Cylinder charge weight
TABLE B
1.7 CO
2
Leak Test
After the cylinder is charged to the correct weight (See Table B) and is torque to the correct value (See
Table A), a leak test must be administered.
1.7.1
Using Revere Leak Test Solution (Part No. 50-CO2-LEAK), pour approximately 2oz. into a
4in. X 6in. poly bag to enclose the entire valve and neck of cylinder. Use 1in. masking
tape (or equivalent), secure the poly bag over the neck of the cylinder. Leave sitting for
1 hour.
1.7.2
The purple Leak Test Solution is a combination of chemicals and water. Based on the
amount of CO
2
leakage, the solution will turn lighter in color or become clear.
1.7.3
If the cylinder valve is leaking, check the torque settings and perform the test again.
1.7.4
If the cylinder valve is still leaking after the second test, discharge the cylinder and
overhaul the valve.
1.7.5
If the cylinder valve leaks after being overhauled and retested, replace the valve.
RAFT MODEL
CO
2
WT. LBS
(kg)
Coastal Compact 4
1.69 to 1.75 (.77 to .79)
Coastal Compact 6
2.43 to 2.50 (1.10 to 1.13)
Jan 18/11
8 - 20
9102
Содержание 45-CC2V
Страница 2: ......
Страница 4: ...June 2 08 RR 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 10: ...June 2 08 SB 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 28: ......
Страница 33: ...LIST OF ASSOCIATED PUBLICATIONS June 2 08 9102 AP 1 AP None Listed...
Страница 34: ...June 2 08 AP 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 36: ...June 2 08 AB 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 38: ...June 2 08 TC 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 1 2 9102...
Страница 44: ...June 2 08 2 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 50: ...FIGURE 2 VALISE June 2 08 2 8 9102...
Страница 51: ...FIGURE 3 GAS INFLATION SYSTEM May 29 13 9102 2 9...
Страница 54: ...FIGURE 4 RAFT DIMENSIONS Jan 18 11 2 12 9102...
Страница 56: ...FIGURE 5 DEPLOYMENT Jan 18 11 2 14 9102...
Страница 57: ...FIGURE 6 CANOPY ATTACHMENT Jan 18 11 9102 2 15...
Страница 58: ...Jan 18 11 2 16 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 59: ...DISASSEMBLY 3 General 3 Procedures 5 June 2 08 9102 3 1...
Страница 60: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 3 2 9102...
Страница 62: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 3 4 9102...
Страница 65: ...FIGURE 3 DISCONNECTING THE CYLINDER NECK LOOP Jan 18 11 9102 3 7...
Страница 66: ...FIGURE 4 UNFOLD RAFT DISENGAGE THE CYLINDER Jan 18 11 3 8 9102...
Страница 68: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 2 9102...
Страница 70: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 4 9102...
Страница 72: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 6 9102...
Страница 74: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 8 9102...
Страница 79: ...FIGURE 1 DIGITAL MANOMETER P N 95 41129 101 May 29 13 9102 4 13...
Страница 85: ...CLEANING June 2 08 9102 5 1 5 General 3 Procedures 5 A Liferafts 5 B Valise 5...
Страница 86: ...June 2 08 5 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 88: ...June 2 08 5 4 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 90: ...June 2 08 5 6 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 91: ...SERVICE INSPECTION AND CHECK 6 General 3 Gas Inflation System 5 Valise Pack 7 June 2 08 9102 6 1...
Страница 92: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 2 9102...
Страница 94: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 4 9102...
Страница 96: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 6 9102...
Страница 98: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 8 9102...
Страница 100: ...THIS PAGE IS INTENTIONALLY LEFT BLANK June 2 08 7 2 9102...
Страница 102: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 7 4 9102...
Страница 109: ...FIGURE 1 PATCHES AND TAPE APPLICATION June 2 08 9102 7 11...
Страница 110: ...FIGURE 2 PATCH APPLICATION OVER SEAM May 29 13 7 12 9102...
Страница 112: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 7 14 9102...
Страница 114: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 8 2 9102...
Страница 116: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 8 4 9102...
Страница 119: ...FIGURE 2C FOLDING SEA ANCHOR FIGURE 2D PAINTERLINE PREPARATION Jan 18 11 9102 8 7...
Страница 137: ...FIGURE 3 TOPPING OFF INFLATE DEFLATE VALVE FIGURE 4 ATTACHING THE CYLINDER June 2 08 9102 8 25...
Страница 138: ...FIGURE 5 STORAGE OF COMPONENTS Jan 18 11 8 26 9102...
Страница 140: ...FIGURE 6B CC2 FOLDING DIAGRAM STEP 2 June 2 08 8 28 9102...
Страница 141: ...FIGURE 6C CC2 FOLDING DIAGRAM STEP 3 June 2 08 9102 8 29...
Страница 142: ...FIGURE 6D CC2 FOLDING DIAGRAM STEP 4 D 53 25in June 2 08 8 30 9102...
Страница 143: ...FIGURE 6E CC2 FOLDING DIAGRAM STEP 5 June 2 08 9102 8 31...
Страница 144: ...FIGURE 6G CC2 FOLDING DIAGRAM CC4 STEP 7 June 2 08 8 32 9102...
Страница 145: ...FIGURE 7A CC4 FOLDING DIAGRAM STEP 1 Jan 18 11 9102 8 33...
Страница 146: ...FIGURE 7B CC4 FOLDING DIAGRAM STEP 2 Jan 18 11 8 34 9102...
Страница 147: ...FIGURE 7C CC4 FOLDING DIAGRAM STEP 3 Jan 18 11 9102 8 35...
Страница 148: ...FIGURE 7D CC4 FOLDING DIAGRAM STEP 4 Jan 18 11 8 36 9102...
Страница 149: ...FIGURE 7E CC4 FOLDING DIAGRAM STEP 5 Jan 18 11 9102 8 37...
Страница 150: ...FIGURE 7F CC4 FOLDING DIAGRAM STEP 6 D 71in Jan 18 11 8 38 9102...
Страница 151: ...FIGURE 7G CC4 FOLDING DIAGRAM STEP 7 Jan 18 11 9102 8 39...
Страница 152: ...FIGURE 7I CC4 FOLDING DIAGRAM STEP 9 Jan 18 11 8 40 9102...
Страница 153: ...FIGURE 8A CC6 FOLDING DIAGRAM STEP 1 Jan 18 11 9102 8 41...
Страница 154: ...FIGURE 8B CC6 FOLDING DIAGRAM STEP 2 Jan 18 11 8 42 9102...
Страница 155: ...FIGURE 8C CC6 FOLDING DIAGRAM STEP 3 Jan 18 11 9102 8 43...
Страница 156: ...FIGURE 8D CC6 FOLDING DIAGRAM STEP 4 Jan 18 11 8 44 9102...
Страница 157: ...FIGURE 8E CC6 FOLDING DIAGRAM STEP 5 Jan 18 11 9102 8 45...
Страница 158: ...FIGURE 8F CC6 FOLDING DIAGRAM STEP 6 Jan 18 11 8 46 9102...
Страница 159: ...FIGURE 8G CC6 FOLDING DIAGRAM STEP 7 Jan 18 11 9102 8 47...
Страница 160: ...FIGURE 8I CC6 FOLDING DIAGRAM STEP 9 Jan 18 11 8 48 9102...
Страница 161: ...FIGURE 9 PLACEMENT OF RAFT IN VALISE Jan 18 11 9102 8 49...
Страница 162: ...FIGURE 10 PAINTERLINE LOOPS FIGURE 11 ATTACHMENT OF CYLINDER NECK LOOP Jan 18 11 8 50 9102...
Страница 163: ...FIGURE 12 ATTACHMENT OF CABLE LOOP Jan 18 11 9102 8 51...
Страница 164: ...FIGURE 13 ATTACHMENT OF PAINTERLINE SACHET DETAIL A ATTACHMENT OF PAINTERLINE LOOP Jan 18 11 8 52 9102...
Страница 165: ...STORAGE 9 General 3 June 2 08 9102 9 1...
Страница 166: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 9 2 9102...
Страница 168: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 9 4 9102...
Страница 169: ...TOOL EQUIPMENT AND MATERIALS May 29 13 9102 10 1 10 General 3 Tool List 5...
Страница 170: ...June 2 08 10 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 172: ...June 2 08 10 4 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 176: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 2 9102...
Страница 180: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 6 9102...
Страница 182: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 8 9102...
Страница 186: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 11 12 9102...
Страница 188: ...FIGURE 1 LIFE RAFT ASSEMBLY Jan 18 11 11 14 9102...
Страница 191: ...THIS PAGE INTENTIONALLY LEFT BLANK Jan 18 11 9102 11 17...
Страница 192: ...FIGURE 2 HULL ASSEMBLY Jan 18 11 11 18 9102...
Страница 194: ...FIGURE 3 CYLINDER VALVE ASSEMBLY Jan 18 11 11 20 9102...
Страница 196: ...FIGURE 4 INFLATION VALVE ASSEMBLY M41115 Jan 18 11 11 22 9102...
Страница 205: ...SPARE PARTS LIST 12 Introduction 3 Image List 5 Tool Image List 21 May 29 13 9102 12 1...
Страница 206: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 2 9102...
Страница 208: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 4 9102...
Страница 218: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 14 9102...
Страница 222: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 18 9102...
Страница 224: ...THIS PAGE INTENTIONALLY LEFT BLANK Jan 18 11 9102 A 2...
Страница 226: ......