Renogy Off-Grid Kit Скачать руководство пользователя страница 23

23

 

 

 

 

Repeat for all brackets. 

 
 
 
 
 

 

 

NOTE: 

Seal  around 

all  edges  of  bracket 
and screws. 

 

Содержание Off-Grid Kit

Страница 1: ...1 Off Grid Kit Renogy off grid kit general Manual 2775 E Philadelphia St Ontario CA 91761 1 800 330 8678...

Страница 2: ...LY recommended to install a charge controller in order to charge your batteries It is dangerous for unregulated panels to be connected to battery banks 3 Make sure all wire connections are secured loo...

Страница 3: ...panel is covered with an opaque dark material such as paper or cloth during the installation Do not make contact with the terminals when the panel is exposed to sunlight or any other light source Prec...

Страница 4: ...34 Rail System Construction 37 Rail Seating 40 Panel Securement 43 Pole Mount System 48 Fasten L Channels to L Brackets 49 Slide U Bolt through back face of L Channel 50 Attach Support Arm to bottom L...

Страница 5: ...well as flooded batteries The RENOGY Off Grid Solar Kit also includes a mounting system comprised of sturdy aluminum Z Brackets as well as the nuts and bolts required to flat mount a solar panel onto...

Страница 6: ...ler CAUTION Refer to the technical specifications for max wire sizes on the controller and for the maximum amperage going through wires Mounting Recommendations WARNING Never install the controller in...

Страница 7: ...n The clearance should be at least 6 inches 150mm 3 Cut out Wall section the recommended wall size to be cut should follow the inner protruding part of the charge controller while being careful not to...

Страница 8: ...8 Wiring 1 Unscrew battery terminals and connect battery connections...

Страница 9: ...9 2 Unscrew PV terminals and connect PV connections 3 Insert temperature sensor block terminal and connect wires POLARITY SENSITIVITY DOES NOT MATTER...

Страница 10: ...10 4 Insert battery remote sensor block terminal and connect wires POLARITY SENSITIVE...

Страница 11: ...ction we are going to cover the basics for mounting 12V solar panels using the following RENOGY Z Bracket Mount system RENOGY Rail Mount System Rail mount vs Z Bracket RENOGY Single Pole Mount System...

Страница 12: ...uch as sheds or garages It is also suited as attachment to a user made structure such as a wooden frame The system comes complete with all fasteners to secure the system to the installation surface Th...

Страница 13: ...tening of fasteners Torque wrench allows for careful monitoring of torque value to prevent overtightening 6mm Socket Drive Used with ratchet to tighten down bolted joint between panel and Z Bracket 5...

Страница 14: ...tible with your specific installation Spirit Level Used to ensure panel is level and or plumb to the mounting surface and orientation WARNING Installation on shingle roofs is not recommended System is...

Страница 15: ...15 NOTE Various solar modules will have different varieties of mounting hole locations Please align brackets in a way that will evenly support the module...

Страница 16: ...16...

Страница 17: ...17 Repeat for each Z Bracket in the set at each corner...

Страница 18: ...18...

Страница 19: ...19 Install of Panel to General Mounting Surface NOTE Ensure screw locations are backed by structural element such as a rafter stud etc...

Страница 20: ...20...

Страница 21: ...21 NOTE Orient panel in level plumb layout as desired before fixing in position...

Страница 22: ...22 Repeat for all fastener locations NOTE Begin new fastener at indicated location first to secure panel in level plumb level layout...

Страница 23: ...23 Repeat for all brackets NOTE Seal around all edges of bracket and screws...

Страница 24: ...uired for this section Image Component Description Well Nut Special recessed fastener which expands as the internal fastener is tightened Allows for fastener to seal within mounting surface and embed...

Страница 25: ...sed to drill clearance holes for well nuts in roof top Drill Bit Used with Cordless Drill to create clearance holes for the well nuts Must be matched to the well nut s outer diameter Recommended varie...

