26 C
OMMAND
C
ENTER
S
ECURE
G
ATEWAY
U
SER
G
UIDE
Node Group Power Control
You can power on, power off, cycle power, and perform graceful shutdown for all nodes in a
node group that has associated power interfaces. This might be useful if you needed to power
down all nodes in a node group so that you can rewire the rack that they are mounted on, or if you
need to perform other types of maintenance on a node group.
1.
Click the
Nodes
tab.
2.
On the
Nodes
menu, click
Group
Power Control
. The
Group Power Control
screen
appears.
Figure 26 Group Power Control Screen
3.
Click the
Node Group
drop-down arrow and select the node group whose power you want to
control from the list.
4.
In the
Available
list, select the specific interface that you want to perform power control on,
and then click
Add
to move the interface to the
Selected
list. Repeat this step until you have
added all necessary interfaces to the
Selected
list. If you must remove an interface, select the
interface in the
Selected
list, and then click
Remove
.
5.
You must put the interfaces in the
Selected
list into the order in which you would like CC-SG
to perform the power operation. Select an interface in the
Selected
list, and then click the up
and down arrows to move the interfaces into the desired sequence.
6.
Click the
Operation
drop-down arrow, and select
Power On
,
Power Off
,
Power
Cycle
or
Graceful
Shutdown
from the list.
7.
If you selected
Power On
,
Power Off
or
Graceful Shutdown
in the
Operation
field, type
the number of seconds, from 0-120, that should elapse between interfaces in the
Sequence
Interval (seconds)
field.
8.
Click
OK
to send the power operation request through the selected interfaces. A confirmation
message appears in the screen. The message text will update when the power control
operation completes successfully. If the power control operation cannot be completed, a
message with more information will appear in a new window.
9.
Repeat the steps in this section to manage power for other node groups.
Содержание CC-SG
Страница 2: ...This page intentionally left blank...
Страница 8: ......
Страница 10: ...2 COMMANDCENTER SECURE GATEWAY USER GUIDE This page intentionally left blank...
Страница 53: ...46 COMMANDCENTER SECURE GATEWAY USER GUIDE...
Страница 57: ...50 COMMANDCENTER SECURE GATEWAY USER GUIDE 255 80 3100...