24
MIN.
300
MIN. 400
MIN.
300
1140
MIN. 600 *
600
700
850
500 *
5 - POSITIONING
REQUIREMENTS FOR INSTALLATION OF THE PLANT - POSITIONING
The most important thing to do before installation of the boiler is to set aside a suitable area that meets the minimum requirements for
installation.
•
the minimum clearance in front of the product
to allow suitable access for cleaning, maintenance, etc. must be
700 mm
;
• the minimum permissible distance between the back of the product and a wall must be
400 mm
;
• the minimum distance between the top of the product and a wall (ceiling) must be
600 mm
to ensure easy access to the heat
exchanger for cleaning and maintenance (e.g. for removing ash and possible installation of the pellet suction kit);
• the minimum clearance between the product and the wall (side) must be
300 mm
.
COMPACT 14 BOILER MINIMUM REQUIREMENTS
* in the event of suction kit installation
Содержание COMPACT 14-2015
Страница 1: ...INSTALLATION GUIDE GB Instructions in English PELLET BOILER COMPACT 14 2015...
Страница 54: ...52 3 2 5 5 17 13 11 4 4 15 14 7 6 1 V 10 MENU ITEMS AND FUNCTION CONFIGURATION 4...
Страница 74: ......
Страница 75: ......