Страница 26: ...26 NOTE Mark all holes locations in this step as the panel must be removed for well nut insertion...

Страница 27: ...27...

Страница 28: ...28 Repeat for all holes NOTE Use of sealant is optional with a well nut but sealing will add extra assurance Seal under well nut head...

Страница 29: ...29 NOTE Orient panel in level plumb layout as desired before fixing in position...

Страница 30: ...30 Repeat for all fasteners NOTE Screw has compressed and expanded the well nut binding into the roof material...

Страница 31: ...its themselves coupled with Splice Kits L Feet End Clamps and Mid Clamps as well as all required fasteners to secure all components together This product makes the installation of long continuous rows...

Страница 32: ...rque Wrench Allows for tightening of fasteners to a specified maximum torque Prevents overtightening and better control of joint assembly 6mm Hex Bit w Socket Drive Bit to be used with torque wrench t...

Страница 33: ...own into roof studs Secures L Feet to roof Recommended 3 in length Needs compatible zinc coated washer Socket Drive Used in conjunction with the torque wrench to tighten down lag bolts into the roof s...

Страница 34: ...QMSC or a third party stand off system to clear obstructions please consult those product manuals for additional instruction before proceeding with this section NOTE Leave L Foot fasteners attached to...

Страница 35: ...staller should verify Ensure attachment points L Feet are spaced at maximum 48 apart Rails should be spaced apart a maximum of 60 the length of the spanning panel edge NOTES Maintain bit such that it...

Страница 36: ...36 NOTE Start lag bolt threading by hand...

Страница 37: ...37 Rail System Construction 2 1...

Страница 38: ...38 4 3...

Страница 39: ...39 6 5...

Страница 40: ...40 Repeat for all continuous rail sets Rail Seating 7 1...

Страница 41: ...41 3 2...

Страница 42: ...42 5 4...

Страница 43: ...43 Panel Securement WARNING End clamps must be installed a minimum of 1 30 mm from the rail edges 6 1...

Страница 44: ...44 3 2...

Страница 45: ...45 5 4 NOTE Ensure that the End Clamp is spaced a minimum distance of 1 25 from rail end face...

Страница 46: ...46 Continue mid clamp procedure for each additional panel 6 7...

Страница 47: ...ARNING End clamps must be installed a minimum of 1 30 mm from the rail edges Repeat procedure for each panel row 8 NOTE Ensure that the End Clamp is spaced a minimum distance of 1 25 from rail end fac...

Страница 48: ...finish Infinitely adjustable between 15 65 degrees Precision hole positioning and alignment Easy rapid assembly Well illustrated instructions Wind resistance of 120mph 1 year material warranty Recomm...

Страница 49: ...the spring washer C Feed the thread of the Cap Head Bolt G through both L Channel C and Washer s hole Repeat for all 4 holes D Align the L Bracket C with the bottom face of the L Channel B and feed th...

Страница 50: ...up to pole so that L Channel B back face is flush to surface of the pole and slide the U Bolt E through the holes B Fasten U Bolt E with a large washer L and 1 or 2 nuts M depending on how much thread...

Страница 51: ...olt G through Support Arm D and the L Bracket C D Fasten it with small Nuts K D The orientation should be close to Figure 3 E Repeat for the other side Figure 3 Note The reason for this is that depend...

Страница 52: ...sired The optimum angle will vary with your apparent position relative to the sun Range is usually from 60 75 degrees from the vertical C Once desired angle has been achieved fasten the T Slotted Brac...

Страница 53: ...hieving this may require reorienting the T Slotted Bracket A It is recommended to fasten the Support Arms D to the T Slotted Brackets temporarily until you can attempt to orient the assembly on the de...

Страница 54: ...t the clamps as they are in Figure 6 E Once End Clamps J and in a position to hold the panel slide the panel onto the bracket slide the End Clamp over the edge of the panel so that the surfaces are fl...

