19
Certification for
Date 01/2003
Initial operation
Subsequent operation
of a REMKO air-conditioning system
The room air conditioning system above was put into operation without any objections.
The operator has been trained and the operating instructions distributed.
The unit could not be put into operation for the reasons indicated above.
Company:
Street:
Postal code, city:
Stamp and signature
Executing company:
Date Operator signature
Unit data
Outdoor part Indoor unit A
Indoor unit B
Indoor unit C
Indoor unit D
Type of unit
RKV
RKV
RKV
RKV
Unit number
Refrigerant line length/height
———–
m/ m
m/ m
m/ m
m/ m
Oil elevation arcs
———–
units
units
units
units
Additional amount
———–
g
g
g
g
Condensation pump
———–
Operator / Setup location
Name:
Street:
Postal code, city:
Telephone:
Fax:
Testing of cycles
A
B
C
D
Result
Visible check:
Setup of outdoor part and indoor unit
R
good
Q
poor
Heat-exchanger, insulation, lines
R
good
Q
poor
Electrical fuse protection type A
R
good
Q
poor
Electrical power/control line (Cu mm²/mm²)
/
/
/
/
R
good
Q
poor
Impermeability check:
Vacuum mbar
R
good
Q
poor
Excess pressure mbar
R
good
Q
poor
Add. preparation:
Refrigerant refill amount g
R
good
Q
poor
Shut-off valves open
R
good
Q
poor
Functional test:
Condensation flow, condensation pump(s)
R
good
Q
poor
Cooling mode
R
good
Q
poor
Remote control
R
good
Q
poor
Operational check:
Compressor
R
good
Q
poor
Fan mode
R
good
Q
poor
Measurement tests:
Room temp. / Air outlet temp. °C / °C
/
/
/
/
R
good
Q
poor
Suction temp. / Overheating °C / K
/
/
/
/
R
good
Q
poor
Comments:
Heating mode
(only for cooling/heating units)
R
good
Q
poor
Signature of person assembling / putting unit into operation
Содержание RKW 10 W
Страница 2: ......