Wuxi Raycus Fiber Laser Technologies Co., Ltd.
User Guide of Raycus RFL-A6000D~A12000D
32
6 Wiring diagram and operation steps
6.1 Internal control in ON mode
Figure 20 wiring diagram of “ON” mode
Operation methods:
a) The rear panel air switch hits ON to supply power to the laser.
b) The front panel key switch is turned ON to put the laser into ON mode.
c) Open the upper computer software.
d) Hit the red ON button to view the red light.
e) Turn off the AD mode, turn off the external control mode. (this mode can be remembered when
the power is off)
f) Click the main power ON button in the upper computer software to turn on the main power.
g) Wait for the laser tricolor light green light on, the laser ready to work completed.
h) Set the light output parameters.
i) Click the ON button in the software of the host computer to turn on the main power supply.
j) Check the red light of the laser tricolor lamp is on and the laser is outputting light.