Connecting the pump
The pump must be connected to the standard PCB of the PCU. Proceed
as follows:
1. Connect the cable supplied with the boiler to the pump.
2. Remove the grommet from the opening in the middle of the base of
the boiler.
3. Pass the pump cable through the base of the boiler and seal the
opening by tightening the bayonet fitting to the cable.
4. Connect the pump cable to the cable in the instrument box that is
connected with connector X8.
5. Add the pump cable to the cable bundles by opening and closing the
cable bundle bands.
Fig.20
Connecting the power supply cable
AD-0000043-01
5
X8
X81
X81
2
3
X81
1
4
6 Installation
123157 - v.12 - 07022018
33
Содержание Quinta Pro 115
Страница 86: ...14 Appendix 86 123157 v 12 07022018 ...