Site requirements
Internal temperature and time controls are supplied
These provide control of cooking and hot water
temperatures. The cooker is supplied with 2-channel
programmer:-
Channel 1 supplies hot water - Marked “BOILER”.
Channel 2 controls the cooker burner - Marked “COOKER”.
A separate switch in conjunction with the hot water
channel gives priority to either the domestic hot water or
the supply of hot water for central heating/DHW (if
external controls are fitted).
It is recommended that independent temperature
controls are provided for comfortable room temperatures,
for economic operation and for control of the domestic
hot water flow to the cylinder.
Consideration should be given to fitting a frost thermostat
which should be set to operate at a temperature of
approximately 4°C
11
HEATING CONTROLS
Содержание Heatranger 480D
Страница 8: ...Site requirements 7 DESN 510519 FIG 1...
Страница 14: ...13 Site requirements FIG 4...
Страница 23: ...Sealed Systems 22...
Страница 24: ...23...
Страница 25: ...24...