
PROCEDURE
Note:
It is recommended that the liferaft be packed by two men.
1.
Place the liferaft on a platform or in an open area with enough room to maneuver the liferaft and
valise during packing.
2.
Locate the topping-off (inflate/deflate) valve. Using a vacuum adapter (Part No. 95-41129-101)
connected to a vacuum source, evacuate all air from the compartment. Re-cap the topping off
valve as deflation progresses to prevent ingress of air. (See Fig. 3)
Note:
It is ESSENTIAL that the chambers are completely vacuumed since any air left
in them will make it very difficult to properly pack the liferaft and associated
equipment into the container/valise.
3.
Fit the fully charged gas cylinder into the cylinder holder at the rear of the liferaft. Once the
cylinder is secure, remove the diffuser cap (Part No. 95-301-017) and connect the straight outlet
to the fixed inlet check. Tighten to a torque of 14-15 ft-lbs. (See Fig. 4)
(See end of this Section for Charging of Cylinders).
4.
Properly stow all components in the liferaft before folding. For canopy versions only, install (2)
canopy buckle straps and (4) metal key rings to the lifeline/graspline loop patches. (See Fig. 5)
5.
Spread out the liferaft on the packing surface. (See Fig. 6A, 7A, & 8A of Folding Diagrams). Start
by folding the raft from the left side being sure to get the fold crease as close to the cylinder as
possible. (See Figs. 6B & 6C, 7B & 7C, and 8B & 8C of Folding Diagrams)
6.
For the Coastal Compacts 4 & 6 ONLY, fold back the remainder of the left side. (See Figs. 7D &
8D)
7.
Fold the right side of the raft over top the left side. Make sure to fold as close to the cylinder
valve as possible. (See Fig. 6D, 7E, & 8E – Folding Diagrams) For the Coastal Compacts 4 & 6
ONLY, fold back the remainder of the right side. (See Figs. 7F & 8F of Folding Diagrams)
8.
Starting at the end of the raft furthest away from the cylinder, begin folding the raft inwards.
Before the fold is complete, connect the battery plug to the battery. Raft edge should match with
raft centerline. (See Fig. 6D & 6E, 7F & 7G, and 8F & 8G of Folding Diagrams)
9.
Fold end with cylinder attached inward until the cylinder centerline matches the raft centerline.
The cylinder should be directly over the handpump. (See Fig. 6F, 7H, & 8H of Folding Diagrams)
10.
Fold ends of raft until they are snug around the cylinder. (See Fig. 6G & 7I – Folding Diagrams)
The raft folded dimensions are listed in Table D.
May 29/13
9102
8 - 23
Содержание 45-CC2V
Страница 2: ......
Страница 4: ...June 2 08 RR 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 10: ...June 2 08 SB 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 28: ......
Страница 33: ...LIST OF ASSOCIATED PUBLICATIONS June 2 08 9102 AP 1 AP None Listed...
Страница 34: ...June 2 08 AP 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 36: ...June 2 08 AB 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 38: ...June 2 08 TC 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 1 2 9102...
Страница 44: ...June 2 08 2 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 50: ...FIGURE 2 VALISE June 2 08 2 8 9102...
Страница 51: ...FIGURE 3 GAS INFLATION SYSTEM May 29 13 9102 2 9...
Страница 54: ...FIGURE 4 RAFT DIMENSIONS Jan 18 11 2 12 9102...
Страница 56: ...FIGURE 5 DEPLOYMENT Jan 18 11 2 14 9102...
Страница 57: ...FIGURE 6 CANOPY ATTACHMENT Jan 18 11 9102 2 15...
Страница 58: ...Jan 18 11 2 16 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 59: ...DISASSEMBLY 3 General 3 Procedures 5 June 2 08 9102 3 1...
Страница 60: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 3 2 9102...
Страница 62: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 3 4 9102...
Страница 65: ...FIGURE 3 DISCONNECTING THE CYLINDER NECK LOOP Jan 18 11 9102 3 7...
Страница 66: ...FIGURE 4 UNFOLD RAFT DISENGAGE THE CYLINDER Jan 18 11 3 8 9102...
Страница 68: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 2 9102...
Страница 70: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 4 9102...
Страница 72: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 6 9102...
Страница 74: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 8 9102...
Страница 79: ...FIGURE 1 DIGITAL MANOMETER P N 95 41129 101 May 29 13 9102 4 13...
Страница 85: ...CLEANING June 2 08 9102 5 1 5 General 3 Procedures 5 A Liferafts 5 B Valise 5...
Страница 86: ...June 2 08 5 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 88: ...June 2 08 5 4 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 90: ...June 2 08 5 6 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 91: ...SERVICE INSPECTION AND CHECK 6 General 3 Gas Inflation System 5 Valise Pack 7 June 2 08 9102 6 1...
Страница 92: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 2 9102...
Страница 94: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 4 9102...
Страница 96: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 6 9102...
Страница 98: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 8 9102...
Страница 100: ...THIS PAGE IS INTENTIONALLY LEFT BLANK June 2 08 7 2 9102...
Страница 102: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 7 4 9102...
Страница 109: ...FIGURE 1 PATCHES AND TAPE APPLICATION June 2 08 9102 7 11...
Страница 110: ...FIGURE 2 PATCH APPLICATION OVER SEAM May 29 13 7 12 9102...
Страница 112: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 7 14 9102...
Страница 114: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 8 2 9102...
Страница 116: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 8 4 9102...
Страница 119: ...FIGURE 2C FOLDING SEA ANCHOR FIGURE 2D PAINTERLINE PREPARATION Jan 18 11 9102 8 7...
Страница 137: ...FIGURE 3 TOPPING OFF INFLATE DEFLATE VALVE FIGURE 4 ATTACHING THE CYLINDER June 2 08 9102 8 25...
Страница 138: ...FIGURE 5 STORAGE OF COMPONENTS Jan 18 11 8 26 9102...
Страница 140: ...FIGURE 6B CC2 FOLDING DIAGRAM STEP 2 June 2 08 8 28 9102...
Страница 141: ...FIGURE 6C CC2 FOLDING DIAGRAM STEP 3 June 2 08 9102 8 29...
Страница 142: ...FIGURE 6D CC2 FOLDING DIAGRAM STEP 4 D 53 25in June 2 08 8 30 9102...
Страница 143: ...FIGURE 6E CC2 FOLDING DIAGRAM STEP 5 June 2 08 9102 8 31...
Страница 144: ...FIGURE 6G CC2 FOLDING DIAGRAM CC4 STEP 7 June 2 08 8 32 9102...
Страница 145: ...FIGURE 7A CC4 FOLDING DIAGRAM STEP 1 Jan 18 11 9102 8 33...
Страница 146: ...FIGURE 7B CC4 FOLDING DIAGRAM STEP 2 Jan 18 11 8 34 9102...
Страница 147: ...FIGURE 7C CC4 FOLDING DIAGRAM STEP 3 Jan 18 11 9102 8 35...
Страница 148: ...FIGURE 7D CC4 FOLDING DIAGRAM STEP 4 Jan 18 11 8 36 9102...
Страница 149: ...FIGURE 7E CC4 FOLDING DIAGRAM STEP 5 Jan 18 11 9102 8 37...
Страница 150: ...FIGURE 7F CC4 FOLDING DIAGRAM STEP 6 D 71in Jan 18 11 8 38 9102...
Страница 151: ...FIGURE 7G CC4 FOLDING DIAGRAM STEP 7 Jan 18 11 9102 8 39...
Страница 152: ...FIGURE 7I CC4 FOLDING DIAGRAM STEP 9 Jan 18 11 8 40 9102...
Страница 153: ...FIGURE 8A CC6 FOLDING DIAGRAM STEP 1 Jan 18 11 9102 8 41...
Страница 154: ...FIGURE 8B CC6 FOLDING DIAGRAM STEP 2 Jan 18 11 8 42 9102...
Страница 155: ...FIGURE 8C CC6 FOLDING DIAGRAM STEP 3 Jan 18 11 9102 8 43...
Страница 156: ...FIGURE 8D CC6 FOLDING DIAGRAM STEP 4 Jan 18 11 8 44 9102...
Страница 157: ...FIGURE 8E CC6 FOLDING DIAGRAM STEP 5 Jan 18 11 9102 8 45...
Страница 158: ...FIGURE 8F CC6 FOLDING DIAGRAM STEP 6 Jan 18 11 8 46 9102...
Страница 159: ...FIGURE 8G CC6 FOLDING DIAGRAM STEP 7 Jan 18 11 9102 8 47...
Страница 160: ...FIGURE 8I CC6 FOLDING DIAGRAM STEP 9 Jan 18 11 8 48 9102...
Страница 161: ...FIGURE 9 PLACEMENT OF RAFT IN VALISE Jan 18 11 9102 8 49...
Страница 162: ...FIGURE 10 PAINTERLINE LOOPS FIGURE 11 ATTACHMENT OF CYLINDER NECK LOOP Jan 18 11 8 50 9102...
Страница 163: ...FIGURE 12 ATTACHMENT OF CABLE LOOP Jan 18 11 9102 8 51...
Страница 164: ...FIGURE 13 ATTACHMENT OF PAINTERLINE SACHET DETAIL A ATTACHMENT OF PAINTERLINE LOOP Jan 18 11 8 52 9102...
Страница 165: ...STORAGE 9 General 3 June 2 08 9102 9 1...
Страница 166: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 9 2 9102...
Страница 168: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 9 4 9102...
Страница 169: ...TOOL EQUIPMENT AND MATERIALS May 29 13 9102 10 1 10 General 3 Tool List 5...
Страница 170: ...June 2 08 10 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 172: ...June 2 08 10 4 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 176: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 2 9102...
Страница 180: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 6 9102...
Страница 182: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 8 9102...
Страница 186: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 11 12 9102...
Страница 188: ...FIGURE 1 LIFE RAFT ASSEMBLY Jan 18 11 11 14 9102...
Страница 191: ...THIS PAGE INTENTIONALLY LEFT BLANK Jan 18 11 9102 11 17...
Страница 192: ...FIGURE 2 HULL ASSEMBLY Jan 18 11 11 18 9102...
Страница 194: ...FIGURE 3 CYLINDER VALVE ASSEMBLY Jan 18 11 11 20 9102...
Страница 196: ...FIGURE 4 INFLATION VALVE ASSEMBLY M41115 Jan 18 11 11 22 9102...
Страница 205: ...SPARE PARTS LIST 12 Introduction 3 Image List 5 Tool Image List 21 May 29 13 9102 12 1...
Страница 206: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 2 9102...
Страница 208: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 4 9102...
Страница 218: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 14 9102...
Страница 222: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 18 9102...
Страница 224: ...THIS PAGE INTENTIONALLY LEFT BLANK Jan 18 11 9102 A 2...
Страница 226: ......