background image

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

THIS PAGE INTENTIONALLY LEFT BLANK 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

June 2/08 
1 - 2 

9102

 

Содержание 45-CC2V

Страница 1: ...SERVICE MANUAL TITLE PAGE Page 1 Third Edition Document No 9102 5323 Highway Avenue Jacksonville FL 32254 USA International 001 904 503 9733 Fax 904 503 9719 www reveresurvival com...

Страница 2: ......

Страница 3: ...No and Revision Date Remove the old sheet and replace it with the revised copy Record the Insert Date and then initial in the Inserted By column Revisions made ONLY by Revere Supply Inc REV No REV DAT...

Страница 4: ...June 2 08 RR 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 5: ...4 4 3 4 9 4 10 4 13 4 15 4 16 4 17 CHAPTER 6 6 5 CHAPTER 7 7 3 7 5 7 6 7 8 7 9 7 10 7 12 7 13 CHAPTER 8 8 3 RP RP RP RP RP RP RP RP RP RP RP RP RP RP RP RP RP RP Updated page dates Added Section 12 A...

Страница 6: ...X A A 1 RP RP RP RP RP RP RP RP RP RM RP RP RP RP RP RP RP A A RP Changed image Revised wording Replaced lubricant type Revised wording Changed part numbers Changed part numbers Removed image list Rev...

Страница 7: ...TC 1 CHAPTER 2 2 4 2 5 2 6 2 7 2 10 2 11 2 12 2 13 2 14 2 15 2 16 CHAPTER 3 3 6 3 7 3 8 CHAPTER 4 4 1 4 14 4 15 4 17 RP RP RP RP RP RP RP RP RP RP A A RP RP RP RP RP RP Added Revision A Updated page...

Страница 8: ...setup Clarified length of cord used for light attachment Added canopy folding instructions Adjusted figure positions Added torque setting to Table A Added CC6 to Table B Updated procedure with canopy...

Страница 9: ...All service bulletins which are incorporated into this manual are required to be recorded in this list All updates to this list will be made by the owner of the manual SERVICE BULLETIN No DATE TITLE D...

Страница 10: ...June 2 08 SB 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 11: ...k valve replacement new firing heads and cylinders are required for all rafts starting in July 2014 For the Coastal Compact 2 person two additional cylinders updates occurred One in 2015 and the most...

Страница 12: ...A 52030 Mirada B 51994 4 FIRING HEAD 95 41115 103 M70 OPERATING INSTRUCTIONS See Chapter 8 Assembly and Packing Inflation Valve Disassembly Rebuilding Process for instructions on servicing the 41115...

Страница 13: ...f the siphon tube is loose and falls off the complete assembly must be replaced Older versions of the syphon tube can be re attached Lifetime 10 years after installation Can be extended if the valves...

Страница 14: ...daptor counter clockwise and inspect the valve and siphon tube It is essential the tool 99 120 is placed correctly in the adaptor so as not to cause any damage Incorrect Correct The removed diaphragm...

Страница 15: ...n cap for DK94 99 system 90 039 6 CHARGING THE CYLINDER WITH DK 992 Thanner cylinder valves adapters for CO2 to a maximum working pressure of 250 Bar Thanner cylinder valves adapters for N 2 or Air to...

Страница 16: ...fore charging the cylinder An elastic reaction will be felt when the diaphragm assembly is correctly open this elastic reaction is caused by compression of the 0 ring within the filling head IMPORTANT...

Страница 17: ...leaking re tighten the diaphragm holder until it is tight Torque 40 50 Nm 29 36 foot pound Retest the diaphragm holder with alcohol NOTE DO NOT USE WATER or WATER BASED DETECTIVE If still leaking disc...

Страница 18: ...ort protection cap for DK94 99 system 90 039 7 Technical alcohol in 2 5 or 10 liter canister Commercial CHARGING PROCEDURE To ensure correct and equal charging and to protect the diaphragm against ove...

Страница 19: ...uring a small amount of alcohol over the diaphragm holder while the cylinder is vertical No bubbles must be seen 7 The protection cap must now be fitted HOW TO USE THE SETUP When the diaphragm holder...

Страница 20: ...rts slowly to avoid pressure choke IMPORTANT During the charging procedure the temperature in the cylinder valve filling head must not exceed 65 C Overheating will damage the disc and increase the dom...

Страница 21: ...ns The DK 99S s are marked with serial number and production date The DK 99S s are activated by pulling out the release top The red safety cap brakes during activation to indicate the head has been ac...

Страница 22: ...Take out the spring and knife and inspect the parts for grease If needed grease the knife shaft and o ring 3 with silicone Grease Apply Aero Shell 14 Grease to the top of the Knife The DK 99S is reass...

Страница 23: ...service or activating of the DK 99S it is re set by use of the resetting tool 90 038 The resetting tool is screwed into the DK 99S The handles are pressed together and the sliced end of the knife app...

Страница 24: ...RTANT The first issues of DK 99S have 3 8 BSP either screwed or pressed into the body The DK99B 1 is forged body which means the outlets are a solid part of the body If the old issues with screwed or...

