
OPERATION
RHD 02/11
Operation Section 4-23
© 2011 Alamo Group Inc.
OPERA
T
ION
10.3 Raising the Mower
Using the tractor 3-point hitch control lever, raise
the mower off the ground about 6”, or just high
enough to clear any ground obstacles. When
raising the mower, make sure all connection points
are securely attached and at least 1” clearance is
maintained between the driveline and the deck. If
necessary, place an upper lift stop on the 3-point
hitch control lever to limit the height the mower can
be raised to avoid driveline damage.
Содержание RHD62
Страница 7: ...Safety Section 1 1 2011 Alamo Group Inc SAFETY SECTION...
Страница 31: ...SAFETY RHD 02 11 Safety Section 1 25 2011 Alamo Group Inc SAFETY Logo Product Name Rhino P N D302...
Страница 33: ......
Страница 59: ......
Страница 85: ...Introduction Section 2 1 2011 Alamo Group Inc INTRODUCTION SECTION...
Страница 89: ...Assembly Section 3 1 2011 Alamo Group Inc ASSEMBLY SECTION...
Страница 91: ...Operation Section 4 1 2011 Alamo Group Inc OPERATION SECTION...
Страница 130: ......
Страница 131: ...Maintenance Section 5 1 2011 Alamo Group Inc MAINTENANCE SECTION...
Страница 152: ...RHD SOM 02 11 P N 803215C Printed U S A RHD62 RHD74 RHD88 RHD96 SUPER HEAVY DUTY FLAIL MOWER...