PCB Board Replacement
Work Instructions
Pull Release
Lever
Service Hatch
A
Seat Switch
Console
Remove
Screws
C
New PCB
Board
Replace
Screws
H
Tools Needed for Installation:
• 8 mm or 10 mm wrench
• 5 mm Allen or T-Handle Wrench
• Phillips Screwdriver
• 1/4” Nut Driver
• Impact Drill
Replacing the PCB Board
1. Pull the release levers and open the service hatch (Fig.
A).
2. Remove the fender extension on the discharge (right)
side of the MPV using the 5 mm Allen wrench (Fig. B).
3. Remove the seat switch console using a Phillips
screwdriver (Fig. C).
4. Lift the seat switch console and locate the PCB board
(Fig. D).
5. Locate the bottom bolt (Fig. E). Depending on your
model this may be an 8 mm or 10 mm bolt. Remove both
bolts on the top and bottom of the PCB board.
6. Rotate the PCB board up to locate and remove the two
¼" screws (Fig. F). Detach old PCB board.
7. Locate new PCB board and ensure that a label, verifying
the new
Program
is has been installed, is located on the
bottom (Fig. G).
8. Install the new PCB board using the
1/4” Nut Driver.
(Fig.
H). Exercise care when connecting the new PCB board.
9. Mark the OLD PCB with an “X” using a grease pen and
immediately place in quarantine.
10. Replace the ¼" screws.
Bolt
PCB Board
Screws
E
Remove Bolt
B
D
F
Bottom
of PCB
Board
Program
Label
G
D e n v e r G l ob a l P r o duc t s 1 000 E as t P o we ll D r. | Li nc ol nt o n , N C 2 80 9 2 U. S . A
© 2 0 1 4 D en v e r Gl o b a l P ro du c t s | RATO A ll r i gh t s r es e rv e d .
Содержание MPV-7100
Страница 1: ...Raven 7100 Service Manual ...
Страница 2: ...12v Battery Exchange ...
Страница 4: ...12 Volt Relay Exchange ...
Страница 6: ...48 Volt Battery Pack Removal ...
Страница 8: ...Blade Motor Controllers ...
Страница 11: ...Carburetor Replacement ...
Страница 16: ...Contactor Fuse Replacement ...
Страница 21: ...Drive Motor Controller Replacement ...
Страница 27: ...Gas Gauge Check Replacement ...
Страница 30: ...Oil Separator Replacement ...
Страница 33: ...PCB Replacement ...