installation
FRAMING AND FINISHING
P121-10 - See Thru
P131-10 - Pier
Note: These units are
non-load bearing.
1) For ease of installation, frame your fireplace after it is positioned and the vent system is installed. Remember to install the top standoffs. See the "Unit
Assembly Prior to Installation" section. Use 2x4's and frame to local building codes.
CAUTION: Verify your fireplace dimensions, framing methods and finished wall facing details before framing. Determine the total thickness of
facing material - drywall plus ceramic tiles, slate, etc. Allow the finish surface to be flush with the front or side of the unit. Total facing thickness
can vary from 1/2" (13mm) to 1-1/4" (32mm) thick.
2) When locating your appliance on an exterior wall or in a chase, apply a vapour barrier and drywall, as per local building codes.
DO NOT INSULATE THE
FIREPLACE ITSELF.
CAUTION: The unit does not have to be completely enclosed in a chase. The clearance on top of the unit is 0" to the standoffs so combustible
building materials can be laid directly on top of the standoffs. You must maintain clearance from the vent to combustible materials for both rigid
and flex, see Vent Clearances in the "Clearances" section.
Framing Dimensions
P121-10 (See Thru)
A
25"(635mm)
minus 2X the finishing
material thickness*
A
25"(635mm)
minus 1X the finishing
material thickness*
B
42-1/2"(1080mm)
B
42-1/2"(1080mm)
C
46-3/4"(1187mm)
C
45" (1143mm)
minus 1X the finishing
material thickness*
* Finish material thickness includes: drywall, ceramic tile, slate, etc.