11
Assembly Instructions for
Service Personnel
Important instructions prior to installation
à
Only use the swivel nuts supplied for the refrigerant
lines.
Other components can damage the thread.
à
Ensure that the contents of the package are com-
plete and that the units have no visible damage re-
sulting from transport. Any problems must be com-
municated directly to your contract partner and the
shipping company.
Subsequent complaints will not be acknowledged.
à
Place the unit in its original packaging as close as
possible to the location where it will be assembled.
à
Do not install the unit in the direct vicinity of objects
that emit intense heat.
Lights, etc.
à
Select a location to set up the unit where air can flow
freely in and out of the device.
Minimum distances are 120 mm on the top and bot-
tom.
à
The condensation line must be placed at an incline
of at least 2 %.
à
If this line is connected to the drainage line, an odour
seal must be installed the upper edge of which may
not extend beyond the lower edge of the indoor unit.
à
Remove the protective caps of the unit connections
just before connecting the refrigerant lines.
à
All electrical connections must meet the relevant re-
quirements. The power supply is only connected to
the outdoor part.
à
The control line to the indoor unit should be placed
together with the refrigerant line.
à
Make sure that the electrical lines have been prop-
erly attached in the electrical terminals.
à
The indoor unit and outdoor part of the REMKO air-
conditioner have been adjusted to one another from
a technical standpoint.
The guarantee becomes null and void if third-party
components are used.
à
Remember that when installing and maintaining air
conditioners, high-pressure refrigerant lines and
electrical current can pose hazards.
à
During unit operation, some components in the cold
cycle can reach temperatures of more than 70 °C.
Be especially careful when covers are removed.
à
The air intake and outlet openings may not be
blocked by furniture, curtains, etc.
à
The refrigerant lines may not be bent or pressed.
à
Protect open refrigerant lines from moisture with
suitable caps or tape.
à
Prevent unnecessary bends to minimise the pres-
sure loss in the refrigerant lines and ensure that the
compressor oil can recirculate properly.
à
If the outdoor part is mounted above the indoor unit,
make sure to take steps to recirculate the oil
.
Install oil elevation arcs.
à
Make sure that all refrigerant lines including all con-
nectors and valves are insulated against heat and
sealed against diffusion.
Wall lead-throughs
Wall lead-throughs are necessary to establish the con-
nection between the indoor unit and the outdoor part.
Please observe the following:
à
For the connection line to the outdoor part, a lead-
through of at least 70 mm in diameter must be cre-
ated.
à
The lead-through must be placed at an incline of at
least 10 mm from the inside to the outside.
à
Before beginning work, make sure that there are no
supply lines (water, etc.) located in the vicinity of the
wall lead-through.
à
We recommend cushioning the inside of the hole or
lining it with a PVC pipe to prevent the lines from be-
ing damaged.
à
After assembly is complete, the wall lead-through
must be sealed with a suitable sealing compound.
Do not use any materials containing cement or lime!
Control line
Refrigerant
intake line
Condensation line
Refrigerant
injection line
Wall lead-through diagram
Содержание RKW 10 W
Страница 2: ......