
SERVICE BULLETIN NO. 09/16
Sept 20/16
9102
SB - 8
5323 Highway Avenue
Jacksonville, FL 32254
(T) 904.503.9733
(F) 904.503.9719
SPECIAL TOOLS, FIXTURES AND MATERIALS:
The following are required during filling:
Aluminum protection cap
Filling tool complete.
Tool for diaphragm holder
Spare diaphragm holders
TBA Permanite GT P.F.T.E,
Technical alcohol
SCHEDULE OF OVERHAUL PERIODS:
Adapter: On condition or maximum 5 years.
ACCESSORIES:
1.
Tool for diaphragm holder
005-657
2.
Spanner for the adapter size 36/30
Commercial
3.
Open spanner size 50
Commercial
4.
Filling head DK 94/99 system CO
2
90-029
5.
Seal kit DK 94/99 filling heads
90-029 pos. 2&5
6.
Transport protection cap for DK94/99 system
90-039
7.
Technical alcohol in 2.5 or 10 liter canister
Commercial
CHARGING PROCEDURE
To ensure correct and equal charging and to protect the diaphragm against overload during
charging, the following procedure should be followed.
When starting charging, there is no pressure in the cylinder, i.e. under the diaphragm, but there is
a possibility of high pressure on top of the diaphragm.
The diaphragm holder can withstand a certain difference in pressure (Pressure drop) across it,
without getting damaged.
Damaged in this case means the diaphragm itself will dome downwards under influence of the
pressure on the topside. If the pressure is too high the doming can crack the seal ring or blow off
the diaphragm, which will create leak problems. This is particularly relevant for high pressure Air
filled bottles.
Содержание 45-CC2V
Страница 2: ......
Страница 4: ...June 2 08 RR 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 10: ...June 2 08 SB 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 28: ......
Страница 33: ...LIST OF ASSOCIATED PUBLICATIONS June 2 08 9102 AP 1 AP None Listed...
Страница 34: ...June 2 08 AP 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 36: ...June 2 08 AB 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 38: ...June 2 08 TC 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 1 2 9102...
Страница 44: ...June 2 08 2 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 50: ...FIGURE 2 VALISE June 2 08 2 8 9102...
Страница 51: ...FIGURE 3 GAS INFLATION SYSTEM May 29 13 9102 2 9...
Страница 54: ...FIGURE 4 RAFT DIMENSIONS Jan 18 11 2 12 9102...
Страница 56: ...FIGURE 5 DEPLOYMENT Jan 18 11 2 14 9102...
Страница 57: ...FIGURE 6 CANOPY ATTACHMENT Jan 18 11 9102 2 15...
Страница 58: ...Jan 18 11 2 16 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 59: ...DISASSEMBLY 3 General 3 Procedures 5 June 2 08 9102 3 1...
Страница 60: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 3 2 9102...
Страница 62: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 3 4 9102...
Страница 65: ...FIGURE 3 DISCONNECTING THE CYLINDER NECK LOOP Jan 18 11 9102 3 7...
Страница 66: ...FIGURE 4 UNFOLD RAFT DISENGAGE THE CYLINDER Jan 18 11 3 8 9102...
Страница 68: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 2 9102...
Страница 70: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 4 9102...
Страница 72: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 6 9102...
Страница 74: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 4 8 9102...
Страница 79: ...FIGURE 1 DIGITAL MANOMETER P N 95 41129 101 May 29 13 9102 4 13...
Страница 85: ...CLEANING June 2 08 9102 5 1 5 General 3 Procedures 5 A Liferafts 5 B Valise 5...
Страница 86: ...June 2 08 5 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 88: ...June 2 08 5 4 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 90: ...June 2 08 5 6 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 91: ...SERVICE INSPECTION AND CHECK 6 General 3 Gas Inflation System 5 Valise Pack 7 June 2 08 9102 6 1...
Страница 92: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 2 9102...
Страница 94: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 4 9102...
Страница 96: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 6 9102...
Страница 98: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 6 8 9102...
Страница 100: ...THIS PAGE IS INTENTIONALLY LEFT BLANK June 2 08 7 2 9102...
Страница 102: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 7 4 9102...
Страница 109: ...FIGURE 1 PATCHES AND TAPE APPLICATION June 2 08 9102 7 11...
Страница 110: ...FIGURE 2 PATCH APPLICATION OVER SEAM May 29 13 7 12 9102...
Страница 112: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 7 14 9102...
Страница 114: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 8 2 9102...
Страница 116: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 8 4 9102...
Страница 119: ...FIGURE 2C FOLDING SEA ANCHOR FIGURE 2D PAINTERLINE PREPARATION Jan 18 11 9102 8 7...
Страница 137: ...FIGURE 3 TOPPING OFF INFLATE DEFLATE VALVE FIGURE 4 ATTACHING THE CYLINDER June 2 08 9102 8 25...
Страница 138: ...FIGURE 5 STORAGE OF COMPONENTS Jan 18 11 8 26 9102...
Страница 140: ...FIGURE 6B CC2 FOLDING DIAGRAM STEP 2 June 2 08 8 28 9102...