Страница 25: ...with closing cap 4 O ring The valve parts are produced from Acetal Copolymer 1 2 3 The seal o ring 4 is made of silicone rubber INSTALLATION When the nut 2 is in position inside the tube the washer 3...

Страница 26: ...htened after installation If a leakage appears between the fabric and the relief valve the valve must be taken apart and reinstalled until tight IMPORTANT If using the closing cap be careful the cap i...

Страница 27: ...consists of this transmittal sheet plus 16 pages Title Revere Coastal Compact Liferafts Gas Inflation System Service Bulletin Number 09 16 has technical approval by Revere Survival Inc Signed _______...

Страница 28: ......

Страница 29: ...8 June 2 08 June 2 08 May 29 13 June 2 08 June 2 08 June 2 08 May 29 13 June 2 08 June 2 08 June 2 08 June 2 08 Jan 18 11 Jan 18 11 Jan 18 11 Jan 18 11 Disassembly Section 3 Testing Section 4 2 8 2 9...

Страница 30: ...May 29 13 May 29 13 June 2 08 May 29 13 May 29 13 May 29 13 June 2 08 May 29 13 May 29 13 June 2 08 Jan 18 11 June 2 08 8 3 8 4 8 5 8 6 8 7 8 8 8 9 8 10 8 11 8 12 8 13 8 14 8 15 8 16 8 17 8 18 8 19 8...

Страница 31: ...ay 29 13 June 2 08 May 29 13 June 2 08 June 2 08 June 2 08 May 29 13 June 2 08 May 29 13 May 29 13 Spare Parts Section 12 11 11 11 12 11 13 11 14 11 15 11 16 11 17 11 18 11 19 11 20 11 21 11 22 11 23...

Страница 32: ...PAGE No ISSUE DATE PAGE TITLE PAGE No ISSUE DATE Appendix A 12 16 12 17 12 18 A 1 A 2 May 29 13 May 29 13 May 29 13 May 29 13 Jan 18 11 May 29 13 EP 4 9102...

Страница 33: ...LIST OF ASSOCIATED PUBLICATIONS June 2 08 9102 AP 1 AP None Listed...

Страница 34: ...June 2 08 AP 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 35: ...cury Inside Diameter Kilogram Kilogram per Square Centimeter Ounce s Outside Diameter Package Pound s Pound Force Inch Pound Force Foot Meter s Millibar Millimeter Millimeters of Mercury Minutes Maxim...

Страница 36: ...June 2 08 AB 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 37: ...and Operation Disassembly Testing and Fault Isolation Cleaning Service Inspection and Check Repair Assembly and Packing Storage Tools Equipment and Materials Illustrated Parts List Spare Parts Appendi...

Страница 38: ...June 2 08 TC 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 39: ...TION 1 General 3 Manual Breakdown 3 A Shop Verification 3 B Warnings Cautions and Notes 3 C Layout of Manual 3 D List of Effective Pages 4 E Record of Revision 4 F Associated Publications 4 June 2 08...

Страница 40: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 1 2 9102...

Страница 41: ...f its product when procedures defined in this manual are not adhered to or unapproved personnel perform these procedures All warnings cautions notes in each section are to be abided by A WARNING calls...

Страница 42: ...re issued when necessary The transmittal letter lists in general terms the contents of the revision in the manual All pages that are required to be removed without replacements are listed All other ou...

Страница 43: ...DESCRIPTION DATA AND OPERATION June 2 08 9102 2 1 2 General 3 Description 5 A Overview 5 B Detail 6 1 Standard Equipment 6 2 Inflation System 7 Data 10 Operation 13...

Страница 44: ...June 2 08 2 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 45: ...astal Compact liferafts self inflation system is initiated manually and is stored in a valise for rapid easy access by passengers and crew in the event of an emergency Note Revere Coastal Compact life...

Страница 46: ...FIGURE 1 COASTAL COMPACT 4 PERSON 4 person capacity shown Description comparable to 2 and 6 person capacity Jan 18 11 2 4 9102...

Страница 47: ...orange fabric These ballast pockets help stabilize the raft in rough weather Coastal Compact Life Rafts come fully equipped with life lines a sea anchor a pocket knife a bailer a locator light and a h...

Страница 48: ...rning over righting a capsized raft 4 Life Lines Available on the exterior of the raft these lines provide survivors with a place to grasp from the water or while seated in the raft The life lines are...

Страница 49: ...ng off valve IPL Fig 1 Item 30 which can be used to provide additional inflation with the hand pump IPL Fig 1 Item 160 provided or as inflation points for testing and service The gas inflation system...

Страница 50: ...FIGURE 2 VALISE June 2 08 2 8 9102...

Страница 51: ...FIGURE 3 GAS INFLATION SYSTEM May 29 13 9102 2 9...

Страница 52: ...requency of Service Inspection Coastal 2 2 years after purchase Annually after initial inspection Coastal 4 2 years after purchase Annually after initial inspection Coastal 6 2 years after purchase An...

