Machine settings
85
7
7.10.2 Implementing the calibration
Requirements:
The metering slide is closed.
PTO and tractor engine are switched off and locked to prevent unauthorised
starting.
An adequately sized hopper is ready for collecting the discharged spreading
material. The empty weight of the hopper is known.
Using the fertiliser chart, the pre-set values for the metering slide stop are de-
termined and known.
Proceed as follows:
1.
Mount the agitator indicated in the fertiliser chart for the respective spreading
material. Refer to
7.9: Use the fertiliser chart, page 63
2.
Fill the machine.
3.
Place a foil or a hopper for collecting the spreading material under the machine.
4.
Set the adjustment lever of the spreading width limiter to the lower stop (low-
est spreading width).
n
WARNING
Risk of injury due to chemicals
Discharged spreading material may cause injury to eyes and nasal
mucous membranes.
Wear protective goggles during the calibration test.
Before running the calibration test, ensure that all people
leave the hazard zone of the machine.
NOTICE
Select the calibration time to obtain the maximum spreading material quantity.
The greater the quantity, the greater the precision of the measurement (e. g.:
Target output volume: 10 kg/min, calibration test time: 3 min, used spreading
material quantity: 30 kg).
n
WARNING
Risk of injury due to rotating machine components.
Contact with rotating machine components (universal drive shaft,
spreading discs and agitators) may cause bruises, abrasions and
crushing injuries. Body parts or objects may be caught and pulled in.
Keep clear from rotating hubs while the machine is running.
Before running the calibration test, ensure that all people
leave the hazard zone of the machine.
Содержание AXEO 2.1
Страница 8: ...Table of Contents VI ...
Страница 40: ...Transportation without tractor 5 32 ...
Страница 104: ...Spreading work 8 96 ...
Страница 118: ...Maintenance and service 9 110 ...
Страница 130: ...Axle load calculation 13 122 ...
Страница 136: ......