Manual CE (SAGOMA_GB)
Sezione 11 Part 11. Start-up operations
11.1 Installation - Phase 1
The phase 1 of the installation of the vending machine contains the water loading of the boiler
(
Version H
) or of the water refilling tank (
Version E
) and the setting of the temperature of the
boiler.
11.1.1 Loading the boiler of instant beverages
This operation is carried out on all models of the machine.
Place the liquid waste disposal bucket on the bottom of the machine,
sliding it in the appropriate guide tracks, and insert the drain pipes,
the pressure relief tube and the coffee brewer pipe (
Version E
).
Open the tap of the water circuit.
Insert the key in the safety switch. After the switching on messages,
the display shows:
WATER REFILLING
The machine starts automatically loading the boiler for instant
beverages with water (
Version H
); for espresso vending machines
loads first the water refilling tank and then the boiler (
Version E
). The
boiler is filled up in about 3 min.
The following message appears on the display:
rheavendors
SAGOMA
TAKE A RELAX
MOMENT
If the load is sufficient, by pressing the
key PL
inside the machine on the CPU protection, it is
necessary to make some washings of the mixing bowls and of the coffee brewer (
Version E
). The
display shows:
19/19