20
|
CV40E-11 City Series
installation
Levelling bolts
Levelling Bolts
There are four levelling bolts - two on each side
that can be adjusted if required.
Access Panel Removal
The front access panel may be removed for ease
of hooking up gas and electrical. Once complete
ensure that the access panel is reinstalled prior to
any finishing.
The CV40E has 4 screws to remove access cover.
See locations in diagrams to the right.
4 screws
Содержание CB40E-LP11
Страница 79: ...CV40E 11 City Series 79 parts list 7 8 9 2 1 3 6 4 5 12 17 27 19 20 18 22 6a 26 24 23 25 11 ...
Страница 84: ...84 CV40E 11 City Series warranty ...
Страница 85: ...CV40E 11 City Series 85 notes ...
Страница 86: ...86 CV40E 11 City Series notes ...
Страница 87: ...CV40E 11 City Series 87 ...