The boiler/water heater should be cleaned and 
inspected once a year, before each heating season. 
Make sure that the burner and ignition components are 
free from dust, soot, dirt, corrosion or other deposits 
that would impair the boiler/water heater ‘s performance. 
Refer to page 36 for component identifi cation.  

Burner Inspection And Removal - Figure 20

1.   Close the manual shutoff valves in the gas supply 

lines and turn off electrical power to the boiler/water 
heater. 

2.   Remove the front jacket panels. 
3.   Disconnect the manifold gas piping at the ground 

joint union(s). Also disconnect the pressure sensing 
lines, pilot tubing and ignition and sensing leads. 

4.   Remove the manifold(s). 
5.   Remove the burner(s) from the lower front combus-

tion chamber panel. 

6.   Inspect the burners for damage or signs of 

deterioration. Use a brush or compressed air to 
remove any debris from the burner ports. 

7.   DO NOT install a damaged or badly corroded 

burner replace it. 

8.   Install the burner(s) making sure that the burner 

gasket is not torn or deteriorated. If it is replace it.

9.   Reassemble the unit following the removal steps in 

reverse order.

Heat Exchanger Inspection - Figure 20 

1.   Close the manual shutoff valve in the gas supply 

line and turn off electrical power to the boiler/water 
heater. 

2.   Remove the jacket front panels. 
3.   Disconnect the gas piping at the ground joint 

union(s). Also disconnect the pressure sensing 
lines, pilot tubing and ignition and sensing leads. 

4.   Remove the 1/4 inch nuts and washers holding the 

upper combustion chamber front panel in place and 
carefully remove it. 

5.   Inspect the inside and outside of the heat exchanger 

for signs of damage, sooting or corrosion. 

6.   The outside surfaces of the copper tubes should be 

free of any soot deposits. A slight black smudge is 
normal with some types of gases. Black soot 
indicates poor combustion. Green deposits indicate 
condensation due to low return water temperatures. 
In either case the heat exchanger must be cleaned 
thoroughly and the problem resolved before the 
boiler/water heater is returned to service 

7.   If there are no signs of damage, sooting or corrosion 

reassemble the unit following the previous steps in 
reverse order. 

8.   A badly corroded or damaged heat exchanger must 

be replaced, see the 

Heat Exchanger Removal 

section.

Gas Pressure Switch 

Optional low and/or high-pressure gas pressure 
switches will shut down the 24V circuit if excessively 
high or low gas pressure exists in the gas train or supply 
piping.

MAINTENANCE 

WARNING: Disconnect electrical power and 
close the manual gas shut off valve before 
performing maintenance or severe personal 
injury may result!

WARNING: Improper installation, adjustment, 
alteration, service or maintenance can cause 
property damage, personal injury, exposure to 
hazardous materials or loss of life.  Installation 
and service must be performed by a qualifi ed 
installer, service agency or the gas supplier who 
must read and follow the supplied instructions 
before installing, servicing or removing this 
boiler.  This boiler contains crystalline silica 
m a t e r i a l s   t h a t   h av e   b e e n   i d e n t i f i e d   a s 
carcinogenic or possibly carcinogenic to 
humans when inhaled.

AVERTISSEMENT: Une installation, un réglage, 
une modifi cation, une réparation ou un entretien 
non comforme aux normes peut entraîner des 
dommages matériels, des blessures, exposition 
à des matières dangereuses ou la mor t.  
L’installation et l’entretien doivent être effectués 
par un installateur ou un service d’entretien 
qualifi é ou le fournisseur de gaz qui doivent 
avoir lu les instructions fournies avant de faire 
l’installation, l’entretien ou l’enlèvement de la 
chaudière et les respecter, Cette chaudière 
contient des matériaux qui ont été identifi és 
comme étant cancérogènes ou pouvant l’ être.

 

CAUTION: Servicing, inspection and adjustment 
must be done by a trained technician in accordance 
with all applicable local and national codes.  
Improper servicing or adjustment can damage the 
boiler/water heater!

WARNING: The ceramic combustion chamber 
contains crystalline silica. Wear a tightly fi tted 
dust mask when removing the burners or heat 
exchanger to prevent inhalation of airborne 
fibers. Crystalline silica fibers have been 
i d e n t i f i e d   a s   c a rc i n o g e n i c ,  o r   p o s s i bly 
carcinogenic when inhaled.

Содержание LCD Series

Страница 1: ...se gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch Do not...

Страница 2: ...form to the Standard for Controls and Safety Devices for Automatically Fired Boilers ANSI ASME CSD 1 In Canada the installation must be in accordance with the requirements of CSA B149 1 or 2 Installat...

Страница 3: ...acent construction should a leak occur or during routine maintenance If such a location doesn t exist a suitable drain pan that s adequately drained must be installed under the unit 5 DO NOT place thi...

Страница 4: ...the minimum clearances listed in Table 1 must be maintained between it and any combustible construction When installed in a confined space without the intake air option Figures 1 2 3 two permanent op...

