INLET CHECK VALVE
1.
Using clean, dry shop air, inflate the compartment to 2.0 psig.
2.
Spray a solution of soapy water on top of the valve. Apply solution slowly to generate the least
amount of bubbles possible.
3.
Monitor and check for generation of new bubbles. The inlet check valves should be airtight and
not allow new bubbles to form.
4.
The inlet check valve will “pass inspection” if no bubbles form.
GAS CYLINDER AND INFLATION VALVE
Warning:
A fully charged cylinder can become a lethal projectile if discharged to
atmosphere when not fitted with a diffuser cap. Always fit the diffuser caps to
the cylinder valve outlets when handling a fully charged cylinder.
Weight
Coastal Compact 4: Remove the diffuser caps from the cylinder to obtain an accurate current weight.
Check current weight of the cylinder against the total weight marked on the
cylinder label. Renew or recharge the cylinder if the current weight is less than
98% of the marked total weight.
Coastal Compact 2: Remove the diffuser caps from the cylinder to obtain an accurate current weight.
Weight the cylinder with the inflation valve attached. Do not remove inflation
valve. The actual gross weight of the cylinder plus valve assembly must be at
least 100 grams greater than the Minimum Gross Weight marked on the cylinder.
If not, replace the cylinder. The Coastal Compact 2 cylinders cannot be
refilled. They are disposable after being discharged.
After weighing, fit diffuser caps back onto the cylinder.
Note:
Diffuser caps must ALWAYS be fitted to a cylinder when it is not fitted with an
inflation hose.
Recharging
The CO
2
gas used for recharging must have a maximum moisture content of .015 %.
See Chapter 8 – Assembly for recharging details.
May 29/13
4 - 16
9102
Содержание 45-CC2V
Страница 2: ......
Страница 4: ...June 2 08 RR 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 10: ...June 2 08 SB 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 28: ......
Страница 33: ...LIST OF ASSOCIATED PUBLICATIONS June 2 08 9102 AP 1 AP None Listed...
Страница 34: ...June 2 08 AP 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 36: ...June 2 08 AB 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 38: ...June 2 08 TC 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 1 2 9102...
Страница 44: ...June 2 08 2 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 50: ...FIGURE 2 VALISE June 2 08 2 8 9102...
Страница 51: ...FIGURE 3 GAS INFLATION SYSTEM May 29 13 9102 2 9...
Страница 54: ...FIGURE 4 RAFT DIMENSIONS Jan 18 11 2 12 9102...
Страница 56: ...FIGURE 5 DEPLOYMENT Jan 18 11 2 14 9102...
Страница 57: ...FIGURE 6 CANOPY ATTACHMENT Jan 18 11 9102 2 15...
Страница 58: ...Jan 18 11 2 16 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 59: ...DISASSEMBLY 3 General 3 Procedures 5 June 2 08 9102 3 1...
Страница 60: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 3 2 9102...
Страница 62: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 3 4 9102...
Страница 65: ...FIGURE 3 DISCONNECTING THE CYLINDER NECK LOOP Jan 18 11 9102 3 7...
Страница 66: ...FIGURE 4 UNFOLD RAFT DISENGAGE THE CYLINDER Jan 18 11 3 8 9102...
Страница 68: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 2 9102...
Страница 70: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 4 9102...
Страница 72: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 6 9102...
Страница 74: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 8 9102...
Страница 79: ...FIGURE 1 DIGITAL MANOMETER P N 95 41129 101 May 29 13 9102 4 13...
Страница 85: ...CLEANING June 2 08 9102 5 1 5 General 3 Procedures 5 A Liferafts 5 B Valise 5...
Страница 86: ...June 2 08 5 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 88: ...June 2 08 5 4 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 90: ...June 2 08 5 6 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 91: ...SERVICE INSPECTION AND CHECK 6 General 3 Gas Inflation System 5 Valise Pack 7 June 2 08 9102 6 1...
Страница 92: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 2 9102...
Страница 94: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 4 9102...
Страница 96: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 6 9102...
Страница 98: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 8 9102...
Страница 100: ...THIS PAGE IS INTENTIONALLY LEFT BLANK June 2 08 7 2 9102...
Страница 102: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 7 4 9102...
Страница 109: ...FIGURE 1 PATCHES AND TAPE APPLICATION June 2 08 9102 7 11...
Страница 110: ...FIGURE 2 PATCH APPLICATION OVER SEAM May 29 13 7 12 9102...
Страница 112: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 7 14 9102...
Страница 114: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 8 2 9102...
Страница 116: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 8 4 9102...
Страница 119: ...FIGURE 2C FOLDING SEA ANCHOR FIGURE 2D PAINTERLINE PREPARATION Jan 18 11 9102 8 7...
Страница 137: ...FIGURE 3 TOPPING OFF INFLATE DEFLATE VALVE FIGURE 4 ATTACHING THE CYLINDER June 2 08 9102 8 25...
Страница 138: ...FIGURE 5 STORAGE OF COMPONENTS Jan 18 11 8 26 9102...
Страница 140: ...FIGURE 6B CC2 FOLDING DIAGRAM STEP 2 June 2 08 8 28 9102...
Страница 141: ...FIGURE 6C CC2 FOLDING DIAGRAM STEP 3 June 2 08 9102 8 29...
Страница 142: ...FIGURE 6D CC2 FOLDING DIAGRAM STEP 4 D 53 25in June 2 08 8 30 9102...
Страница 143: ...FIGURE 6E CC2 FOLDING DIAGRAM STEP 5 June 2 08 9102 8 31...
Страница 144: ...FIGURE 6G CC2 FOLDING DIAGRAM CC4 STEP 7 June 2 08 8 32 9102...
Страница 145: ...FIGURE 7A CC4 FOLDING DIAGRAM STEP 1 Jan 18 11 9102 8 33...
Страница 146: ...FIGURE 7B CC4 FOLDING DIAGRAM STEP 2 Jan 18 11 8 34 9102...
Страница 147: ...FIGURE 7C CC4 FOLDING DIAGRAM STEP 3 Jan 18 11 9102 8 35...
Страница 148: ...FIGURE 7D CC4 FOLDING DIAGRAM STEP 4 Jan 18 11 8 36 9102...
Страница 149: ...FIGURE 7E CC4 FOLDING DIAGRAM STEP 5 Jan 18 11 9102 8 37...
Страница 150: ...FIGURE 7F CC4 FOLDING DIAGRAM STEP 6 D 71in Jan 18 11 8 38 9102...
Страница 151: ...FIGURE 7G CC4 FOLDING DIAGRAM STEP 7 Jan 18 11 9102 8 39...
Страница 152: ...FIGURE 7I CC4 FOLDING DIAGRAM STEP 9 Jan 18 11 8 40 9102...
Страница 153: ...FIGURE 8A CC6 FOLDING DIAGRAM STEP 1 Jan 18 11 9102 8 41...
Страница 154: ...FIGURE 8B CC6 FOLDING DIAGRAM STEP 2 Jan 18 11 8 42 9102...
Страница 155: ...FIGURE 8C CC6 FOLDING DIAGRAM STEP 3 Jan 18 11 9102 8 43...
Страница 156: ...FIGURE 8D CC6 FOLDING DIAGRAM STEP 4 Jan 18 11 8 44 9102...
Страница 157: ...FIGURE 8E CC6 FOLDING DIAGRAM STEP 5 Jan 18 11 9102 8 45...
Страница 158: ...FIGURE 8F CC6 FOLDING DIAGRAM STEP 6 Jan 18 11 8 46 9102...
Страница 159: ...FIGURE 8G CC6 FOLDING DIAGRAM STEP 7 Jan 18 11 9102 8 47...
Страница 160: ...FIGURE 8I CC6 FOLDING DIAGRAM STEP 9 Jan 18 11 8 48 9102...
Страница 161: ...FIGURE 9 PLACEMENT OF RAFT IN VALISE Jan 18 11 9102 8 49...
Страница 162: ...FIGURE 10 PAINTERLINE LOOPS FIGURE 11 ATTACHMENT OF CYLINDER NECK LOOP Jan 18 11 8 50 9102...
Страница 163: ...FIGURE 12 ATTACHMENT OF CABLE LOOP Jan 18 11 9102 8 51...
Страница 164: ...FIGURE 13 ATTACHMENT OF PAINTERLINE SACHET DETAIL A ATTACHMENT OF PAINTERLINE LOOP Jan 18 11 8 52 9102...
Страница 165: ...STORAGE 9 General 3 June 2 08 9102 9 1...
Страница 166: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 9 2 9102...
Страница 168: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 9 4 9102...
Страница 169: ...TOOL EQUIPMENT AND MATERIALS May 29 13 9102 10 1 10 General 3 Tool List 5...
Страница 170: ...June 2 08 10 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 172: ...June 2 08 10 4 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 176: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 2 9102...
Страница 180: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 6 9102...
Страница 182: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 8 9102...
Страница 186: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 11 12 9102...
Страница 188: ...FIGURE 1 LIFE RAFT ASSEMBLY Jan 18 11 11 14 9102...
Страница 191: ...THIS PAGE INTENTIONALLY LEFT BLANK Jan 18 11 9102 11 17...
Страница 192: ...FIGURE 2 HULL ASSEMBLY Jan 18 11 11 18 9102...
Страница 194: ...FIGURE 3 CYLINDER VALVE ASSEMBLY Jan 18 11 11 20 9102...
Страница 196: ...FIGURE 4 INFLATION VALVE ASSEMBLY M41115 Jan 18 11 11 22 9102...
Страница 205: ...SPARE PARTS LIST 12 Introduction 3 Image List 5 Tool Image List 21 May 29 13 9102 12 1...
Страница 206: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 2 9102...
Страница 208: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 4 9102...
Страница 218: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 14 9102...
Страница 222: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 18 9102...
Страница 224: ...THIS PAGE INTENTIONALLY LEFT BLANK Jan 18 11 9102 A 2...
Страница 226: ......