2.1 Installation checklist
Installation includes the following activities:
Installation Task
1
Plan your system
2
Obtain all required equipment and tools
3
Site all equipment
4
Route all cables.
5
Drill cable and mounting holes.
6
Make all connections into equipment.
7
Secure all equipment in place.
8
Power on test the system.
Schematic diagram
A schematic diagram is an essential part of planning any installation.
It is also useful for any future additions or maintenance of the
system. The diagram should include:
• Location of all components.
• Connectors, cable types, routes and lengths.
2.2 Inboard autopilot system
A typical inboard autopilot will consist of the items shown:
SMART
PILOT
3
4
5
1
2
D10432-2
1.
Autopilot control head
— This provides the display and
controls required to use the autopilot. Multiple controllers can be
added if required, for example a controller at each helm position.
12
SPX SmartPilot installation instructions
Содержание SmartPilot SPX-10
Страница 1: ......
Страница 2: ......
Страница 4: ......
Страница 6: ...6 SPX SmartPilot installation instructions ...
Страница 10: ...10 SPX SmartPilot installation instructions ...
Страница 40: ...40 SPX SmartPilot installation instructions ...
Страница 44: ...44 SPX SmartPilot installation instructions ...
Страница 49: ......
Страница 50: ...www raymarine com ...