Страница 53: ...25 40 x 12 70 53 29 x 53 29 x 8 5 136 12 x 136 12 x 21 59 14 5 6 58 Coastal Compact 4 CC4V 16 5 x 13 x 5 41 91 x 33 02 x 12 70 71 03 x 71 03 x 10 5 180 42 x 180 42 x 26 67 16 7 26 Coastal Compact 6 C...

Страница 54: ...FIGURE 4 RAFT DIMENSIONS Jan 18 11 2 12 9102...

Страница 55: ...urs the force exerted by the inflating liferaft breaks open the valise When inflation is complete the liferaft is ready for boarding Full inflation is achieved in 30 to 60 seconds In the rare event th...

Страница 56: ...FIGURE 5 DEPLOYMENT Jan 18 11 2 14 9102...

Страница 57: ...FIGURE 6 CANOPY ATTACHMENT Jan 18 11 9102 2 15...

Страница 58: ...Jan 18 11 2 16 9102 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 59: ...DISASSEMBLY 3 General 3 Procedures 5 June 2 08 9102 3 1...

Страница 60: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 3 2 9102...

Страница 61: ...aft The work surface should be smooth preferably constructed of linoleum or PVC covering Caution Extreme care must be exercised when handling a liferaft to protect it from punctures or tears Do not st...

Страница 62: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 3 4 9102...

Страница 63: ...ial attention to the gas relief pull cables 3 Loosen the painterline from around the neck of the cylinder and pass the painterline sachet back through the cylinder neck loop to disconnect See Fig 3 4...

Страница 64: ...FIGURE 1 DISCONNECTING PAINTERLINE LOOP Shown below with Coastal Compact 4 FIGURE 2 DISCONNECTING THE CABLE LOOP Jan 18 11 3 6 9102...

Страница 65: ...FIGURE 3 DISCONNECTING THE CYLINDER NECK LOOP Jan 18 11 9102 3 7...

Страница 66: ...FIGURE 4 UNFOLD RAFT DISENGAGE THE CYLINDER Jan 18 11 3 8 9102...

Страница 67: ...9 A General 9 B Inflatable Chambers 9 a Arch Tube 14 Function Tests 15 A General 15 B Light 15 C Topping Off Valves 15 D Pressure Relief Valves 15 E Inlet Check Valves 16 F Gas Cylinder and Inflation...

Страница 68: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 2 9102...

Страница 69: ...d condition and safe from damage It will be necessary to remove the packed liferaft from the vessel in order to perform testing procedures Refer to Chapter 3 Disassembly of this manual for information...

Страница 70: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 4 9102...

Страница 71: ...________ Time __________ Tf __________ Pfamb __________ Calculate Pcorrected Corrected Tube Pressure Pressure Main compartment Ptube Pitube Pftube Pass Fail Calculate the corrected tube pressure value...

Страница 72: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 6 9102...

Страница 73: ...previous section Make blank copies and store at the end of the Section 2 Protect liferafts from draughts and direct sunlight as temperature affects pressure 3 Keep at hand a solution of mild liquid so...

Страница 74: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 8 9102...

Страница 75: ...cord the initial tube pressure Pitube temperature Ti time and barometric pressure Piamb Leave sitting for at least four 4 hours but no more than 24 hours 6 Check the buoyancy chamber after this test i...

Страница 76: ...ip is located please refer to Chapter 7 Repair 11 Once the repairs are completed retest failed chamber 12 If the chamber passes its air retention test or if repairs have been made please refer to Chap...

Страница 77: ...ESSURE Change in Barometric Pressure Pamb inHg Raft Tube Pressure Correction psi 30 25 20 15 10 05 04 03 02 01 0 01 02 03 04 05 10 15 20 25 30 1470 1225 0980 0735 0490 0245 0196 0147 0098 0049 0 0049...

Страница 78: ...nge in Temperature F Raft Tube Pressure Correction psi 31 28 25 22 19 16 12 09 06 03 0 03 06 09 12 16 19 22 25 28 31 10 9 8 7 6 5 4 3 2 1 0 1 2 3 4 5 6 7 8 9 10 TABLE B BAROMETER AND TEMPERATURE CORRE...

Страница 79: ...FIGURE 1 DIGITAL MANOMETER P N 95 41129 101 May 29 13 9102 4 13...

Страница 80: ...or tapping on the valve with a finger will usually clear the dust and stop the leak Keep the dust cap in place at all times Allow the arch tube to sit overnight for 16 hours and then check to see if t...

Страница 81: ...valve check This will allow escaping air to dislodge any foreign matter which may be causing faulty seating Remove the probe and recheck for leaks If leaks cannot be rectified replace the valve PRESS...

Страница 82: ...eight Check current weight of the cylinder against the total weight marked on the cylinder label Renew or recharge the cylinder if the current weight is less than 98 of the marked total weight Coastal...

Страница 83: ...nflation valve 3 Check the weight of the cylinder to make sure no leaks have occurred 4 Place cylinder into a vise and tighten down Warning Secure the cylinder so the inflation valve outlets are point...

Страница 84: ...ylinder B Fit or tighten hose connectors C Connect loop to painterline correctly Pressure Leaks A Torn or porous fabric B Topping Off valve not fitted or left loose C Foreign matter affecting valve se...