Страница 5: ...l Venting using a Masonry Chimney and Inside Air Figure 3 Horizontal Venting using Inside Air Table 2 305 TO 457 127 TO 254 VENT PIPE DIAMETER 5 TO 10 12 TO 18 MINIMUM VERTICAL RISE OFF THE TOP OF UNI...

Страница 6: ...ional area of not less than 1 in2 per 7 000 Btuh 310 mm2 per kW up to and including 1 million Btuh plus 1 in2 per 14 000 Btuh 155 mm2 per kW in excess of 1 million Btuh Intake Air Option General Guide...

Страница 7: ...exhaust and combustion air terminals must be installed on the same plane outside wall in order to prevent pressure differences due to prevailing winds In cold climates double wall or insulated inlet p...

Страница 8: ...on Air and Venting Metal Chimney System Shown Figure 7 Combination Air Intake And Venting Masonry Chimney Shown 10 FT 3 1 m 4 FT 1 2 m 5 FT 1 5 m 1 5 FT 0 5 m 5 1 2 FT 1 7 m 1 5 FT 5m 10 FT 3 1 m 3 FT...

Страница 9: ...venting material must be approved for the application Consult the vent manufacturer s product literature GENERAL VENTING GUIDELINES WARNING The vent installation must be in accordance with Part 7 Ven...

Страница 10: ...nector must terminate flush with the inside of the chimney flue Figure 2 Fasten each single wall vent connection with at least 3 corrosion resistant sheet metal screws WARNING Never install a vent pip...

Страница 11: ...a 4 ft 1 2 m horizontal distance is maintained from electric meters gas meters regulators and relief equipment and not less than 7 ft 2 1 m from any adjacent public walkway The bottom of the vent term...

Страница 12: ...ose all building doors and windows and all doors between the space in which the appliances remaining connected to the common venting system are located and other spaces of the building Turn on clothes...

Страница 13: ...vered under the manufacturer s warranty Excessive pitting and erosion of the internal surface of the copper heat exchanger tubes is NOT covered under the manufacturer s warranty if the result of high...

Страница 14: ...itch The flow switch supplied with the boiler water heater must be wired to the terminal strip in the control panel to prevent the boiler from firing unless there s adequate water flow through the uni...

Страница 15: ...e flow rate required to maintain the desired temperature rise across the boiler heat exchanger The system pump is sized to provide the required flow to the heating system The boiler piping connections...

Страница 16: ...g Check with local codes and ordinances for specific requirements Adjustment Procedure To Maintain Inlet Temperature Above Dew Point T1 Temp Min 110 For Atmospheric T1 Temp Min 125 Sealed Combusion 1...

Страница 17: ...ng must be sized large enough to handle maximum flow through unit 4 All boilers furnished with factory mounted outlet water temperature gauge 5 Boiler pump purging required Use terminals supplied 6 Va...

Страница 18: ...osion of the heat exchanger Water that has a hardness greater than 18 grains per gallon and or a level of dissolved solids exceeding 350 ppm will require a recalculation of the pump size and temperatu...

Страница 19: ...g the warranty The method outlined below can be employed to prevent this condition from occurring A balancing valve should be installed on the outlet side of the water heater for purposes of adjusting...

Страница 20: ...6 Common piping must be sized for maximum combined heater flow 7 Hot water tanks should be equipped with a combination temperature pressure relief valve 8 MA Code requires an 1 8 hole in check valve...

Страница 21: ...valve must be installed in the supply piping It should be installed 5 ft 1 5 m above the floor where required by local codes Provide a sediment trap at the bottom of the vertical section of the gas s...

Страница 22: ...trapped in the heating system piping When applicable provisions for vent bleed and gas relief lines must be made in accordance with the latest revision of ANSI Z223 1 NFPA 54 Safe lighting and other p...

Страница 23: ...Table 13 identifies the stages and firing modes associated with the standard single stage units Table 14 identifies the stages and firing modes associated with the two stage option Table 13 Firing Mod...

Страница 24: ...above The FSM will continue to cycle the unit through steps 3 4 and 6 until the unit lights or the demand for heat is removed Main Burner Once the pilot is proven the MV terminal on the FSM is energi...

Страница 25: ...the flame sense module FSM is energized 2 The FSM starts the 10 second ignition trial energizing relay R7 the pilot solenoid valve and the spark generator 3 The pilot valve and spark generator are en...

Страница 26: ...gas is heavier than air and can collect in low areas Propane gas can ignite or explode if an ignition source is present and result in death serious injury and property damage FOR YOUR SAFETY Have only...

Страница 27: ...should match those listed in Table 15 To adjust the differential air pressure see the AIRFLOW ADJUSTMENT instructions in the CHECKING AND ADJUSTMENTS section Figure 19 Manual Valve Manifold Pressure T...

Страница 28: ...faut proc der l entretien 3 Fermer la vanne manuelle d arr t d alimintation de gaz CHECKING ADJUSTMENTS 1 With the burners in operation close the manual shutoff valve in the gas supply line As soon a...

Страница 29: ...b to the off position Figure 18 3 Observe the pilot flame through one of the observation ports located at the left and right ends of the unit For L600 L2300 1 Remove the upper front jacket panel 2 Tur...

Страница 30: ...pressure switch confirms proper air flow These time delays are set within the separate time delay board connected to the relay board PROPANE GAS Optimum results are obtained when the boiler water heat...

Страница 31: ...lem resolved before the boiler water heater is returned to service 7 If there are no signs of damage sooting or corrosion reassemble the unit following the previous steps in reverse order 8 A badly co...

Страница 32: ...heat exchanger out of the unit 10 Remove the V baffle straps and V baffles 11 Thoroughly inspect the heat exchanger for signs of damage If there is no damage clean the heat exchanger with water from a...

Страница 33: ...ter at normal system pressure If it does contact a qualified service technician to have it inspected NEVER try to clean or repair the relief valve If the valve fails to operate properly have it replac...

Страница 34: ...as From Unit shown in connection diagram No Power To Blower s Blower s not plugged in Plug in blower s Defective blower timer TD3 Replace Blower Timer TD3 Blower s malfunctioning Replace blower s Uni...

Страница 35: ...rating control set too low Increase control temperature setting Unit Consistently Shuts Down High limit set too low Increase high limit setting On High Limit Bad Combustion Insufficient air Check CO C...

Страница 36: ...LCD INSTALLATION AND OPERATION INSTRUCTIONS Page 36 RIOM 23 REV B Figure 23 Exploded View...

Страница 37: ...106 1 1 70 3107 1 1 1 70 3108 1 1 70 3109 1 1 70 3110 1 1 3 Jacket Left Panel 03 2155 1 1 1 1 1 1 1 03 1822 1 1 1 1 Jacket Left Panel SS 03 2155 1 1 1 1 1 1 1 1 03 1822 1 1 1 1 1 4 Junction Box Assemb...

Страница 38: ...1 03 1802 1 03 1803 1 03 1804 1 03 1806 1 03 1807 1 1 03 1808 1 03 1809 1 03 1810 1 Jacket Top Panel SS 03 1801 1 1 1 03 1802 1 1 03 1803 1 1 03 1804 1 1 03 1806 1 1 03 1807 1 1 1 03 1808 1 1 03 1809...

Страница 39: ...1 1 1 1 1 1 Comb Chamber Lower Right Side Panel 70 2773 1 1 1 1 1 1 1 1 1 1 1 18 Comb Chamber Upper Left Side Panel 70 2770 1 1 1 1 1 1 1 1 1 1 1 Comb Chamber Upper Right Side Panel 70 2771 1 1 1 1 1...

Страница 40: ...t Orifice NG 10 0089 1 1 1 1 1 1 1 1 1 1 Pilot Orifice LP 10 0090 1 1 1 1 1 1 1 1 1 1 Pilot Orifice NG 10 0093 1 Pilot Orifice LP 10 0120 1 30 Burner Tube 10 0275 2 3 5 7 9 13 15 17 19 25 27 Burner Tu...

Страница 41: ...4 4 4 6 6 6 NS Heat Exchanger Support Channel 03 2022 1 03 2023 1 03 2024 1 NS Tube Replacement Assembly 70 3080 2 2 70 3081 2 70 3082 2 70 3083 2 70 3085 2 70 3086 2 36 O Ring Inlet Outlet Return Hea...

Страница 42: ...1 1 1 1 1 1 49 Manual Shut Off Valve 1 11 0465 1 1 Manual Shut Off Valve 1 1 4 11 0466 1 1 Manual Shut Off Valve 1 1 2 11 0467 1 1 1 Manual Shut Off Valve 2 11 0454 1 50 Flame Sensor UTC 1003 Ignition...

Страница 43: ...idewall Vent Kit HS5 12 0002K1 1 1 1 NS Sidewall Vent Kit with air intake hood HS1 12 0009K 1 1 Sidewall Vent Kit with air intake hood HS2 12 0010AK 1 Sidewall Vent Kit with air intake hood HS2 12 001...

Страница 44: ...DED IS VENT VERTICAL THROUGH THE ROOF OUTDOOR AIR SENSOR INSTALLED WIRED IS VENT THROUGH THE WALL ARE UNITS RACKED IS POWER VENT INSTALLED AND WIRED IS RACK ASSEMBLED TIGHTLY SEALED COMBUSTION NO HOLE...

Страница 45: ...stion Air Damper Power Vent Proving Switch Barometric Damper COMMISSIONING THE UNIT Customer Instructed Yes No All Covers Replaced Yes No Wiring Secure Tight Yes No Customer Given Manual Yes No Cabine...

Страница 46: ...de wall horizontally vented gas fueled equipment is installed in a crawl space or an attic the hard wired carbon monoxide detector with alarm and battery back up may be installed on the next adjacent...

Страница 47: ...structions for the installation of the venting system design or the venting system components and 2 A complete parts list for the venting system design or venting system d MANUFACTURER REQUIREMENTS GA...

Страница 48: ...hrough the tubes and is not covered by the manufacturer s warranty See Installation Instructions for proper pump performance Chemical corrosion no corrosive chemical freon dry cleaning chemicals degre...

Отзывы: