C
HAPTER
3:
C
ONNECTING
T
O AND
U
SING
N
ODES
V
IA THE
CC-SG
A
CCESS
C
LIENT
39
5.
Click the
Operation
drop-down arrow, and select
Power On
,
Power Off
,
Power Cycle
, or
Graceful Shutdown
from the list.
6.
If you selected multiple interfaces, type the number of seconds that should elapse between
interfaces in the
Sequence Interval (seconds)
field.
7.
Click
OK
to begin the power control operation. Click
OK
in the confirmation message that
appears to start the operation. Another message will appear when the operation completes, to
give you the status of the operation.
Node Group Power Control
Node Group Power Control allows you to control power for all or selected interfaces in a node
group. For power on and power off operations, you can select the order in which interfaces are
powered on and off.
Control power for all or selected interfaces in a node group
1.
Click the Power Control tab at the top of the screen, and then click Node Group Power
Control to open the Node Group Power Control screen.
2.
Click the
Node Group
drop-down arrow and select the node group that you want to control
power for from the list. The
Available
list displays all interfaces in the selected node group.
3.
In the
Available
list, select the specific interface that you want to perform power control on,
and then click
Add
to move the interface to the
Selected
list. Repeat this step until you have
added all necessary interfaces to the
Selected
list.
4.
You must put the interfaces in the
Selected
list into the order in which you would like CC-SG
to perform the power operation. Select an interface in the
Selected
list, and then click the up
and down arrows to move the interfaces into the desired sequence.
5.
Click the
Operation
drop-down arrow, and select
Power On
,
Power Off
,
Power
Cycle
, or
Graceful
Shutdown
from the list.
6.
If you selected multiple interfaces, type the number of seconds that should elapse between
interfaces in the
Sequence Interval (seconds)
field.
7.
Click
OK
to begin the power control operation. Click
OK
in the confirmation message that
appears to start the operation. Another message will appear when the operation completes, to
give you the status of the operation.
Содержание CC-SG
Страница 2: ...This page intentionally left blank...
Страница 8: ......
Страница 10: ...2 COMMANDCENTER SECURE GATEWAY USER GUIDE This page intentionally left blank...
Страница 53: ...46 COMMANDCENTER SECURE GATEWAY USER GUIDE...
Страница 57: ...50 COMMANDCENTER SECURE GATEWAY USER GUIDE 255 80 3100...