5.2.2
OPTIONAL EXTRAS:
a) Straight header
(Fig. 10)
item 3.
b) 1000 mm flue extension.
c) Concentric 90” in-line bend
(Fig. 10)
item 2.
d)
Concentric vertical flue
(Fig. 10)
item 1.
e) Concentric 45” in-line bend (Fig. 10)
i t e m 1 0 .
FLUE EXTENSION BOX CONTAINING
(Fig. 14):
1000 mm flue extension duct as an extra cost only
when requested for side and vertical flue applications
59 - Rubber seal 0 60
63 Air intake duct extension
64 - Flue exhaust duct extension
65 - Pipe centering spring
STRAIGHT HEADER BOX CONTAINING
(Fig. 13):
55 - Rubber seal 0 100
57 - Straight header supplied as an extra cost Only
when requested
59 Rubber seal 0 60
66 - Flue gas sample point
5.3
UNPACKING
Fig. 15
1) Open the top
of the carton
Fig. 13
Fig. 14
Fig. 17
3)
Turn the carton over,
with the boiler inside
and then pull the carton
Fig. 18
2) Rest the carton on
the floor (keeping the flaps open)
4) Rest the boiler on the floor and remove
the polystyrene guards
18
Содержание RSF 84E
Страница 42: ......
Страница 45: ...SECTION 9 ELECTRICAL SYSTEM DIAGRAM Fig 94 46...
Страница 46: ...47...
Страница 47: ...48...
Страница 48: ......
Страница 52: ...SECTION 11 EXPLODED PARTS DIAGRAM...
Страница 55: ...Chartists Way Morley Leeds LS27 9ET Telephone 0113 252 7007 Tfax 0113 238 0229...