Страница 85: ...CLEANING June 2 08 9102 5 1 5 General 3 Procedures 5 A Liferafts 5 B Valise 5...

Страница 86: ...June 2 08 5 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 87: ...ould be performed The working area must be free from chemicals corrosives and solvents CLEANING MATERIALS Caution Use only cleaning agents used in Table A TABLE A ITEM No DESCRIPTION APPLICATION 1 Mil...

Страница 88: ...June 2 08 5 4 9102 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 89: ...using solvents Liferafts 1 Wash the liferaft with a solution of mild liquid soap Item 1 and water After washing finish with a clean cloth Item 2 2 Wipe clean the inflation equipment with a clean cloth...

Страница 90: ...June 2 08 5 6 9102 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 91: ...SERVICE INSPECTION AND CHECK 6 General 3 Gas Inflation System 5 Valise Pack 7 June 2 08 9102 6 1...

Страница 92: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 2 9102...

Страница 93: ...ght and inspect for damage Replace if necessary Check floating knife for any cracks in plastic Replace if necessary Fabric Inspect all fabric components for Slits tears and holes Pigment removal Deter...

Страница 94: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 4 9102...

Страница 95: ...IPL Fig 3 Item 30 inside the cylinder is still serviceable Shake the cylinder if the tube is still flexible it will strike the wall of the cylinder with a ringing sound If there is a noticeable delay...

Страница 96: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 6 9102...

Страница 97: ...VALISE PACKS Inspect valise for Cleanliness freedom from splits tears or other obvious signs of damage Legibility of all marks and labels June 2 08 9102 6 7...

Страница 98: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 8 9102...

Страница 99: ...paration of Coasted Surfaces 6 C Applying Adhesive 7 D Repairing Torn Areas 8 1 Patches 8 2 Applying Patches 8 3 Repair Limits for External Patches 9 E Component Repair 10 1 Pressure Relief Valve 10 2...

Страница 100: ...THIS PAGE IS INTENTIONALLY LEFT BLANK June 2 08 7 2 9102...

Страница 101: ...ny tear rip to abrasion damage exceeding 6in 15cm in length D Rafts older than 9 years from the date of manufacture that require major repairs or repairs other than the minor repairs described in the...

Страница 102: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 7 4 9102...

Страница 103: ...in a 4oz can with brush top Part No 95 306 004 B Only the specified adhesive shall be used for the repair of liferafts manufactured by Revere Supply Company Using unspecified adhesives may have unexpe...

Страница 104: ...a lint free fabric pad wet but not dripping with the solvent Adequate preparation is shown by the development of a matte appearance and a limited degree of tackiness C After being wiped with MEK the...

Страница 105: ...livened with a cloth dampened with MEK solvent Apply just enough solvent to recreate an aggressive tack on the surface Reactivation may be carried out up to three 3 hours after the application of the...

Страница 106: ...be at least 3in 75mm in diameter If a straight tear is 1in 25mm long the patch must be at least 3in 75mm x 2in 50mm L shaped tears are to be treated as holes reckoning the dimensions taken between the...

Страница 107: ...be a patch may be fitted providing that is complies with the limits specified below In this instance the floor seam must be opened the floor repaired the floor seam re made and the patch fitted of the...

Страница 108: ...rmitted Unscrew the valve and replace Topping Off Valve Unscrew the valve and replace Inlet Check Valves Unscrew the valves and replace Inflation Valve See Chapter 8 Assembly for inflation valve rebui...

Страница 109: ...FIGURE 1 PATCHES AND TAPE APPLICATION June 2 08 9102 7 11...

Страница 110: ...FIGURE 2 PATCH APPLICATION OVER SEAM May 29 13 7 12 9102...

Страница 111: ...d fill out charts when needed TABLE A REPAIR RECORD LIFERAFT TYPE No SERIAL No REPAIRS REQUIRED PART DAMAGE FORM OF REPAIR INSP BY Buoyancy Tube Floor Inflation Equipment Topping Off Valve Pressure Re...

Страница 112: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 7 14 9102...

Страница 113: ...eneral 3 Component Setup 5 A Handpump and Bailer 5 B Sea Anchor 5 C Painterline 5 D Light 5 E Knife 5 F Inflation Valve Cylinder 6 G Canopy 6 Inflation Valve Disassembly Rebuilding Process 9 Procedure...

Страница 114: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 8 2 9102...

Страница 115: ...o prevent fraying and secured with white adhesive tape When gathering cordage it is important to fake fold accordion style the line instead of looping it See Fig 1 This will allow the line to unravel...

Страница 116: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 8 4 9102...

Страница 117: ...nozzle facing upward See Fig 5 Packing and Stowage of Sea Anchor Fake Fold sea anchor line into 10in folds and secure each with a small rubber band Fold sea anchor and wrap remaining line around it t...

Страница 118: ...place to keep the valve open At the same time squeeze the arch tube to force all the air out through the oral valve until it is completely evacuated and flat A vacuum hose can also be used to eliminat...

Страница 119: ...FIGURE 2C FOLDING SEA ANCHOR FIGURE 2D PAINTERLINE PREPARATION Jan 18 11 9102 8 7...

Страница 120: ...FIGURE 2E PREPARING LIGHT FIGURE 2F INFLATION VALVE CYLINDER PREPARATION COASTAL COMPACT 4 COASTAL COMPACT 2 May 29 13 8 8 9102...

Страница 121: ...100 inflation valve must be disposed of once fired or if found to be leaking However the M100 valve may be transferred to another cylinder only if the original cylinder is damaged or pitted See sectio...

Страница 122: ...ng Plug Snug Hand Tight 1 2 Removal of Inflation Valve from Cylinder 1 2 1 Important Make Sure Cylinder has been emptied prior to removing Inflation Valve Refer to Chapter 4 Testing for Gas System Inf...

Страница 123: ...r open ended wrench If using a socket A 6pt socket is recommended to minimize dings to the hex edges rotate the fitting to be removed to this cut out Step 1 Remove the straight outlet fitting IPL Fig...

Страница 124: ...g Housing Step 5 Using a socket wrench remove the Safety Disk Retainer IPL Fig 4 Item 110 Disk and Washer IPL Fig 4 Item 80 Step 6 Remove the Piston Housing IPL Fig 4 Item 140 Step 7 Remove the Spring...

Страница 125: ...Retainer Piston Step 9 Inspect all components for damage and corrosion replace as necessary Clean all components of old grease and dirt use cotton swabs to clean ports Use shop air to insure componen...

Страница 126: ...e Inflation Valve Reassembly Process 1 4 3 All O rings Safety Rupture Disk Piston and Spring are replaced every six years Scheduled during the cylinder valve inflation test and cylinder hydrostatic te...

Страница 127: ...Being sure the Safety Pin hole is facing upwards install the Piston Housing IPL Fig 4 Item 140 and Pull Lanyard IPL Fig 4 170 The Lanyard should be secure in the housing if installed correctly Hand t...

Страница 128: ...ings in Table A Step 7 Install Sealing Washer IPL Fig 4 Item 70 into Fill Fitting Cavity Step 8 Install Fill Fitting Poppet IPL Fig 4 Item 40 After Fill Fitting Poppet has been installed in Fill Fitti...

Страница 129: ...9 Install Fill Fitting Cap IPL Fig 4 Item 160 and hand tighten Step 10 Apply thread sealant Loctite to Outlet Fitting before installing Torque according to settings listed in Table A June 2 08 9102 8...

Страница 130: ...red until O ring enters the O ring groove on the top 1 5 4 Torque inflation valve into Cylinder using a NIST calibrated torque wrench Refer to torque Table A Torque Settings for correct torque value 1...

Страница 131: ...outlet connectors 1 6 3 Remove Fill Fitting Cap 1 6 4 Above figures show a picture of the Charge Adaptor proper installation of the charging hose using the Charge Adaptor and Quick Disconnect and a si...

Страница 132: ...cylinder Leave sitting for 1 hour 1 7 2 The purple Leak Test Solution is a combination of chemicals and water Based on the amount of CO2 leakage the solution will turn lighter in color or become clea...

Страница 133: ...M100 2 2 1 Inspect inflation valve threads for cleanliness and damage Ensure the valve is armed with the pull cable in place 2 2 2 Inspect cylinder threads for cleanliness and damage Carefully screw...

Страница 134: ...n Valve from Cylinder 2 3 1 Use ratchet and crows foot to remove Inflation Valve from Cylinder 2 3 2 Check threads for condition 2 3 2 1 Inflation Valves with worn threads must be discarded and replac...

Страница 135: ...metal key rings to the lifeline graspline loop patches See Fig 5 5 Spread out the liferaft on the packing surface See Fig 6A 7A 8A of Folding Diagrams Start by folding the raft from the left side bein...

Страница 136: ...het lengthwise on top of cylinder with the extra length of exposed painterline neatly folded to the side See Fig 12 16 Attach painterline sachet to valise using a 8 length of black nylon 1 16in cord I...

Страница 137: ...FIGURE 3 TOPPING OFF INFLATE DEFLATE VALVE FIGURE 4 ATTACHING THE CYLINDER June 2 08 9102 8 25...

Страница 138: ...FIGURE 5 STORAGE OF COMPONENTS Jan 18 11 8 26 9102...

Страница 139: ...FIGURE 6A CC2 FOLDING DIAGRAM STEP 1 Note Refer to Chapter 2 Description Table A for the L x W x H dimensions shown in the following folding diagrams June 2 08 9102 8 27...

Страница 140: ...FIGURE 6B CC2 FOLDING DIAGRAM STEP 2 June 2 08 8 28 9102...

Страница 141: ...FIGURE 6C CC2 FOLDING DIAGRAM STEP 3 June 2 08 9102 8 29...

Страница 142: ...FIGURE 6D CC2 FOLDING DIAGRAM STEP 4 D 53 25in June 2 08 8 30 9102...

Страница 143: ...FIGURE 6E CC2 FOLDING DIAGRAM STEP 5 June 2 08 9102 8 31...

Страница 144: ...FIGURE 6G CC2 FOLDING DIAGRAM CC4 STEP 7 June 2 08 8 32 9102...

Страница 145: ...FIGURE 7A CC4 FOLDING DIAGRAM STEP 1 Jan 18 11 9102 8 33...

Страница 146: ...FIGURE 7B CC4 FOLDING DIAGRAM STEP 2 Jan 18 11 8 34 9102...

Страница 147: ...FIGURE 7C CC4 FOLDING DIAGRAM STEP 3 Jan 18 11 9102 8 35...

Страница 148: ...FIGURE 7D CC4 FOLDING DIAGRAM STEP 4 Jan 18 11 8 36 9102...

Страница 149: ...FIGURE 7E CC4 FOLDING DIAGRAM STEP 5 Jan 18 11 9102 8 37...

Страница 150: ...FIGURE 7F CC4 FOLDING DIAGRAM STEP 6 D 71in Jan 18 11 8 38 9102...

Страница 151: ...FIGURE 7G CC4 FOLDING DIAGRAM STEP 7 Jan 18 11 9102 8 39...

Страница 152: ...FIGURE 7I CC4 FOLDING DIAGRAM STEP 9 Jan 18 11 8 40 9102...

Страница 153: ...FIGURE 8A CC6 FOLDING DIAGRAM STEP 1 Jan 18 11 9102 8 41...

Страница 154: ...FIGURE 8B CC6 FOLDING DIAGRAM STEP 2 Jan 18 11 8 42 9102...

Страница 155: ...FIGURE 8C CC6 FOLDING DIAGRAM STEP 3 Jan 18 11 9102 8 43...

Страница 156: ...FIGURE 8D CC6 FOLDING DIAGRAM STEP 4 Jan 18 11 8 44 9102...

Страница 157: ...FIGURE 8E CC6 FOLDING DIAGRAM STEP 5 Jan 18 11 9102 8 45...

Страница 158: ...FIGURE 8F CC6 FOLDING DIAGRAM STEP 6 Jan 18 11 8 46 9102...

Страница 159: ...FIGURE 8G CC6 FOLDING DIAGRAM STEP 7 Jan 18 11 9102 8 47...

Страница 160: ...FIGURE 8I CC6 FOLDING DIAGRAM STEP 9 Jan 18 11 8 48 9102...

Страница 161: ...FIGURE 9 PLACEMENT OF RAFT IN VALISE Jan 18 11 9102 8 49...

Страница 162: ...FIGURE 10 PAINTERLINE LOOPS FIGURE 11 ATTACHMENT OF CYLINDER NECK LOOP Jan 18 11 8 50 9102...

Страница 163: ...FIGURE 12 ATTACHMENT OF CABLE LOOP Jan 18 11 9102 8 51...

Страница 164: ...FIGURE 13 ATTACHMENT OF PAINTERLINE SACHET DETAIL A ATTACHMENT OF PAINTERLINE LOOP Jan 18 11 8 52 9102...

Страница 165: ...STORAGE 9 General 3 June 2 08 9102 9 1...

Страница 166: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 9 2 9102...

Страница 167: ...ntinuously exposed to direct sunlight weather or water spray All rafts should be stowed in a clean dry contaminant free area away from any heat source Contaminants such as petroleum solvents fuel grea...

Страница 168: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 9 4 9102...

Страница 169: ...TOOL EQUIPMENT AND MATERIALS May 29 13 9102 10 1 10 General 3 Tool List 5...

Страница 170: ...June 2 08 10 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 171: ...Compact liferafts Images of all the tools can be found in Chapter 12 Spare Parts To keep your tools in proper working order take care of them by Inspecting and adjusting daily Replacing worn or broken...

Страница 172: ...June 2 08 10 4 9102 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 173: ...free air supply of 5 6 to 7 0 kg cm2 80 to 100 psig regulated to 140 g cm2 2 0 psig for inflation purposes G Solution of mild liquid soap and water NOT detergent H Lint free cloth clean and dry I Plug...

Страница 174: ...in 0 50 lbf ft H Diffuser Cap 5 I Valve Charging Stem Quick Connect J Valve Charging Body Quick Connect K Bleed Down Tool L Socket 1 3 8in M Shop Towels Cotton Swabs N Alcohol Solvent O Crow Foot 1 1...

Страница 175: ...ILLUSTRATED PARTS LIST IPL 11 Introduction 3 Numerical Parts List 7 Detailed Parts List 13 Image List 25 May 29 13 9102 11 1...

Страница 176: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 2 9102...

Страница 177: ...different quantities per assembly will be assigned a suffix as a variant of the original part number e g 10 and 10A 3 PART NUMBERING Revere Supply Company part number 4 ILLUSTRATIONS A view of each a...

Страница 178: ...other items will reference If an item is applicable to all units the EFF CODE column is left blank Example Item 10 is used in Assembly 1B as indicated by the listing of effectivity code C Item 20 is u...

Страница 179: ...or per sub assembly as required 9 IMAGE NUMBER Certain illustrated parts are assigned image numbers which correspond to component photos in the Image List at the end of this section 10 VENDOR CODES AN...

Страница 180: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 6 9102...

