
60
3.
Once the fuse holder is in place, don’t attach a fuse just yet. Connect the bare stranded
portion of the cable to the
positive (+)
battery terminal on the charge controller.
4. The
fuse between controller and battery should be the current rating of the
controller.
Once the fuse is properly sized, ensure that all connections were made
properly, and that there are no loose connections present. Finally, insert the fuse into the
fuse holder.
The controller should power on.
5. If opting for
no in-line fuse
, connect the bare stranded portion of the cable to the
positive
(+)
battery input terminal on the charge controller directly from the
positive (+)
battery
post, bypassing the fuse holder.
The controller should power on.
Warning!
Be careful not to short the battery. Reverse polarity connection will
damage the charge controller and the resulting damage will not be covered
by warranty.
Maxi blade fuse
Controller to Battery Fuse = Current Rating of Charge
Controller
Ex. 30A ViewStar CC = 30A from Controller to Battery
Содержание Off-Grid Kit
Страница 8: ...8 Wiring 1 Unscrew battery terminals and connect battery connections...
Страница 10: ...10 4 Insert battery remote sensor block terminal and connect wires POLARITY SENSITIVE...
Страница 16: ...16...
Страница 17: ...17 Repeat for each Z Bracket in the set at each corner...
Страница 18: ...18...
Страница 20: ...20...
Страница 21: ...21 NOTE Orient panel in level plumb layout as desired before fixing in position...
Страница 23: ...23 Repeat for all brackets NOTE Seal around all edges of bracket and screws...
Страница 26: ...26 NOTE Mark all holes locations in this step as the panel must be removed for well nut insertion...
Страница 27: ...27...
Страница 29: ...29 NOTE Orient panel in level plumb layout as desired before fixing in position...
Страница 30: ...30 Repeat for all fasteners NOTE Screw has compressed and expanded the well nut binding into the roof material...
Страница 36: ...36 NOTE Start lag bolt threading by hand...
Страница 37: ...37 Rail System Construction 2 1...
Страница 38: ...38 4 3...
Страница 39: ...39 6 5...
Страница 40: ...40 Repeat for all continuous rail sets Rail Seating 7 1...
Страница 41: ...41 3 2...
Страница 42: ...42 5 4...
Страница 43: ...43 Panel Securement WARNING End clamps must be installed a minimum of 1 30 mm from the rail edges 6 1...
Страница 44: ...44 3 2...
Страница 45: ...45 5 4 NOTE Ensure that the End Clamp is spaced a minimum distance of 1 25 from rail end face...
Страница 46: ...46 Continue mid clamp procedure for each additional panel 6 7...
Страница 55: ...55 Figure 7 Figure 8...