Installation
Fillcontrol Auto Make-up and degassing — 06.07.2016 - Rev. B
English — 23
Hydraulic connection, with Fillcontrol Auto 2PS as example.
1
Make-up line
•
Fillcontrol Auto 2PS
•
Fillcontrol Auto 2P
2
Degassing line
•
Fillcontrol Auto 2PS
Device connection to the facility system:
•
Fillcontrol Auto 2PS.
– Make-up line "1" for degassed water from the device to the facility system.
– Make-up line "2" for gas-rich water from the facility system to the device.
•
Fillcontrol Auto 2P.
– Make-up line "1" to the facility system.
Proceed as follows:
1. Ensure the permissible water temperature at the connection to the facility system.
2. For the connection, note the direction of flow of the main volume flow.
3. Connect the degassing line from the make-up line to the facility system.
4. Ensure a minimum distance of 500 mm.
– When connecting the degassing lines for Fillcontrol Auto 2PS
5. Ensure a torque-free (stress-free) installation of the pipes.
6. After installation, flush the pipes to remove dirt particles.
Note!
For Fillcontrol Auto 2P, the connection of the degassing line is not required.