Страница 181: ...ist of all part numbers included in the Detailed Parts List Each part number is followed by the applicable FIG ITEM number When a part number is referenced in more than one Figure both FIG ITEM number...

Страница 182: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 8 9102...

Страница 183: ...1 2 50B 1 41162 3 5 20 1 45 CC2V 1 1 RF 45 CC4V 1 1A RF 45 CC6V 1 1B RF 45 CC4VP 1 1C RF 45 CC6VP 1 1D RF 90 323 460 3 20 1 95 301 001 1 150 1 95 301 028 1 180 4 95 319 001 1 90 1 95 324 003 1 50 1 95...

Страница 184: ...4 40 1 95 41115 5 4 50 3 95 41115 6 4 60 1 95 41115 7 4 70 1 95 41115 8 4 80 1 95 41115 9 4 90 1 95 41115 10 4 100 1 95 41115 11 4 110 1 95 41115 12 4 120 1 95 41115 13 4 130 1 95 41115 14 4 140 1 95...

Страница 185: ...PART No FIG ITEM No UNITS PER ASSY 95 41163 103 5 60A 1 95 41162 101 1 200 1 95 41162 103 1 200A 1 95 41169 101 1 190 2 95 41171 101 1 210 1 95 41193 101 1 100 1 May 29 13 9102 11 11...

Страница 186: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 11 12 9102...

Страница 187: ...s are to be used for listed items without the prior written consent of Revere Supply Company Revere Supply Company will not accept responsibility for any equipment malfunction where unauthorized subst...

Страница 188: ...FIGURE 1 LIFE RAFT ASSEMBLY Jan 18 11 11 14 9102...

Страница 189: ...ve Assy Coastal Compact 4 See Fig 3 BD 1 20B 95 41114 103 Cylinder Valve Assy Coastal Compact 6 See Fig 3 CE 1 30 95 326 003 Topping Off Valve 1 1 40 95 325 002 Fixed Inlet Check 5 Female 1 2 50 95 32...

Страница 190: ...1 1 Valve Foam Cover Coastal Compact 2 A 1 10 160A 95 41111 2 Valve Foam Cover Coastal Compact 4 6 BCDE 1 11 170 95 41119 1 Owner s Manual 1 180 95 301 028 Key Ring DE 4 12 190 95 41169 101 Canopy Buc...

Страница 191: ...THIS PAGE INTENTIONALLY LEFT BLANK Jan 18 11 9102 11 17...

Страница 192: ...FIGURE 2 HULL ASSEMBLY Jan 18 11 11 18 9102...

Страница 193: ...B RF 1B 40 41156 101 Hull Assy Coastal Compact 6 C RF 10 37 41009 101 Knife Pocket 1 20 41013 103 Lifeline Graspline Loop Patch 8 30 41017 101 Light Holder 1 40 41029 101 Battery Holder 1 50 41083 101...

Страница 194: ...FIGURE 3 CYLINDER VALVE ASSEMBLY Jan 18 11 11 20 9102...

Страница 195: ...Valve Model 100 Not repairable Replace complete item A 1 14 10A 95 41115 101 Inflation Valve Model 41115 See Figure 4 for breakdown BC 1 15 20 90 323 460 Cylinder 460 gram CO2 filled Not refillable N...

Страница 196: ...FIGURE 4 INFLATION VALVE ASSEMBLY M41115 Jan 18 11 11 22 9102...

Страница 197: ...ng 1 80 95 41115 8 Washer Seal 1 90 95 41115 9 O Ring 2 010 1 100 95 41115 10 Safety Disk 1800 PSI Service 1 110 95 41115 11 Safety Disk Retainer 1 120 95 41115 12 Piston Spring 1 130 95 41115 13 Pist...

Страница 198: ...1630 Polybag 16in x 30in 1 20 41162 3 Ribbon 2in x 24in 1 30 95 41154 101 Canopy Assembly CC4 A 1 40 95 41155 103 Canopy Assembly CC6 B 1 50 95 41159 101 Canopy Arch Assembly CC4 A 1 50A 95 41159 103...

Страница 199: ...Inlet Check 5 Female Part 95 325 002 FIG ITEM QTY 1 40 1 ITEM 3 Pressure Release Valve Medium Flow Part 95 324 003 FIG ITEM QTY 1 50 1 ITEM 4 Painter Assembly Part 95 36 43009 101 Painterline 20ft Ref...

Страница 200: ...FIG ITEM QTY 1 90 1 ITEM 6 Knife Low Profile Part 95 41193 101 FIG ITEM QTY 1 100 1 ITEM 7 Sea Anchor Part 95 41027 101 FIG ITEM QTY 1 110 1 ITEM 8 Bailing Bucket Assembly Part 95 41065 101 FIG ITEM...

Страница 201: ...301 001 FIG ITEM QTY 1 150 1 ITEM 10 Valve Foam Cover CC2 Part 95 41111 1 FIG ITEM QTY 1 160 1 ITEM 11 Valve Foam Cover CC4 and CC6 Part 95 41111 2 FIG ITEM QTY 1 160A 1 ITEM 12 Key Ring Part 95 301...

