59
Refer
to Figure 6.1
for connections.
1. First, connect the negative cable to the
negative (−)
battery post. The best way to secure
the battery cable to the battery post is by using a
ring terminal
. A bolt is sufficient to
secure the ring terminal onto the battery post; doing so will allow for great electrical
contact. Next, connect the bare stranded portion of the cable to the
negative (−)
battery
input terminal on the charge controller.
2. Similarly to the instructions described above, connect the positive cable to the
positive
(+)
battery post. For protection, an in-line fuse can be added to this cable. This is usually
done with a fuse holder. If opting for an in-line fuse, please do the following before
connecting the
positive (+)
cable to the charge controller:
Make sure the fuse holder’s gauge wire size is matched.
Attach the fuse holder to the line with a butt connector or by soldering it.
The butt connectors recommended for this application are the type with heat shrink insulation.
This will keep will give extra protection for the internal connection.
Use a crimper to splice the Maxi fuse holder with the battery cable. Once a strong connection is
achieved, use a
heat gun
to shrink the insulation on the butt connectors.
Heat Shrink Butt Connector
Butt Connector
Crimper
Maxi Fuse Holder
Содержание Off-Grid Kit
Страница 8: ...8 Wiring 1 Unscrew battery terminals and connect battery connections...
Страница 10: ...10 4 Insert battery remote sensor block terminal and connect wires POLARITY SENSITIVE...
Страница 16: ...16...
Страница 17: ...17 Repeat for each Z Bracket in the set at each corner...
Страница 18: ...18...
Страница 20: ...20...
Страница 21: ...21 NOTE Orient panel in level plumb layout as desired before fixing in position...
Страница 23: ...23 Repeat for all brackets NOTE Seal around all edges of bracket and screws...
Страница 26: ...26 NOTE Mark all holes locations in this step as the panel must be removed for well nut insertion...
Страница 27: ...27...
Страница 29: ...29 NOTE Orient panel in level plumb layout as desired before fixing in position...
Страница 30: ...30 Repeat for all fasteners NOTE Screw has compressed and expanded the well nut binding into the roof material...
Страница 36: ...36 NOTE Start lag bolt threading by hand...
Страница 37: ...37 Rail System Construction 2 1...
Страница 38: ...38 4 3...
Страница 39: ...39 6 5...
Страница 40: ...40 Repeat for all continuous rail sets Rail Seating 7 1...
Страница 41: ...41 3 2...
Страница 42: ...42 5 4...
Страница 43: ...43 Panel Securement WARNING End clamps must be installed a minimum of 1 30 mm from the rail edges 6 1...
Страница 44: ...44 3 2...
Страница 45: ...45 5 4 NOTE Ensure that the End Clamp is spaced a minimum distance of 1 25 from rail end face...
Страница 46: ...46 Continue mid clamp procedure for each additional panel 6 7...
Страница 55: ...55 Figure 7 Figure 8...