Страница 55: ...55 Figure 7 Figure 8...

Страница 56: ...onnectors This type of connector system is easy to install and uses a snap in type of safety locking clips to lock the two mating connectors The snap in feature avoids unintentional disconnection The...

Страница 57: ...sing unassembled MC4 Connectors for custom cabling it is recommended that the appropriate crimper is used this will avoid loose connections and create a strong internal contact when mating the MC4 Con...

Страница 58: ...other connections Most PWM Controllers have automatic battery voltage detection and the controller must detect what voltage level it will be charging at Figure 6 1 Charge controller connected to a 12...

Страница 59: ...otection an in line fuse can be added to this cable This is usually done with a fuse holder If opting for an in line fuse please do the following before connecting the positive cable to the charge con...

Страница 60: ...sert the fuse into the fuse holder The controller should power on 5 If opting for no in line fuse connect the bare stranded portion of the cable to the positive battery input terminal on the charge co...

Страница 61: ...gauge size is 12 AWG Unassembled MC4 Connectors can also be purchased separately to make a custom adapter cable suitable for different length specifications Caution The typical connection for 12V pane...

Страница 62: ...or from the panel that has the positive label with the Male MC4 connector of your adapter kit as show in Figure 6 4 3 The positive solar cable can be fused for protection an in line fuse can be added...

Страница 63: ...charge controller before the solar panel is connected to the charge controller As we mentioned in last Section the battery bank must first be connected to the charge controller before any other conne...

Страница 64: ...1 Completed 24V off grid system As you can see from Figure 7 1 the batteries are configured in 24V by placing two identical 12V batteries in series Likewise the solar array is configured in 24V by pl...

Страница 65: ...based on the total array current Sizing the cable incorrectly may result in melting wires and or fire 8 1 Two adjacent panels in parallel 12V systems Figure 8 2 Two RNG 100D Panels in parallel One of...

Страница 66: ...connecting three solar panels in parallel Remember that this arrangement is applicable if the three solar panels are to be mounted adjacent to one another This connection requires two 2 pairs of MC4 B...

Страница 67: ...panels must be extended with MC4 Extension Cables sold separately 8 3 Four panels in parallel 12V systems 1x4 configuration Figure 8 5 Four RNG 100D Panels in parallel Fig 8 5 above shows the arrange...

Страница 68: ...r panels are to be mounted in a 2x2 configuration as shown above Please note the orientation of the junction boxes This connection requires a one 1 pair of MC4 Branch Connectors When one or multiple p...

Страница 69: ...ime with your bare hands 9 1 Series connection of batteries 12V Figure 9 1 Two 6V batteries connected in series When two or more batteries are connected in a series their voltages add up but the Amp H...

Страница 70: ...l they will form a battery bank of 12V with a capacity of 200 Ah Notice that the cables connecting the batteries in parallel are of heavier gauge than the ones coming from the controller These cables...

Страница 71: ...total capacity of the battery bank will be 12V at 450Ah Notice that the cables connecting the batteries in series and parallel are of heavier gauge than the ones coming from the controller These cable...

Страница 72: ...6V batteries in series Fig 9 5 Remember that when batteries are in series the voltages add but the total capacity of a string of batteries stays the same For example if two 12V batteries with 150Ah r...

Страница 73: ...series For example if wiring four 12V 150Ah batteries like as shown in Figure 9 6 then each string will have a total capacity of 24V 150Ah By paralleling these strings the total capacity would be 24V...

Страница 74: ...y qualified electrical maintenance personnel familiar with the construction and operation of solar electrical equipment and the hazards involved Failure to observe this precaution may result in bodily...

Страница 75: ...ase refer to the owner s manual for the proper wire gauge size and fuse ratings for each inverter Ground The negative battery terminal and the chassis ground of the inverter should be connected to a s...

Отзывы: