9060 High Voltage Controller - Installation
CP-13-05.3
20
For installations where it is required to run the
AC input wiring in conduit, perform the follow-
ing:
1.
Ensure the AC line cord is unplugged
and remove the AC inlet receptacle wiring
from TB1-N, TB1-L1 and TB1-EARTH
GROUND (See Figures 9 and 10).
2. Remove the mounting hardware from the
AC inlet receptacle and remove it from the
side of Controller.
3. Install the Conduit Adapter Plate (See
Accessories Section) in the hole where the
AC inlet receptacle was removed (see
Figure 11).
4. Install the AC input wiring (0.8mm
2
(18AWG) minimum) through the Conduit
Adapter Plate using conduit and wire to TB1
as follows:
In general, conduit must be used for
approved AC installation, however, if na-
tional and local codes permit, the AC
power may be supplied via the factory
supplied line cord. If conduit is utilized,
the Controller AC input wiring may be
routed through an optional explosion
proof switch mounted on or near the
spray booth where it will be convenient to
the operator.
N O T E
Hot/Line
to TB1-L1
Neutral/Common to TB1-N
Ground
to TB1-EARTH GROUND
Figure 9: Location of TB1 & TB2 in Controller
Figure 10: TB1 Interlock Wiring
Figure 11: Installation of Conduit Adapter Plate
Содержание 80100 Series
Страница 2: ...CP 13 05 3...
Страница 5: ...CP 13 05 3...
Страница 11: ...9060 High Voltage Controller Safety CP 13 05 3 6 N O T E S...
Страница 27: ...9060 High Voltage Controller Installation CP 13 05 3 22 Figure 12 Controller Schematic...
Страница 51: ...9060 High Voltage Controller Maintenance CP 13 05 3 46 N O T E S...