Commissioning
6
40
The machine is installed at the three-point linkage (rear power lift) of the tractor.
Installation instructions:
The AXEO 2.1/6.1 is
only
to be connected to a category II tractor with cate-
gory I clearance and using reducing sleeves.
AXEO 18.1 is only to be connected to a category III tractor with category II
clearance and using reducing sleeves.
AXEO 2.1 is only to be connected to a category 1N tractor using an adapter.
-
The maximum payload is reduced to 300 kg.
The lower and upper link pins must be secured with lynch pins or spring clips.
Always install the machine horizontally.
To ensure correct cross-distribution of the spreading material, the machine
must be mounted as specified in the fertiliser chart.
In order to avoid sideways movements during spreading, make sure that the
machine does not have too much sideways play.
-
The lower link arms of the tractor are to be braced by means of stabilising
struts or chains.
NOTICE
We recommend using lower link hooks with a hydraulic upper link for safety and
comfort.
Содержание AXEO 2.1
Страница 8: ...Table of Contents VI ...
Страница 40: ...Transportation without tractor 5 32 ...
Страница 104: ...Spreading work 8 96 ...
Страница 118: ...Maintenance and service 9 110 ...
Страница 130: ...Axle load calculation 13 122 ...
Страница 136: ......