69
Battery Configurations
The battery system can also be configured to create a “bank” of batteries. In this section, we cover
the most basic configurations. When wiring batteries, extreme attention should be given. Never
short a battery, as high currents can cause severe burns or even death.
Hazards!
It is recommended that insulated/non-conducting tools be used when
working with batteries. Never leave tools on top of the battery. Always wear
eye protection. Never touch both of the battery terminals at the same time
with your bare hands.
9.1 Series connection of batteries (12V)
Figure 9.1
Two 6V batteries connected in series
When two or more batteries are connected in a series, their voltages add up, but the Amp-Hour
(AH) capacity remains the same.
Fig. 9.1
shows two 6V batteries in series. For example, say
each battery has 225 Ah. This wiring will form a 12V battery bank with a capacity of 225 Ah. Notice
that the cables connecting the batteries in series are of heavier gauge than the ones coming from
the controller. These cables have to be of heavier gauge because when power is drawn from an
inverter, it involves large amounts of current. This interconnection cable is often sized according
to the power of the inverter.
Содержание Off-Grid Kit
Страница 8: ...8 Wiring 1 Unscrew battery terminals and connect battery connections...
Страница 10: ...10 4 Insert battery remote sensor block terminal and connect wires POLARITY SENSITIVE...
Страница 16: ...16...
Страница 17: ...17 Repeat for each Z Bracket in the set at each corner...
Страница 18: ...18...
Страница 20: ...20...
Страница 21: ...21 NOTE Orient panel in level plumb layout as desired before fixing in position...
Страница 23: ...23 Repeat for all brackets NOTE Seal around all edges of bracket and screws...
Страница 26: ...26 NOTE Mark all holes locations in this step as the panel must be removed for well nut insertion...
Страница 27: ...27...
Страница 29: ...29 NOTE Orient panel in level plumb layout as desired before fixing in position...
Страница 30: ...30 Repeat for all fasteners NOTE Screw has compressed and expanded the well nut binding into the roof material...
Страница 36: ...36 NOTE Start lag bolt threading by hand...
Страница 37: ...37 Rail System Construction 2 1...
Страница 38: ...38 4 3...
Страница 39: ...39 6 5...
Страница 40: ...40 Repeat for all continuous rail sets Rail Seating 7 1...
Страница 41: ...41 3 2...
Страница 42: ...42 5 4...
Страница 43: ...43 Panel Securement WARNING End clamps must be installed a minimum of 1 30 mm from the rail edges 6 1...
Страница 44: ...44 3 2...
Страница 45: ...45 5 4 NOTE Ensure that the End Clamp is spaced a minimum distance of 1 25 from rail end face...
Страница 46: ...46 Continue mid clamp procedure for each additional panel 6 7...
Страница 55: ...55 Figure 7 Figure 8...