120 08 12 Safety Section 1 20 2012 Alamo Group Inc SAFETY Decal Description...
Страница 31: ...SAFETY TURBO 120 08 12 Safety Section 1 21 2012 Alamo Group Inc SAFETY...
Страница 32: ...SAFETY TURBO 120 08 12 Safety Section 1 22 2012 Alamo Group Inc SAFETY...
Страница 33: ...SAFETY TURBO 120 08 12 Safety Section 1 23 2012 Alamo Group Inc SAFETY...
Страница 34: ...SAFETY TURBO 120 08 12 Safety Section 1 24 2012 Alamo Group Inc SAFETY...
Страница 35: ...SAFETY TURBO 120 08 12 Safety Section 1 25 2012 Alamo Group Inc SAFETY...
Страница 36: ...SAFETY TURBO 120 08 12 Safety Section 1 26 2012 Alamo Group Inc SAFETY...
Страница 37: ...SAFETY TURBO 120 08 12 Safety Section 1 27 2012 Alamo Group Inc SAFETY...
Страница 38: ...SAFETY TURBO 120 08 12 Safety Section 1 28 2012 Alamo Group Inc SAFETY...
Страница 40: ......
Страница 41: ......
Страница 67: ......
Страница 93: ...Introduction Section 2 1 2012 Alamo Group Inc INTRODUCTION SECTION...
Страница 98: ......
Страница 99: ...Assembly Section 3 1 2012 Alamo Group Inc ASSEMBLY SECTION...
Страница 111: ...Operation Section 4 1 2012 Alamo Group Inc OPERATION SECTION...
Страница 160: ......
Страница 161: ...Maintenance Section 5 1 2012 Alamo Group Inc MAINTENANCE SECTION...
Страница 164: ...MAINTENANCE TURBO 120 08 12 Maintenance Section 5 4 2012 Alamo Group Inc MAINTENANCE...
Страница 165: ...MAINTENANCE TURBO 120 08 12 Maintenance Section 5 5 2012 Alamo Group Inc MAINTENANCE...
Страница 166: ...MAINTENANCE TURBO 120 08 12 Maintenance Section 5 6 2012 Alamo Group Inc MAINTENANCE...
Страница 167: ...MAINTENANCE TURBO 120 08 12 Maintenance Section 5 7 2012 Alamo Group Inc MAINTENANCE...
Страница 183: ...MAINTENANCE TURBO 120 08 12 Maintenance Section 5 23 2012 Alamo Group Inc MAINTENANCE...
Страница 193: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 24 2012 Alamo Group Inc SEGURIDAD...
Страница 194: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 23 2012 Alamo Group Inc SEGURIDAD...
Страница 195: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 22 2012 Alamo Group Inc SEGURIDAD...
Страница 196: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 21 2012 Alamo Group Inc SEGURIDAD...
Страница 197: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 20 2012 Alamo Group Inc SEGURIDAD...
Страница 198: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 19 2012 Alamo Group Inc SEGURIDAD...
Страница 199: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 18 2012 Alamo Group Inc SEGURIDAD...
Страница 200: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 17 2012 Alamo Group Inc SEGURIDAD...
Страница 201: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 16 2012 Alamo Group Inc SEGURIDAD...
Страница 202: ...SEGURIDAD TURBO 120 08 12 Secci n de Seguridad 1 15 2012 Alamo Group Inc SEGURIDAD Descripci n de Calcoman a...
Страница 216: ...Secci n de Seguridad 1 1 2012 Alamo Group Inc SECCI N DE SEGURIDAD...
Страница 217: ......