Страница 202: ...14 Inflation Valve Model 100 Part 95 326 004 FIG ITEM QTY 3 10 1 ITEM 15 Inflation Valve Model 41115 Part 95 41115 101 FIG ITEM QTY 3 10A 4 1 1 RF ITEM 16 Cord Nylon 1 16 Black Part 41084 Sold as 95 3...

Страница 203: ...Canopy Kit Pack CC6 Part 95 41162 103 FIG ITEM QTY 1 200A 5 1A 1 RF ITEM 19 Valise Assembly CC2 Part 95 41104 101 FIG ITEM QTY 1 60 1 ITEM 20 Valise Assembly CC4 Part 95 41104 103 Valise Assembly CC4...

Страница 204: ...FIG ITEM QTY 1 60C 1 ITEM 22 Cylinder 460g CO2 Part 90 323 460 FIG ITEM QTY 3 20 1 ITEM 23 Cylinder DOT3AL1800 71in3 Part 90 327 071 FIG ITEM QTY 3 20A 1 ITEM 24 Cylinder DOT3AL1800 102in3 Part 90 327...

Страница 205: ...SPARE PARTS LIST 12 Introduction 3 Image List 5 Tool Image List 21 May 29 13 9102 12 1...

Страница 206: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 2 9102...

Страница 207: ...of ordering replacement parts It should not be used for any other purpose An image of each part is provided Each image has a corresponding Revere Supply Company part number and description of the ite...

Страница 208: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 4 9102...

Страница 209: ...IMAGE LIST Description Part Number Vinyl Tape 1 White 10 TAPE 1 Raft Tube Fabric PU Yellow 10 302 001 Canopy Fabric Orange 10 302 006 May 29 13 9102 12 5...

Страница 210: ...Description Part Number Certificate and Sticker 50 REV3002 Painterline Assembly 95 36 43009 101 Handpump 95 301 001 PRV Plug 95 301 014 May 29 13 12 6 9102...

Страница 211: ...Description Part Number Key Ring 95 301 028 Repair Cement 95 306 004 Thread Red Nylon 95 311 004 Nylon Cord 1 16in 95 313 004 May 29 13 9102 12 7...

Страница 212: ...Description Part Number Locator Light 95 319 001 Cylinder 460g CO2 95 323 460 Pressure Release Valve 95 324 003 Fixed Inlet Check 95 325 002 May 29 13 12 8 9102...

Страница 213: ...Description Part Number Topping Off Valve 95 326 003 Inflation Valve Model 100 95 326 004 Cylinder DOT3AL1800 71in3 90 327 071 Cylinder DOT3AL1800 102in3 90 327 102 May 29 13 9102 12 9...

Страница 214: ...Description Part Number Sea Anchor 95 41027 101 Cylinder Holder Extension Strap 95 41034 101 Label Cylinder Valve Assembly 95 41047 1 Bailing Bucket 95 41065 101 May 29 13 12 10 9102...

Страница 215: ...Description Part Number Inflation Instructions 95 41103 1 Valise CC2 95 41101 101 Valise CC4 Valise CC4 with canopy 95 41101 103 95 41104 109 Valise CC6 95 41101 113 May 29 13 9102 12 11...

Страница 216: ...Description Part Number Valve Foam Cover CC2 95 41111 1 Valve Foam Cover CC4 and CC6 95 41111 1 Inflation Valve Model 41115 95 41115 101 Coastal Compact Owner s Manual 95 41119 1 May 29 13 12 12 9102...

Страница 217: ...Description Part Number Canopy Kit Pack CC4 95 41162 101 Canopy Kit Pack CC6 95 41162 103 Canopy Buckle Strap 95 41169 101 Knife Low Profile 95 41193 101 May 29 13 9102 12 13...

Страница 218: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 14 9102...

Страница 219: ...TOOL IMAGE LIST Description Part Number Quick Connect Valve Charging Stem 40 338 005 Bleed Down Tool 40 338 007 Quick Disconnect Valve Charging Body 40 338 006 May 29 13 9102 12 15...

Страница 220: ...Description Part Number Hand Roller 80 338 003 O Ring Lubricant 95 DC 55 O Ring Lubricant 95 DC 111 Diffuser Cap 5 Brass 95 301 017 May 29 13 12 16 9102...

Страница 221: ...Description Part Number Socket 1 3 8 in 45 338 008 Inflation Tool 95 41128 101 Deflation Tool 3 8 in 95 41129 101 May 29 13 9102 12 17...

Страница 222: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 18 9102...

Страница 223: ...rsion of the certificate is provided to every service station Completion of this form is required at every service Copies of the form will then be sent to the appropriate group as follows White Vessel...

Страница 224: ...THIS PAGE INTENTIONALLY LEFT BLANK Jan 18 11 9102 A 2...

Страница 225: ...al Upper Tube On Off Lower Tube On Off Floor EQUIPMENT ITEMS Item Checked Replaced Item Checked Replaced Instruction hand book Survival manual Bailer Hand Foot pump Flashlight spare bulbs Paddles Sea...

Страница 226: ......

Отзывы:

Похожие инструкции для 45-CC2V