Страница 141: ...FIGURE 6C CC2 FOLDING DIAGRAM STEP 3 June 2 08 9102 8 29...
Страница 142: ...FIGURE 6D CC2 FOLDING DIAGRAM STEP 4 D 53 25in June 2 08 8 30 9102...
Страница 143: ...FIGURE 6E CC2 FOLDING DIAGRAM STEP 5 June 2 08 9102 8 31...
Страница 144: ...FIGURE 6G CC2 FOLDING DIAGRAM CC4 STEP 7 June 2 08 8 32 9102...
Страница 145: ...FIGURE 7A CC4 FOLDING DIAGRAM STEP 1 Jan 18 11 9102 8 33...
Страница 146: ...FIGURE 7B CC4 FOLDING DIAGRAM STEP 2 Jan 18 11 8 34 9102...
Страница 147: ...FIGURE 7C CC4 FOLDING DIAGRAM STEP 3 Jan 18 11 9102 8 35...
Страница 148: ...FIGURE 7D CC4 FOLDING DIAGRAM STEP 4 Jan 18 11 8 36 9102...
Страница 149: ...FIGURE 7E CC4 FOLDING DIAGRAM STEP 5 Jan 18 11 9102 8 37...
Страница 150: ...FIGURE 7F CC4 FOLDING DIAGRAM STEP 6 D 71in Jan 18 11 8 38 9102...
Страница 151: ...FIGURE 7G CC4 FOLDING DIAGRAM STEP 7 Jan 18 11 9102 8 39...
Страница 152: ...FIGURE 7I CC4 FOLDING DIAGRAM STEP 9 Jan 18 11 8 40 9102...
Страница 153: ...FIGURE 8A CC6 FOLDING DIAGRAM STEP 1 Jan 18 11 9102 8 41...
Страница 154: ...FIGURE 8B CC6 FOLDING DIAGRAM STEP 2 Jan 18 11 8 42 9102...
Страница 155: ...FIGURE 8C CC6 FOLDING DIAGRAM STEP 3 Jan 18 11 9102 8 43...
Страница 156: ...FIGURE 8D CC6 FOLDING DIAGRAM STEP 4 Jan 18 11 8 44 9102...
Страница 157: ...FIGURE 8E CC6 FOLDING DIAGRAM STEP 5 Jan 18 11 9102 8 45...
Страница 158: ...FIGURE 8F CC6 FOLDING DIAGRAM STEP 6 Jan 18 11 8 46 9102...
Страница 159: ...FIGURE 8G CC6 FOLDING DIAGRAM STEP 7 Jan 18 11 9102 8 47...
Страница 160: ...FIGURE 8I CC6 FOLDING DIAGRAM STEP 9 Jan 18 11 8 48 9102...
Страница 161: ...FIGURE 9 PLACEMENT OF RAFT IN VALISE Jan 18 11 9102 8 49...
Страница 162: ...FIGURE 10 PAINTERLINE LOOPS FIGURE 11 ATTACHMENT OF CYLINDER NECK LOOP Jan 18 11 8 50 9102...
Страница 163: ...FIGURE 12 ATTACHMENT OF CABLE LOOP Jan 18 11 9102 8 51...
Страница 164: ...FIGURE 13 ATTACHMENT OF PAINTERLINE SACHET DETAIL A ATTACHMENT OF PAINTERLINE LOOP Jan 18 11 8 52 9102...
Страница 165: ...STORAGE 9 General 3 June 2 08 9102 9 1...
Страница 166: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 9 2 9102...
Страница 168: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 9 4 9102...
Страница 169: ...TOOL EQUIPMENT AND MATERIALS May 29 13 9102 10 1 10 General 3 Tool List 5...
Страница 170: ...June 2 08 10 2 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 172: ...June 2 08 10 4 9102 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 176: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 2 9102...
Страница 180: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 6 9102...
Страница 182: ...THIS PAGE INTENTIONALLY LEFT BLANK June 2 08 11 8 9102...
Страница 186: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 11 12 9102...
Страница 188: ...FIGURE 1 LIFE RAFT ASSEMBLY Jan 18 11 11 14 9102...
Страница 191: ...THIS PAGE INTENTIONALLY LEFT BLANK Jan 18 11 9102 11 17...
Страница 192: ...FIGURE 2 HULL ASSEMBLY Jan 18 11 11 18 9102...
Страница 194: ...FIGURE 3 CYLINDER VALVE ASSEMBLY Jan 18 11 11 20 9102...
Страница 196: ...FIGURE 4 INFLATION VALVE ASSEMBLY M41115 Jan 18 11 11 22 9102...
Страница 205: ...SPARE PARTS LIST 12 Introduction 3 Image List 5 Tool Image List 21 May 29 13 9102 12 1...
Страница 206: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 2 9102...
Страница 208: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 4 9102...
Страница 218: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 14 9102...
Страница 222: ...THIS PAGE INTENTIONALLY LEFT BLANK May 29 13 12 18 9102...
Страница 224: ...THIS PAGE INTENTIONALLY LEFT BLANK Jan 18 11 9102 A 2...
Страница 226: ......