![Rauch AXIS H 30.2 EMC Скачать руководство пользователя страница 75](http://html1.mh-extra.com/html/rauch/axis-h-30-2-emc/axis-h-30-2-emc_instruction-manual_788198075.webp)
Commissioning
69
7
7.9.2
Running one pass
Layout:
Length of testing area: 60 to 70 m
Figure 7.21:
Layout for one pass
Preparing one pass:
Choose a similar fertiliser from the fertiliser chart and adjust the spreader ac-
cordingly.
Set the mounting height of the machine as specified in the fertiliser chart.
Make sure that the mounting height includes the top edge of the trays.
Check the spreading elements (spreading discs, spreader vanes, outlet) for
correct functioning and completeness.
Place two collecting vessels one after another at a distance of
1 m
in the over-
lap zones (between the tramlines) and one collecting vessel in the track (ac-
cording to
NOTICE
We recommend the layout plan up to a spreading width of
24 m
. A layout plan
for greater working widths is attached to the PPS5 practise test kit.
1/2x
1/2x
x
Содержание AXIS H 30.2 EMC
Страница 28: ...Safety 3 22...
Страница 35: ...Technical data 29 4 Figure 4 6 Hydraulic motor for spreading disc drive 1 Hydraulic motor...
Страница 46: ...Axle load calculation 5 40...
Страница 48: ...Transportation without tractor 6 42...
Страница 100: ...Spreading operation 8 94...
Страница 132: ......