Installation
Fillcontrol Auto Make-up and degassing — 06.07.2016 - Rev. B
English — 25
6.4.1
Control cabinet terminal plan
1
Pressure
3
Fuses
2
Level
Terminal Designation
Signal
Notes
X0/ 1
Supply (230 V)
L
User supplied
•
Wiring at the terminal block next to the fuses
X0/ 2
N
X0/ 3
PE
4
Makeup (230 V)
Y1
Is installed
•
Fillcontrol Auto 2PS
5
N
6
PE
13
Floating signal contact 1
User supplied, optional
14
23
Group message (floating)
NC
User supplied, optional
24
COM
25
NO
69
Contact water meter (system separator
tank)
+24 V DC
Factory
70
E2
43
Contact water meter (option)
+24 V DC
Is installed
•
Fillcontrol Auto 2PS
44
E1
39
Pressure transducer
+18 V
Is installed
40
GND
41
AE
42
PE (shield)
15
Pump 1 (230 V)
M1
Is installed
16
N
17
PE