Suitability

The boiler is designed for use on a fully pumped low
pressure hot water circulation system, with a pumped
over rum facility or alternatively on a sealed system
limited to 2 bar.

SEE FIG. 3

Space and water heating systems should be in
accordance with the relevant recommendation of BS
5410: Part 1.

In a combined central heating and domestic hot water
system, the hot water storage vessel must be of the
indirect cylinder type to BS 1566: Part 1. The hot water
storage vessel should be insulated with not less than
75mm thick mineral fibre or its equivalent.

Cisterns and pipework situated in areas which may be
exposed to freezing conditions should be insulated.

Draining taps must be located in accessible positions
which permit the draining of the whole system, including
the heat storage vessel. Draining taps should be at least
1/2in. BSP nominal size and be in accordance with BS
2879.

The appliance boiler section should be connected to a
cistern water supply, subject to a maximum head of
18.25m. The heating system must be designed (and
adjusted if necessary) to give a temperature differential
across the boiler at full output of 10-14

˚

C. When

horizontal runs are used the pipes should rise upwards in
the direction away from the appliance.

Circulating Pump

It is recommended that the selected pump be sized to
suit the boiler pressure loss (see Fig 3) and therefore
adequate to give the required temperature differential
between the flow and return.

The pump should be able to meet the requirements of
the system design and fitted in a readily accessible
position.

Isolating Valves

Isolating valves (preferably of the keyless type) must be
fitted to the inlet and outlet of the circulating pump to
facilitate service and replacement of pump without
draining the system.

Inhibitor

A corrosion inhibitor MUST be added to the heating
system to protect the heat exchanger and pipework.
Inhibitor must also be replaced if the system is drained
after installation. As a precaution the heating MUST also
be flushed out prior to the addition of the inhibitor to
ensure any flux, debris is removed.

Site requirements

10

WATER CIRCULATION SYSTEM

FIG. 3

Содержание Heatranger 480D

Страница 1: ...WARNING This information is a copy of an original archive therefore Aga cannot be held responsible for its continued accuracy...

Страница 2: ...O T H E R G B I E P A T E N T S P E N D I N G PLEASE READ THESE INSTRUCTIONS BEFORE INSTALLING THIS APPLIANCE For use in GB and IE Installation Instructions Heatranger 480D A At t t th he e H He ea ar...

Страница 3: ...Glass Yarn Mineral Wool Insulation Pads Ceramic Fibre May be harmful if inhaled May be irritating to skin eyes nose and throat When handling avoid contact with skin or eyes Use disposable gloves face...

Страница 4: ...nce L H side panel Oil Inlet R1 4 1 4 BSP Taper Ext Electrical Supply 230V 50Hz 3 amp Fused Flue Outlet 150mm CO2 BOILER 11 5 COOKER 11 0 Max Water Temp 82 C Water Capacity of 25 5 litres Boiler Weigh...

Страница 5: ...5 29 3 23 5 OIL PRESSURE Bar psi OIL BURNING RATE cc m HEAT INPUT kW BOILER OUTPUT kW 480K COOKER BURNER BOILER BURNER BURNER NOZZLE US g h 0 40 80 SF 9 0 130 17 6 0 8 MAX 9 0 130 29 3 23 5 OIL PRESS...

Страница 6: ...ngland Wales Part J Heat producing appliances Building Standards Scotland Technical Standard Part F Heat producing appliances and storage of liquid and gaseous fuel Building Regulations Northern Irela...

Страница 7: ...torage tank to the appliance must be fitted with a remote acting fire valve operating at 150 F fitted with an appropriate length of capillary to enable the valve body to be located externally at the p...

Страница 8: ...Site requirements 7 DESN 510519 FIG 1...

Страница 9: ...iance must not be less than the equivalent area of 150mm diameter flue pipe and be at least 4 5m high The flue pipe must not be less than 150mm internal diameter Flue pipes and fittings between the ap...

Страница 10: ...uld be positioned in the vertical plane to reduce the risk of blockage Ducts should be sized so as to reduce resistance to air flow 4 The ventilation requirement for kitchens in Part F of the Building...

Страница 11: ...bject to a maximum head of 18 25m The heating system must be designed and adjusted if necessary to give a temperature differential across the boiler at full output of 10 14 C When horizontal runs are...

Страница 12: ...tion with the hot water channel gives priority to either the domestic hot water or the supply of hot water for central heating DHW if external controls are fitted It is recommended that independent te...

Страница 13: ...The installation should be protected by a 30mA Residual Current Circuit Breaker RCCB The minimum requirement for the power cable is that it should be a 3 core PVC sheathed flexible cord 85 C min at l...

Страница 14: ...13 Site requirements FIG 4...

Страница 15: ...ust be an air gap of 25mm between the wall and the rear of the cooker Fit the rear distance brackets as shown in Fig 5 Whenever possible it is recommended that the skirting board is removed for the wi...

Страница 16: ...inate the flue system in accordance with the regulations in force 4 Lift up the insulating covers and remove the hotplate using lifting hooks provided See Fig 7 5 Remove the insulation pad B 6 Remove...

Страница 17: ...e valve through the grommet in the left hand side panel and locate in the clips provided 2 Connect the flexible hose to the outlet pipe from the oil filter 3 Before connecting the flexible oil pipe to...

Страница 18: ...NDER STAT ZONE VALVE S ETC IF FITTED PUMP SUPPLY THE CIRCULATING PUMP MUST BE CONNECTED DIRECTLY TO THIS SUPPLY PUMP SUPPLY THE CIRCULATING PUMP MUST BE CONNECTED DIRECTLY TO THIS SUPPLY 3 AMP PERMANE...

Страница 19: ...n open allowing the burner to fire Until all the air from the oil pump is flushed out there may be some flame instability resulting in the burner locking out This will be shown by the burner stopping...

Страница 20: ...w and insert the sensing end of a portable indicator to check the CO2 Carbon Dioxide level Adjust the boiler burner air intake until a reading of 11 5 CO2 is recorded on the indicator Check Smoke Remo...

Страница 21: ...ing the water flow rate through individual heat emitters to ensure a satisfactory water temperature at each emitter 5 When the water system reaches working temperature check that the boiler thermostat...

Страница 22: ...ed from a service pipe under mains pressure provided that this pressure is acceptable to the local water authority See Fig 20 SEALED SYSTEM REQUIREMENTS Air or Nitrogen charge pressure bar Pre Pressur...

Страница 23: ...Sealed Systems 22...

Страница 24: ...23...

Страница 25: ...24...

Отзывы: