9.3 Series
– Parallel connection of batteries (12V)
Figure 9.3
Four 6V batteries connected in series
– parallel
Fig. 9.3
shows two strings in parallel; each string consists of two 6V batteries in series. For
example, say each battery has 225 Ah. Each string would have a voltage of 12V with a capacity
of 225 Ah. When these strings are paralleled, the total capacity of the battery bank will be 12V at
450Ah. Notice that the cables connecting the batteries in series and parallel are of heavier gauge
than the ones coming from the controller. These cables have to be of heavier gauge because
when power is drawn from an inverter, it involves large amounts of current. This interconnection
cable is often sized according to the power of the inverter.
Also, the negative cable from the controller to the battery should be placed at the opposite end of
the battery bank.
Figure 9.3
shows this connection.
Содержание Off-Grid Kit
Страница 8: ...8 Wiring 1 Unscrew battery terminals and connect battery connections...
Страница 10: ...10 4 Insert battery remote sensor block terminal and connect wires POLARITY SENSITIVE...
Страница 16: ...16...
Страница 17: ...17 Repeat for each Z Bracket in the set at each corner...
Страница 18: ...18...
Страница 20: ...20...
Страница 21: ...21 NOTE Orient panel in level plumb layout as desired before fixing in position...
Страница 23: ...23 Repeat for all brackets NOTE Seal around all edges of bracket and screws...
Страница 26: ...26 NOTE Mark all holes locations in this step as the panel must be removed for well nut insertion...
Страница 27: ...27...
Страница 29: ...29 NOTE Orient panel in level plumb layout as desired before fixing in position...
Страница 30: ...30 Repeat for all fasteners NOTE Screw has compressed and expanded the well nut binding into the roof material...
Страница 36: ...36 NOTE Start lag bolt threading by hand...
Страница 37: ...37 Rail System Construction 2 1...
Страница 38: ...38 4 3...
Страница 39: ...39 6 5...
Страница 40: ...40 Repeat for all continuous rail sets Rail Seating 7 1...
Страница 41: ...41 3 2...
Страница 42: ...42 5 4...
Страница 43: ...43 Panel Securement WARNING End clamps must be installed a minimum of 1 30 mm from the rail edges 6 1...
Страница 44: ...44 3 2...
Страница 45: ...45 5 4 NOTE Ensure that the End Clamp is spaced a minimum distance of 1 25 from rail end face...
Страница 46: ...46 Continue mid clamp procedure for each additional panel 6 7...
Страница 55: ...55 Figure 7 Figure 8...